Article
Publication date: 1 March 2006

S Meeampol and S O Ogunlan

This study investigates the cost and time performance of highway projects from the viewpoint of the public owner. It differs from previous studies which focused on the contractor’s

2248

Abstract

This study investigates the cost and time performance of highway projects from the viewpoint of the public owner. It differs from previous studies which focused on the contractor’s perspective on project performance. A total of 13 success factors were identified from literature and the opinions of experienced engineers. Data was collected from 99 projects handled by the Department of Highways (DOH) in Thailand Discriminant analysis was used in this study to build the cost and time predictive models, which were generated from samples of cases, which had already been grouped and known as successful and unsuccessful projects. The models were then applied to new cases with measurements for the predictor variables, to predict that the projects were either successful or unsuccessful. The results show that success in cost performance depends on the management of construction resources, budget management, construction method, and communication. By contrast, schedule management and human resource management inhibit cost performance. Success in time performance depends on choice of construction method, management of construction resources, schedule management, supervision and control, and communication. Quality management, budget management, human resource management, owner involvement, and team relationships impede time performance

Details

Journal of Financial Management of Property and Construction, vol. 11 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Article
Publication date: 1 January 1998

STEPHEN O. OGUNLANA and WEI PIEN CHANG

The groundbreaking works of Maslow and Herzberg have been used by many researchers on construction worker motivation. These two classical theorists were used as the basis for a…

2340

Abstract

The groundbreaking works of Maslow and Herzberg have been used by many researchers on construction worker motivation. These two classical theorists were used as the basis for a survey of needs, motivators and demotivators on high‐rise building construction sites in Bangkok, Thailand. The needs and felt motivators of construction workers in Bangkok are low on the Maslow hierarchy. The agreement between workers and supervisors regarding needs is strong. However, the agreement on motivators and demotivators is rather weak. This may lead to the use of inappropriate methods for motivating workers. A comparison of the results of the present survey with other studies showed that attempts to motivate workers should take cognizance of the cultural context in order to achieve good results.

Details

Engineering, Construction and Architectural Management, vol. 5 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Available. Content available
Book part
Publication date: 26 April 2017

Prince Boateng, Zhen Chen and Stephen O. Ogunlana

Free Access. Free Access

Abstract

Details

Megaproject Risk Analysis and Simulation
Type: Book
ISBN: 978-1-78635-830-1

Access Restricted. View access options
Article
Publication date: 1 December 2002

S. Chritamara, S.O. Ogunlana and N.L. Bach

Design and build (D/B) construction methods have gained more importance in recent years for their potential advantages in improving project performance. There are, however, a…

2427

Abstract

Design and build (D/B) construction methods have gained more importance in recent years for their potential advantages in improving project performance. There are, however, a number of problems that are commonplace in D/B procurement, which, when they interact with each other, can lead to project time and cost overrun problems. The most important among them are design changes, together with communication and coordination lapses among concerned parties. Past research has focused only on the characteristics of the traditional construction, or separate sub‐systems such as different phases or human resource input to projects. An attempt is made in this paper to improve D/B project time and cost performance. A generic system dynamics model is developed that incorporates major sub‐systems and their relationships inherent in D/B constructions projects. It is validated and calibrated for a typical large D/B infrastructure project using time and cost overrun problems experienced in Thailand. Extensive simulations with many policies, individually or in various combinations, show that improvement in time or cost can be made with proper policy combinations that reflect strong interactions between the whole design and build system and can be derived only if these interactions are accounted for. To achieve overall improvement in both time and cost, the combination of full overtime schedule, average material ordering, and fast track construction with moderate crashing of design is most appropriate. If cost is the focus, extending the construction schedule, combined with material ordering based on actual need, and design and build with traditional construction method is the best solution.

Details

Construction Innovation, vol. 2 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Access Restricted. View access options
Article
Publication date: 1 February 1999

SDHABHON BHOKHA and STEPHEN O. OGUNLANA

The application of an artificial neural network (ANN) to forecast the construction duration of buildings at the predesign stage is described in this paper. A three‐layered…

395

Abstract

The application of an artificial neural network (ANN) to forecast the construction duration of buildings at the predesign stage is described in this paper. A three‐layered back‐propagation (BP) network consisting of 11 input nodes has been constructed. Ten binary input nodes represent basic information on building features (i.e. building function, structural system, foundation, height, exterior finishing, quality of interior decorating, and accessibility to the site), and one real‐value input represents functional area. The input nodes are fully connected to one output node through hidden nodes. The network was implemented on a Pentium‐150 based microcomputer using a neurocomputer program written in C+ +. The Generalized Delta Rule (GDR) was used as learning algorithm. One hundred and thirty‐six buildings built during the period 1987–95 in the Greater Bangkok area were used for training and testing the network. The determination of the optimum number of hidden nodes, learning rate, and momentum were based on trial‐and‐error. The best network was found to consist of six hidden nodes, with a learning rate of 0.6, and null momentum. It was trained for 44700 epochs within 943 s such that the mean squared error (judgement) of training and test samples were reduced to 1.17 × 10−7 and 3.10 × 10−6, respectively. The network can forecast construction du‐ration at the predesign stage with an average error of 13.6%.

Details

Engineering, Construction and Architectural Management, vol. 6 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 21 March 2019

Zehra Waheed and Stephen O. Ogunlana

This study aims to investigate projects as social exchange networks, focussing on identifying knowledge brokers within the project network where they are key holders and…

265

Abstract

Purpose

This study aims to investigate projects as social exchange networks, focussing on identifying knowledge brokers within the project network where they are key holders and disseminators of end-user needs. The purpose is to augment current theory through a practice lens so that building end-user requirements can be better incorporated in evolving project ecosystems.

Design/methodology/approach

An interpretive, an inductive case study is used to map knowledge brokers during a complex construction and co-location project. During the wider study, a variety of methods including archival data, interviews and questionnaires along with social network analysis (SNA) were used. The mixed methodology used has been pivotal in the triangulation of data from various sources. However, the output of SNA presented in this paper relies mostly on interviews and questionnaires administered to the project’s core network. Network relationships were mapped with knowledge of user requirements, being the key determinant of the binary relationships between actors.

Findings

The research found certain roles to be central knowledge brokers of knowledge related to end-user processes, including real estate and strategic planning, building operations and management, human and environmental factors, planning and project management and facility and service delivery. The knowledge of the above roles, albeit in a contextually situated case study, augments current understanding of which roles to tap on during project execution for better representation of end-user needs.

Practical implications

The research site is representative of a complex network of construction project stakeholders, including several categories of end-users and their representatives. The study demonstrates the use of the project-as-practice approach, whereby project theory is seen to emerge directly from practice. This has impact on practice as emergent theory about knowledge transfer and knowledge brokerage is essentially practice-led and hence more useful and relate-able to practitioners.

Originality/value

Research presented here is novel in terms of its approach towards understanding end-user needs such as need for privacy, control, attachment and interaction during construction projects. This is done through the identification of relevant knowledge brokers. The study uses SNA as an analytical tool to map knowledge transfers through the project’s network. End-user requirements are usually captured in the front-end of projects as specifications and deliverables, as new challenges emerge during execution, changes are required to the project’s direction and outcomes. It is therefore imperative that end-user needs are re-identified through knowledge brokers holding key knowledge. This allows project managers to prepare appropriate responses to changing project ecosystems.

Details

Journal of Corporate Real Estate , vol. 21 no. 1
Type: Research Article
ISSN: 1463-001X

Keywords

Access Restricted. View access options
Article
Publication date: 1 December 2007

David J Lowe and Martin Skitmore

The focus of this paper is on the influence of the learning climate in organisations on practitioner competence. Practitioners in the context of the paper are Chartered Quantity…

985

Abstract

The focus of this paper is on the influence of the learning climate in organisations on practitioner competence. Practitioners in the context of the paper are Chartered Quantity Surveyors, while competency is measured in terms of the accuracy of construction contract price forecasts. The results indicate that: The learning climate within quantity surveying practices is perceived to be supportive in terms of human support and to a lesser extent working practices, but less supportive in terms of staff development systems (specifically, the use of appraisal systems and the provision of resources and development facilities). The degree of accuracy of the subjects’ forecasts was found to improve as their perception of the overall learning climate, working practices, staff development systems and specifically items relating to the opportunity to introduce new skills, discussion of prob‐lems, working practices, provision of resources and the identification of needs increased. It is recommended that surveying organisations assess their ability to provide an ef‐fective learning environment and to address any deficiencies, especially in the provision of staff development systems, to improve individual forecasting performance. Further, they should consider introducing effective feedback mechanisms that require both the individual to critically reflect on their own performance and the organisation to provide effective constructive feedback on an individual’s performance.

Details

Journal of Financial Management of Property and Construction, vol. 12 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Article
Publication date: 13 February 2024

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

Delay in housing adaptation is a major problem, especially in assessing if homes are suitable for the occupants and in determining if the occupants are qualified for the Disabled…

60

Abstract

Purpose

Delay in housing adaptation is a major problem, especially in assessing if homes are suitable for the occupants and in determining if the occupants are qualified for the Disabled Facilities Grant (DFG). This paper describes the development of two self-administered intelligent integrated assessment tools from the DFG Adapt-ABLE system: (1) The Home Suitability Assessment Platform, which is a preventive mechanism that allows assessment of the suitability of homes based on occupants’ mobility status and (2) an indicative assessment platform that determines if the applicants are qualified for the DFG to prevent lengthy delays.

Design/methodology/approach

The adopted method aligned with a development study approach: a grounded literature review, a severity measurement approach, two stakeholder engagement workshops, four brainstorming sessions and four focus group exercises. The system development relied on Entity–Relationship Diagram (ERD) technique for data structures and database systems design. It uses DFG context sensitivity with alignment with DFG guidance, interlinkages and interoperability between the assessment tools and other platforms of the integrated Adapt-ABLE system.

Findings

The assessment tools are client-level outcomes related to accessibility, usability and activity based on the assessment process. The home suitability platform shows the percentage of the suitability of a home with assessment results that suggest appropriate action plans based on individual mobility status. The indicative assessment combines the function of referral, allocation, assessment and test of resources into an integrated platform. This enables timely assessment, decision-making and case-escalation by Occupational Therapists based on needs criteria and the eligibility threshold.

Originality/value

These assessment tools are useful for understanding occupants’ perception of their physical housing environment in terms of accessibility, suitability and usability based on basic activities of daily living and their mobility status. The indicative self-assessment tool will substantially cut down the application journey. The developed tools have been recommended for use in the CSJ Disability Commission report and the UK government Guidance on DFGs for local authorities in England.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Access Restricted. View access options
Article
Publication date: 18 November 2011

Braj Kishor Mahato and Stephen O. Ogunlana

The purpose of this paper is to present a model for a comprehensive and integrated approach to managing interface conflict from the early stages of a dam construction project.

2923

Abstract

Purpose

The purpose of this paper is to present a model for a comprehensive and integrated approach to managing interface conflict from the early stages of a dam construction project.

Design/methodology/approach

A case study methodology is adopted. Following comprehensive literature review, qualitative data were gathered from case studies through interviews conducted on the Middle Marsyangdi Hydroelectric Project (MMHEP) dam project in Nepal. Causal loop diagrams on the typical evolution of key indicators of interface conflict were then developed and a simulate‐able model of interface conflict was derived using system dynamic modeling technique. The model was then simulated to derive viable policies for future management of dam construction projects in developing countries.

Findings

The study reveals that interface conflicts at the construction stage of projects are caused mainly by lack of effective Environmental Impact Assessment, public participation and mutual consultation, on timely basis and accurate information from the early stages of projects. The system dynamic model is able to replicate general behavior of evolution of interface conflict in a dam construction project. Furthermore, the study explored three viable policies to avoid and minimize interface conflict in the construction stage of a dam project. The policies were tested and demonstrated to be useful in improving the value of projects to stakeholders. It is demonstrated that a combination of policies is better than adopting a single policy to stakeholder management.

Originality/value

The paper demonstrates the utility of system dynamics as a modeling tool for understanding the dynamics of conflicts on dam construction projects. The model should be helpful to policy makers on large projects, especially those likely to be subject to social and environmental conflict. Policies derived from the model have the potential of being used to assess and take proactive measures to manage conflicts effectively and efficiently from early in a project's life.

Details

Built Environment Project and Asset Management, vol. 1 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Access Restricted. View access options
Article
Publication date: 19 February 2020

Oladimeji A. Olawale, Lukumon O. Oyedele and Hakeem A. Owolabi

The purpose of this study is to commence the discourse on the non-inclusiveness of the dynamics of reputation within the construction industry by identifying and examining the key…

591

Abstract

Purpose

The purpose of this study is to commence the discourse on the non-inclusiveness of the dynamics of reputation within the construction industry by identifying and examining the key product and process drivers of reputation in mega-construction projects.

Design/methodology/approach

Data was collected through an exploratory sequential mixed methods approach which commences with a qualitative study and culminates with a quantitative study to identify product and process drivers of reputation in mega-construction projects.

Findings

The findings suggest that “project quality”, “robust social and environmental sustainability plan”, “project team competence and interpersonal relationship” and “project process efficacy” are the four key drivers influencing the reputation of mega-construction projects.

Research limitations/implications

The findings of this study are solely based on the perception of UK construction practitioners; therefore, the results may only be considered valid in this context. The identification of these key drivers provides a pathway where stakeholders, professionals and organisations can identify and prioritise critical issues associated with enhancing and sustaining the reputation of mega-construction projects.

Originality/value

Findings of this research make a significant contribution to the discourse on the concept of reputation within the construction industry by identifying its specific drivers of reputation.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords