M.E. Murphy, R.S. Perera and S.G. Heaney
A perceptible gap has been observed in the literature concerning the adoption of product innovations into construction projects by designers (architects and engineers). This is…
Abstract
Purpose
A perceptible gap has been observed in the literature concerning the adoption of product innovations into construction projects by designers (architects and engineers). This is seen specifically in the scant investigation into this group as a relevant source of construction innovation. It is also seen in the failure of current literature to reflect this group's interpretation of innovation linkages. The result is a gap in knowledge and a difficulty in correlating construction innovation models to the work of designers. The purpose of this paper is to seek to address this gap by identifying and classifying recent examples of innovation using an accepted construction innovation model.
Design/methodology/approach
The primary objective was to expand this accepted construction innovation model's interpretation of innovation linkages and identify those linkages that directly relate to the work of designers and address aspects of building form rather than merely aspects of cost and process efficiencies.
Findings
The results revealed that the interpretation of building linkages by designers were much more diverse than those as perceived by the manufacturers and suppliers of the products. New linkages included aspects of building orientation, facade design, services integration, floor layouts, lighting design, fire safety and sustainability. In some cases, the designer's interpretation of the product's linkages had substantial implications for the marketing strategy of the products, and even the potential to change the classification grouping of the innovation.
Originality/value
This paper forms part of a wider piece of research into the management of innovation for construction professionals. The timely research is necessary to motivate design professionals in the adoption of new product innovations into their building designs.
Details
Keywords
Ernest Effah Ameyaw and Albert P. C. Chan
Allocating risk in public–private partnership (PPP) projects based on public–private parties’ risk management (RM) capabilities is a condition for success of these projects. In…
Abstract
Allocating risk in public–private partnership (PPP) projects based on public–private parties’ risk management (RM) capabilities is a condition for success of these projects. In practice, however, risks are allocated to these parties beyond their respective RM capabilities. Too much risk is often assigned to the private or public party, resulting in poor RM and costly contract renegotiations and terminations. This chapter proposes a methodology based on fuzzy set theory (FST) in which decision makers (DMs) use linguistic variables to assess and calculate RM capability values of public–private parties for risk events and to arrive at risk allocation (RA) decisions. The proposed methodology is based on integrating RA decision criteria, the Delphi method and the fuzzy synthetic evaluation (FSE) technique. The application of FSE allows for the introduction of linguistic variables that express DMs’ evaluations of RM capabilities. This provides a means to deal with the problems of qualitative, multi-criteria analysis, subjectivity and uncertainty that characterise decision-making in the construction domain. The methodology is outlined and demonstrated based on empirical data collected through a three-round Delphi survey. The public–private parties’ RM capability values for land acquisition risk are calculated using the proposed methodology. The methodology is helpful for performing fuzzy-based analysis in PPP projects, even in the event of limited or no data. This chapter makes the contribution of presenting a RA decision-making methodology that is easy to understand and use in PPP contracting and that enables DMs to track calculations of RM capability values.
Details
Keywords
Lobna Abdellatif and Mohamed Zaky
The current paper explores the effect of private market characteristics on the access of small and medium enterprises (SMEs) to public markets in some sectors. Using survey data…
Abstract
The current paper explores the effect of private market characteristics on the access of small and medium enterprises (SMEs) to public markets in some sectors. Using survey data of small and medium enterprises in the pharmaceutical sector in Egypt, we confirmed this effect. We found that regulations of drugs pricing and registration in the private market constrained the capacity of those firms to compete in the public markets. However, some other factors play it the other way. The policy implications of these findings indicate that governments need to account for private markets characteristics when designing support packages for smaller enterprises in public procurement markets.
Martina Murphy, George Heaney and Srinath Perera
The purpose of this paper is to present a methodology for extracting innovation constraints from building projects through stakeholder management competencies and failure mode and…
Abstract
Purpose
The purpose of this paper is to present a methodology for extracting innovation constraints from building projects through stakeholder management competencies and failure mode and effect analysis (FMEA).
Design/methodology/approach
The methodology was an iterative grounded theory process using case studies. A literature‐based concept model was generated which mapped project procurement stages against the innovation process. Constraints and stakeholder management strategies were extracted from 30 case studies using content analysis and mapped against the procurement stages. FMEA was used to evaluate the criticality of the constraints. For the purposes of this paper, a sample case study was detailed and referred to as the pilot study. The m\ethodology was applied to all the case studies and a schedule of constraints (SoC) extracted.
Findings
This paper evidenced that it is not project constraints which require management to sustain innovation but rather failures in stakeholder competency. This study established the benefits of FMEA as a risk assessment tool for construction innovation research and generated a database of innovation constraints which can be used as a benchmarking framework for future research.
Originality/value
Previous construction innovation research has focused on established project management techniques to manage innovation. This study identified that rather than a process‐driven approach, a stakeholder‐centred approach is required, where successful innovation delivery is incumbent on the right stakeholder competencies being in place at the appropriate stages of the procurement process. The benefit of this contribution is an established risk assessment methodology which can be used by project stakeholders when adopting innovation into construction projects.
Details
Keywords
In recent years, Health Promotion Board (HPB) has made a strategic shift from a traditional health education approach to an eco-systemic approach in health promotion, where the…
Abstract
In recent years, Health Promotion Board (HPB) has made a strategic shift from a traditional health education approach to an eco-systemic approach in health promotion, where the Board engages and harnesses the collective power of the 3 Ps (People, Private, and Public). The procuring of core services is a key enabler to support HPB's focus areas in tobacco control, mental well-being, health screening, obesity prevention, nutrition, dietetic services, chronic disease education, etc. In tandem with the Board's strategic shift, the procurement function has taken on strategic importance and is now functioning as an independent department, reporting to HPB's CEO. Fundamentally, HPB Procurement Department has changed the way it interacts with the business as it stands by the belief that the real procurement value goes beyond compliance (Caldwell & Howard, 2010). “Proper”, “simpler”, “faster”, “closer” and “cheaper” are now its mantra for procurement excellence. The objective of this paper is to highlight the transformation journey that HPB's Procurement Department undertook to deliver the results, impact and value to the stakeholders.
Robert Eadie, Srinath Perera and George Heaney
The purpose of this paper is to report the production of the key process areas (KPAs) for an e‐capability maturity model for construction organisations, based on drivers and…
Abstract
Purpose
The purpose of this paper is to report the production of the key process areas (KPAs) for an e‐capability maturity model for construction organisations, based on drivers and barriers to e‐procurement.
Design/methodology/approach
Previous researchers have recognised the positive consequences of possessing a model to sustain the embedment of any business process within an organisation. The capability maturity model progressed into one of the most internationally recognised since the release of the Software Capability Maturity Model (CMM) in 1991. Since then, many CMMs have been developed. This paper reports on how a CMM based on drivers and barriers to e‐procurement identified in Eadie et al. can be developed to form the KPAs in the formation of a model to gauge the maturity of an organisation in relation to e‐procurement.
Findings
It was found that factor analysis could be used as a data reduction technique to reduce the 20 drivers and 32 barriers identified as being applicable to e‐procurement in construction, to 12 KPAs: Quality management system; Cost management system; Intergroup coordination; Time management system; Operational analysis; Organisational change management system; Integrated teaming; Governance management system; Requirements development; Knowledge management system; Integration management system; and Organisational environment.
Originality/value
This paper provides particulars of a research project which uses factor analysis to produce a set of KPAs from the drivers and barriers identified in Eadie et al. These KPAs are then subjected to a mapping process linking them to maturity levels to develop a CMM to analyse the e‐procurement capability of construction organisations. This mapping will be reported in a later paper. This e‐readiness of organisations will indicate the current state of a construction organisation in terms of its readiness to carry out e‐procurement. The paper describes in detail the identification of the KPAs.
Details
Keywords
Connel Bottom, Stanley McGreal and George Heaney
Office buildings in the City of London accommodate a wide variety of tenant organisations whose business characteristics and property requirements differ. Physical design/quality…
Abstract
Office buildings in the City of London accommodate a wide variety of tenant organisations whose business characteristics and property requirements differ. Physical design/quality attributes also differ between buildings and, therefore, either constrain or support specific business activities. The results of a survey carried out using a sample of investment properties and their tenants within the City illustrate the existence of these variations. In particular, the difference between tenant organizations’ perceived supply and demand for individual building design/quality factors is highlighted showing areas of general under‐performance. The owners of City of London office buildings, typically the financial institutions, are concerned with the functionality of their properties which influence the short‐ and long‐term returns of this particular type of asset. Information originating from the utilisation of building appraisal techniques is of considerable use within any property management decision‐making process and in particular the identification of potential problems associated with building obsolescence.
Details
Keywords
Thadsin Khamkanya, George Heaney and Stanley McGreal
The office is considered as a strategic resource that can support knowledge‐based organisations to gain competitive advantage and operational efficiency. Although the modern…
Abstract
Purpose
The office is considered as a strategic resource that can support knowledge‐based organisations to gain competitive advantage and operational efficiency. Although the modern scholar emphasises the role of user involvement in workplace design and management, there is little evidence showing how it can be linked to occupancy cost performance. The purpose of this paper is to investigate benefits of a user‐centric workplace practice by focusing on working time and space utilisation practice of office users.
Design/methodology/approach
A scenario‐based approach was designed to analyse office occupancy cost performance. A questionnaire survey was conducted from a number of UK‐based offices to create three workspace utilisation scenarios, namely, existing, property‐centric and user‐centric. Key comparison criteria include potential areas of savings, potential total cost savings and cost saving per person.
Findings
It was found that a user‐centric approach reflects an opportunity to save annual occupancy costs in terms of total costs and cost per person where users indicated how they utilised working time and space. In return, the organisations can gain more productivity from office users who are likely to perform better when they can work in the preferred workplace practice.
Practical implications
By adopting this approach, organisations can understand the occupancy characteristics of the offices from multi perspectives, leading to better management in office premises.
Originality/value
This paper is concerned with the analysis of how to achieve higher office efficiency by focusing on office user's working time and space utilisation practice.
Details
Keywords
Scholars have suggested that the current dynamics within the provision of public services have shaped traditional administration into governance by contract. Under such…
Abstract
Scholars have suggested that the current dynamics within the provision of public services have shaped traditional administration into governance by contract. Under such conditions, restructuring public procurement, specifically within the technological capabilities available within e-procurement, has often been associated with manifold positive financial and policy outcomes. The supposed benefits of digitalizing public procurement are legion, yet they are often assumed and rarely grounded in hard evidence. Based on the results of a survey of procurement specialists (n=499), this article suggests that in its current form e-procurement adoption is failing to uphold the transformative benefits that it is regularly attributed within popular discourse. An extensive literature review is undertaken in order to construct practical understandings of the factors that could explain the rather disappointing early developments. The paper offers a practice oriented normative model that would increase the probability of achieving transformative dynamics as a result of e-procurement adoption.
Robert Eadie, Srinath Perera and George Heaney
Two main types of models are used worldwide in consideration of the impact of Information Communication Technology (ICT) processes in construction: capability maturity models…
Abstract
Purpose
Two main types of models are used worldwide in consideration of the impact of Information Communication Technology (ICT) processes in construction: capability maturity models (CMM) and e‐readiness models. The purpose of this paper is to review the structure behind the different models, their applicability to construction and indicate how organisations move between the levels in a CMM.
Design/methodology/approach
This study investigates the literature behind eight e‐readiness models and 53 CMMs.
Findings
The findings indicate 88 per cent of maturity‐based CMM models linked to five maturity levels, with the remainder using four. CMMs have common features: the process/application is described by maturity levels; Key Process Areas (KPA) provide the features to allow movement; and the levels are arranged and attained systematically, lowest to highest. Publication dates and trends indicate the rate of CMM publication is increasing (most in 2009), conversely, e‐readiness models are not (most published in 2004).
Practical implications
It is expected that the number of CMMs will increase; conversely, e‐readiness models may not. E‐readiness models have not been adopted by other industries and applications. However, CMMs, although initiated in software engineering, have progressed to incorporate construction models which cover processes as diverse as financial management and documentation. This suggests that a CMM is more applicable for applications such as e‐business in construction.
Originality/value
The paper significantly expands that of Man in 2007 who listed 22 CMM models. This paper categorises a further 31 models and indicates construction applicability, combined with a review of e‐readiness models for the first time.