Rachid Benmansour, Hamid Allaoui, Abdelhakim Artiba, Serguei Iassinovski and Robert Pellerin
The purpose of this study is to propose and model an integrated production‐maintenance strategy for a failure‐prone machine in a just‐in‐time context.
Abstract
Purpose
The purpose of this study is to propose and model an integrated production‐maintenance strategy for a failure‐prone machine in a just‐in‐time context.
Design/methodology/approach
The proposed integrated policy is defined and a simulation model is developed to investigate it.
Findings
The paper focuses on finding simultaneously two decision variables: the period (T) at which preventive maintenance actions have to be performed; and the sequence of jobs (S). These values minimize the maintenance costs (MC) and the expected total earliness and tardiness costs (ETC) away from a common due‐date D.
Practical implications
The paper attempts to integrate in a single model the two main aspects of any manufacturing and production systems: production and maintenance. It focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance. The effect of the period (T) and the sequence of job (S) on the expected total cost are shown through a numerical example.
Originality/value
The paper proposes an integrated model that links production, preventive maintenance and corrective maintenance. It is simultaneously focusing on the period (T) at which preventive maintenance actions have to be performed and the sequence of jobs (S) to reduce production and maintenance‐related costs.