Search results

1 – 1 of 1
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 16 August 2011

Rachid Benmansour, Hamid Allaoui, Abdelhakim Artiba, Serguei Iassinovski and Robert Pellerin

The purpose of this study is to propose and model an integrated production‐maintenance strategy for a failure‐prone machine in a just‐in‐time context.

754

Abstract

Purpose

The purpose of this study is to propose and model an integrated production‐maintenance strategy for a failure‐prone machine in a just‐in‐time context.

Design/methodology/approach

The proposed integrated policy is defined and a simulation model is developed to investigate it.

Findings

The paper focuses on finding simultaneously two decision variables: the period (T) at which preventive maintenance actions have to be performed; and the sequence of jobs (S). These values minimize the maintenance costs (MC) and the expected total earliness and tardiness costs (ETC) away from a common due‐date D.

Practical implications

The paper attempts to integrate in a single model the two main aspects of any manufacturing and production systems: production and maintenance. It focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance. The effect of the period (T) and the sequence of job (S) on the expected total cost are shown through a numerical example.

Originality/value

The paper proposes an integrated model that links production, preventive maintenance and corrective maintenance. It is simultaneously focusing on the period (T) at which preventive maintenance actions have to be performed and the sequence of jobs (S) to reduce production and maintenance‐related costs.

Details

Journal of Quality in Maintenance Engineering, vol. 17 no. 3
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 1 of 1
Per page
102050