1 – 4 of 4Kofi Agyekum, Frank Ato Ghansah, Portia Atswei Tetteh and Judith Amudjie
This study aims to examine the role of project managers (PMs) in construction health and safety in Ghana.
Abstract
Purpose
This study aims to examine the role of project managers (PMs) in construction health and safety in Ghana.
Design/methodology/approach
Purposive sampling technique was used to select licenced PMs in Ghana where data was collected with the use of structured questionnaires. Mean score analysis, Kendall’s Coefficient of Concordance, Relative Importance Index and Cronbach’s alpha were used to analyze the data.
Findings
The study discovered that most PMs on construction firms in Ghana allocate between 1% and 5% of the total project cost to health and safety. According to the study, client satisfaction is the most important parameter to consider in construction project management. Structural frame, method of fixing and edge of materials were the key design activities that caused PMs to make frequent reference to health and safety. It was revealed that PMs refer to health and safety when confronted by all the procurement-related situations.
Research limitations/implications
The research is limited to the built environment professionals in Ghana. The findings cannot be generalized and extended to other developing countries; however, it could serve as a lesson to them.
Practical implications
The findings of the study are anticipated to provide information about the critical role of PMs in promoting health and safety throughout the project life cycle.
Originality/value
The novelty of the study sought to delve into the complex nature of construction to identify the role of PMs in relation to the health and safety practices in the construction industry.
Details
Keywords
Portia Atswei Tetteh, Michael Nii Addy, Alex Acheampong, Isaac Akomea-Frimpong, Ebenezer Ayidana and Frank Ato Ghansah
The construction industry is one of the most hazardous working environments globally. Studies reveal that wearable sensing technologies (WSTs) have practical applications in…
Abstract
Purpose
The construction industry is one of the most hazardous working environments globally. Studies reveal that wearable sensing technologies (WSTs) have practical applications in construction occupational health and safety management. In the global south, the adoption of WSTs in construction has been slow with few studies investigating the critical drivers for its adoption. The purpose of this study is to investigate the factors driving WSTs adoption in Ghana where investment in such technologies can massively enhance health and safety through effective safety monitoring.
Design/methodology/approach
To meet the objectives of this study, research data was drawn from 210 construction professionals. Purposive sampling technique was used to select construction professionals in Ghana and data was collected with the use of well-structured questionnaires. The study adopted the fuzzy synthetic evaluation model (FSEM) to determine the significance of the critical drivers for the adoption of WSTs.
Findings
According to the findings, perceived value, technical know-how, security, top management support, competitive pressure and trading partner readiness obtained a high model index of 4.154, 4.079, 3.895, 3.953, 3.971 and 3.969, respectively, as critical drivers for WSTs adoption in Ghana. Among the three broad factors, technological factors recorded the highest index of 3.971, followed by environmental factors and organizational factors with a model index of 3.938 and 3.916, respectively.
Practical implications
Theoretically, findings are consistent with studies conducted in developed countries, particularly with regard to the perceived value of WSTs as a key driver in its adoption in the construction industry. This study also contributes to the subject of WSTs adoption and, in the case of emerging countries. Practically, findings from the study can be useful to technology developers in planning strategies to promote WSTs in the global south. To enhance construction health and safety in Ghana, policymakers can draw from the findings to create conducive conditions for worker acceptance of WSTs.
Originality/value
Studies investigating the driving factors for WSTs adoption have mainly centered on developed countries. This study addresses this subject in Ghana where studies on WSTs application in the construction process are uncommon. It also uniquely explores the critical drivers for WSTs adoption using the FSEM.
Details
Keywords
Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei Kyei, Portia Atswei Tetteh, Roksana Jahan Tumpa, Joshua Nsiah Addo Ofori and Fatemeh Pariafsai
The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times…
Abstract
Purpose
The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times. However, current studies and practical implementation of CE are largely associated with construction demolition, waste and recycling management. Few studies exist on circular models and success factors of public infrastructures developed within the PPP contracts. Thus, the main objective of this article is to identify the models and key success factors associated with CE implementation in PPP infrastructure projects.
Design/methodology/approach
A systematic review of the literature was undertaken in this study using forty-two (42) peer-reviewed journal articles from Scopus, Web of Science, Google Scholar and PubMed.
Findings
The results show that environmental factors, sustainable economic growth, effective stakeholder management, sufficient funding, utilization of low-carbon materials, effective supply chain and procurement strategies facilitate the implementation of CE in PPP infrastructure projects. Key CE business models are centered around the extension of project life cycle value, circular inputs and recycling and reuse of projects.
Research limitations/implications
Although the study presents relevant findings and gaps for further investigations, it has a limited sample size of 42 papers, which is expected to increase as CE gain more prominence in PPP infrastructure management in future.
Practical implications
The findings are relevant for decision-making by PPP practitioners to attain the social, economic and environmental benefits of transitioning to circular infrastructure management.
Originality/value
This study contributes to articulating the key models and measures toward sustainable CE in public infrastructure development.
Details
Keywords
Boeing Laishram, Ganesh Devkar, Yongjian Ke and Ahmed Abdel Aziz