Article
Publication date: 30 April 2021

Alexis Barrientos-Orellana, Pablo Ballesteros-Pérez, Daniel Mora-Melia, Maria Carmen González-Cruz and Mario Vanhoucke

Earned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration forecasting…

844

Abstract

Purpose

Earned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration forecasting methods have been proposed. However, very few studies have compared their accuracy and stability.

Design/methodology/approach

This paper presents an exhaustive stability and accuracy analysis of 27 deterministic EVM project duration forecasting methods. Stability is measured via Pearson's, Spearman's and Kendall's correlation coefficients while accuracy is measured by Mean Squared and Mean Absolute Percentage Errors. These parameters are determined at ten percentile intervals to track a given project's progress across 4,100 artificial project networks with varied topologies.

Findings

Findings support that stability and accuracy are inversely correlated for most forecasting methods, and also suggest that both significantly worsen as project networks become increasingly parallel. However, the AT + PD-ESmin forecasting method stands out as being the most accurate and reliable.

Practical implications

Implications of this study will allow construction project managers to resort to the simplest, most accurate and most stable EVM metrics when forecasting project duration. They will also be able to anticipate how the project topology (i.e., the network of activity predecessors) and the stage of project progress can condition their accuracy and stability.

Originality/value

Unlike previous research comparing EVM forecasting methods, this one includes all deterministic methods (classical and recent alike) and measures their performance in accordance with several parameters. Activity durations and costs are also modelled akin to those of construction projects.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 5 September 2024

Caroline Olufunke Esangbedo, Jingxiao Zhang, Pablo Ballesteros-Pérez and Martin Skitmore

This study aims to investigate the relationship between supply chain leadership, digital supply chain practices and corporate sustainability strategies on the sustainability…

366

Abstract

Purpose

This study aims to investigate the relationship between supply chain leadership, digital supply chain practices and corporate sustainability strategies on the sustainability performance of logistics firms in Nigeria, one of Africa’s largest economies. It indicates that collaborative efforts within the supply chain context can improve sustainability performance.

Design/methodology/approach

Data from 468 firms in a major sub-Saharan African market were collected through a structured questionnaire. The analysis used descriptive statistics, principal component analysis and hierarchical regression analysis. Factor analysis and Cronbach’s alpha analysis were used to assess the validity and reliability of the instrument.

Findings

The results of this study reveal significant findings: proactive sustainability strategies exert a substantial positive effect on sustainability performance (β = 0.694, SE = 0.025, p < 0.01). Even when proactive sustainability strategies are included in the model, the positive impact of reactive sustainability strategies remains significant (β = 0.694, SE = 0.025, p < 0.01: Model 5). Regarding the moderating role of proactive and reactive corporate sustainability strategies, there is a notable interaction effect between supply chain leadership and proactive sustainability strategies concerning sustainability performance (p < 0.05). This confirms the positive relationship between supply chain leadership and sustainability performance when proactive sustainability strategies are at a high level (β = 0.844, SE = 0.0010, p < 0.01), supporting H4 that this relationship strengthens with higher levels of proactive sustainability strategies. Conversely, for Hypothesis H5, the interaction effect of reactive sustainability strategies with supply chain leadership changes the relationship from significantly positive to significantly negative (β = −0.068, SE = 0.0009, p < 0.01). Using the Baron and Kenny approach to test mediation, the mediating effect of digital supply on digital leadership is significant (β = 0.345, p = 0.000, p < 0.01). Furthermore, the effect of digital supply on sustainability performance is statistically significant (β = 0.081, p = 0.006, p < 0.01), as is the effect of digital leadership on sustainability performance (β = 0.181, p = 0.000, p < 0.01). These results indicate a mediation effect of digital supply.

Research limitations/implications

This study of logistic management has limitations, including its cross-sectional nature, which precludes the establishment of causality, thus necessitating longitudinal research to determine causal relationships. In addition, the focus on Nigerian firms, which vary significantly in their stages of learning and institutional development, emphasizes the need for further research in diverse contexts. Future studies should examine alternative institutional environments or developed economies to validate these assumptions. Another limitation is the potential for bias due to six employees rating their firms on each variable; therefore, using multiple data sources is recommended to objectively evaluate the validity of the self-reported questionnaire.

Practical implications

This study advises managers to exercise caution when selecting between proactive and reactive sustainability strategies to enhance sustainability performance. Proactive strategies reinforce the relationship between supply chain leadership and sustainability performance, while reactive strategies diminish it. Therefore, managers are encouraged to adopt more proactive strategies. This paper suggests that managers in emerging economies should recognize the distinct impacts of proactive sustainability strategies and allocate more resources toward them to improve sustainability performance, even in competitive markets. In addition, it highlights the importance of digital supply in fostering sustainability performance.

Originality/value

This study presents a novel perspective on the moderating role of corporate sustainability strategies in the relationship between supply chain leadership and the sustainability performance of logistics firms. It provides empirical evidence and fresh insights on proactive and reactive sustainability strategies for logistics firms in Nigeria. The findings highlight that proactive sustainability strategies enhance the connection between supply chain leadership and sustainability performance, whereas reactive strategies do not.

Details

Supply Chain Management: An International Journal, vol. 29 no. 6
Type: Research Article
ISSN: 1359-8546

Keywords

Access Restricted. View access options
Article
Publication date: 9 May 2020

Jingxiao Zhang, You Ouyang, Hui Li, Pablo Ballesteros-Pérez and Martin Skitmore

Cultural differences between employees of different nationalities are hindering the development of some transnational joint ventures. Describing and modelling the positive (or…

648

Abstract

Purpose

Cultural differences between employees of different nationalities are hindering the development of some transnational joint ventures. Describing and modelling the positive (or negative) factors that cause joint venture employees to accept (or reject) joint management business practices is of great value to all corporations operating abroad with locally sourced employees.

Design/methodology/approach

This study uses a Sino-Japan construction joint venture project as a representative case study. First, structural equation modelling is used to identify the factors influencing Chinese employees' acceptance of joint venture management practices. Then, a system dynamics model is adopted to simulate the time-dependent effects of the incentives.

Findings

The study results (1) indicate which incentives strongly affect employee acceptance of joint venture management practices; (2) identify inefficient management practices in cross-cultural joint ventures; and (3) provide evidence that the employees' perceptions of clear purpose, good working relationships and helpful mechanisms positively and directly also support their acceptance of joint management practices.

Originality/value

–A dynamic simulation method is used to analyse the influence of various incentive factors on employee acceptance of joint management. This provides unprecedented information regarding how these factors interact with each other, hence how their effectiveness varies (both positively and negatively) over time. Further findings also provide new ideas for joint venture managers to adopt more effective management methods.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Available. Open Access. Open Access
Article
Publication date: 16 November 2015

Pablo Ballesteros-Pérez, Maria Luisa del Campo-Hitschfeld, Manuel Alejandro González-Naranjo and Mari Carmen González-Cruz

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The…

10585

Abstract

Purpose

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study.

Design/methodology/approach

By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed.

Findings

Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate.

Research limitations/implications

Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries.

Practical implications

The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays.

Originality/value

Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.