Article
Publication date: 1 March 2000

PERTH LAHDENPERÄ and VELIPEKKA TANHUANPÄÄ

There are numerous designers involved in building design, and the various parties need information from each other as a basis for their design decisions. The design co‐ordinator…

352

Abstract

There are numerous designers involved in building design, and the various parties need information from each other as a basis for their design decisions. The design co‐ordinator cannot be an expert on all information needs of every design discipline. The various designers, again, focus on their current work only, and neglect the planning of forthcoming design activities. This results in a lack of information, guess‐work, idling and delays in the self‐steering process. The end result is extensive redesign and problems in the construction stage. This article describes a design management system developed to minimize these problems. The system includes operational systematics to be followed by all the actors involved in the design process. Another part of the solution is a reference model on typical information needs by different designers in various stages and tasks of the design process. The system was developed as part of two actual building design processes.

Details

Engineering, Construction and Architectural Management, vol. 7 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 6 June 2022

Derek H.T. Walker, Paulo Vaz Serra and Peter E.D. Love

Price reliability for complex and highly complicated infrastructure projects is problematic. Traditional project delivery approaches generally fail in achieving targeted end cost…

829

Abstract

Purpose

Price reliability for complex and highly complicated infrastructure projects is problematic. Traditional project delivery approaches generally fail in achieving targeted end cost reliability. However, integrated project delivery (and particularly Alliancing), develop a far more reliable and robust project delivery plan and outturn time-cost targets. This paper aims to explore why this may be the case.

Design/methodology/approach

This case study investigated the project design, planning, cost/time estimation approach and how risk/uncertainty was dealt with. Five senior project delivery experts from an organisation that delivers multi-billion-dollar infrastructure projects in Australia were interviewed. These five experts collectively had 100+ cross-disciplinary experience years delivering complex infrastructure projects.

Findings

Alliancing adopts a radically different approach to project design, time/cost planning and risk assessment and management to traditional project delivery approaches. Key findings explain how the project alliance agreement designs-in processes that maximises team integration and collaboration. Analysis concludes that design thinking is used to craft and shape collaborative behaviours and project governance. Additionally, including project owner and facilities operator representatives in the project team adds valuable insights, expertise and knowledge contributing to planning reliability.

Research limitations/implications

This study is exploratory and focussed on complex infrastructure projects so findings cannot be generalised.

Practical implications

We unpack Alliancing processes that develop the target outturn cost plan, comprising a holistic and realistic plan to design a project to meet expected project outcomes. This case study may serve as an exemplar for complex project delivery.

Social implications

This paper illustrates how Alliancing more effectively delivers best value than traditional procurement approaches through its TOC-TAE processes.

Originality/value

The paper contributes to the scant existing academic literature analysing these processes. Its novel contribution is explaining how Alliancing treats unexpected events that in traditional delivery forms trigger expensive and time-energy-wasting disputation. This case study may serve as an exemplar for complex project delivery.

Details

International Journal of Managing Projects in Business, vol. 15 no. 5
Type: Research Article
ISSN: 1753-8378

Keywords

Access Restricted. View access options
Article
Publication date: 5 November 2018

Paulos Abebe Wondimu, Ali Hosseini, Jadar Lohne and Ola Laedre

Early contractor involvement (ECI) faces many barriers when it is implemented in public procurement, given that it is different from traditional business practices. Primarily…

1486

Abstract

Purpose

Early contractor involvement (ECI) faces many barriers when it is implemented in public procurement, given that it is different from traditional business practices. Primarily, public owners face a major challenge, as they should treat all bidders equally. The purpose of this paper is to explore suitable ECI approaches that public owners could use.

Design/methodology/approach

In addition to a literature and document study, 14 semi-structured in-depth interviews with key personnel from 11 cases selected from Norwegian public bridge projects were carried out.

Findings

In all, 23 unique approaches of ECI were identified during this research (16 from literature and 7 new from case projects). The findings provide a new direction to ECI through introducing new approaches of ECI from the case projects.

Originality/value

This paper for the first time presents several alternatives of ECI approaches for public owners with the intention of illustrating ECI is actually possible in the public project procurement. Furthermore, it presents for the first time success factors of ECI with the intention of increasing the understanding of ECI concept from a public procurement perspective.

Details

Journal of Public Procurement, vol. 18 no. 4
Type: Research Article
ISSN: 1535-0118

Keywords

Access Restricted. View access options
Article
Publication date: 18 July 2016

Karen Manley and Le Chen

Collaboration is thought to offer significant benefits over traditional contracts, however there is little existing research concerning how these benefits can be optimized. To…

1189

Abstract

Purpose

Collaboration is thought to offer significant benefits over traditional contracts, however there is little existing research concerning how these benefits can be optimized. To address this gap, a survey investigated the impact of client characteristics on the time and cost efficiency of collaborative infrastructure projects. The paper aims to discuss these issues.

Design/methodology/approach

The survey of experienced senior practitioners of Australian collaborative infrastructure projects yielded 320 valid responses. Cluster analysis, one-way between group ANOVA tests and independent sample t-tests were used to confirm that three client characteristics are critical to time and cost performance: client sector (public/private); client experience with asset procurement; and client approach to price competition.

Findings

Projects procured by experienced private sector clients were found to meet targeted levels of performance, regardless of their approach to team selection. Among projects procured by experienced public sector clients, groups of relatively low and high performing projects could be distinguished, regardless of their approach to team selection. Projects run by teams selected competitively on non-price criteria prior to the pricing stage exhibited significantly better performance than those run by teams that competed on the price of the project to win the work.

Research limitations/implications

This study focussed only on analysis of three client characteristics. Future research may consider a broader range of contextual variables. Results are based on perceptual data rather than objective data.

Practical implications

The findings show collaborative infrastructure clients in the construction sector should be less concerned about inexperience than they might have been, and more interested in single-team selection approaches than they might have been.

Originality/value

The results indicate significant performance differences between client types. In particular, experienced public sector clients had more polarized performance outcomes, compared to the private sector.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Available. Content available
Article
Publication date: 2 May 2018

Derek Walker

1004

Abstract

Details

International Journal of Managing Projects in Business, vol. 11 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Access Restricted. View access options
Article
Publication date: 5 September 2017

Che Khairil Izam Che Ibrahim, Seosamh B. Costello, Suzanne Wilkinson and Derek Walker

The purpose of this paper is to explore innovation in alliance contracting in the New Zealand construction industry in terms of features (i.e. development process, risk/reward…

1423

Abstract

Purpose

The purpose of this paper is to explore innovation in alliance contracting in the New Zealand construction industry in terms of features (i.e. development process, risk/reward framework and leadership structure) that could influence successful project outcomes.

Design/methodology/approach

This study employed a qualitative research methodology. Three alliancing projects have been identified as the cases. By using interviews with the project’s owner and non-owner participants and related project documentation, the relevant features in the three examined cases were identified and compared.

Findings

The findings revealed differences in the reasoning why a particular alliance approach was implemented, how the alliance selection process was conducted and what kind of leadership structure was adopted. Interestingly, a number of unique and innovative practices to alliancing were also highlighted, notably the innovative agreements, innovative governance structure and innovative functional teams that influence the synergistically creative solutions to suit the clients’ needs.

Practical implications

The innovative practices identified in this study have brought the alliancing concept to a new level of practice in the industry. The findings provide a basis and a platform for discussion, both nationally and internationally, to gain greater understanding in managing different alliance contracting towards breakthrough outcomes.

Originality/value

This study extends the alliancing procurement literature, in particular, but also provides significant insights into innovative advancements to the collaborative procurement approaches.

Details

International Journal of Managing Projects in Business, vol. 10 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Available. Open Access. Open Access
Article
Publication date: 17 May 2024

Sina Moradi, Janne Hirvonen and Piia Sormunen

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built…

683

Abstract

Purpose

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built environment. Although there have been a few studies addressing this issue, studying this topic with a special focus on the project delivery process has been almost overlooked. Hence, this study aims to address the EPG in building construction through the lens of collaborative and life cycle-based project delivery.

Design/methodology/approach

In order to realize the objective of this study, the development of a theoretical framework based on the literature review was followed by a qualitative study in which 21 semi-structured interviews were conducted with Finnish project professionals representing clients, design/planning experts, constructors and building operation/maintenance experts to explore their views on the topic under study.

Findings

The findings reveal the project delivery-related causes of EPG in building construction. Moreover, the obtained results present a collaborative and life cycle-based delivery model that integrates project and product (i.e. building) life cycles, and it is compatible with all types of contractual frameworks in building construction projects.

Research limitations/implications

Although the findings of this study significantly contribute to theory and practice in the field of collaborative and sustainable construction project delivery, it is acknowledged that these findings are based on Finnish professionals’ input, and expanding this research to other regions is a potential area for further studies. Moreover, the developed model, although validated in Finland, needs to be tested in a broader context as well to gain wider generalizability.

Originality/value

The obtained results reveal the significance and impact of collaborative and life cycle-based project development and delivery on the realization of environmentally sustainable building construction.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Access Restricted. View access options
Article
Publication date: 17 November 2014

Derek Walker and Mattias Jacobsson

This case study was chosen for its rare, if not unique, project procurement strategy. It is, to the authors’ knowledge, the only example of a project alliance (PA) being…

1561

Abstract

Purpose

This case study was chosen for its rare, if not unique, project procurement strategy. It is, to the authors’ knowledge, the only example of a project alliance (PA) being undertaken within a public-private partnership (PPP) project delivery approach. The purpose of this paper is to explore the case study from a strategic perspective to better understand if it is possible to combine a PA within a less collaborative procurement form, such as PPP or design and construct (D&C), and to determine if there were any specific prerequisite conditions needed for such an arrangement to be successfully adopted.

Design/methodology/approach

A single exploratory case study was undertaken through interviewing seven of the most senior project participant executives for approximately an hour that each had a separate and unique perspective to offer relating to the organisational role they represented in the PA. These interviewees were identified as the most knowledgeable key executives participating in the PA from whom both strategic and operational insights could be gained.

Findings

It is possible to design a PA approach within a PPP for large and complex infrastructure projects and this can provide a competitive advantage to do so, however, the reasons for doing so should be clear and compelling. Parties to such an arrangement should be prepared to fully engage through adopting full PA principles. In such a case as this, the PPP special purpose vehicle takes on the role of “project owner” that normally the public body part of the PPP would normally adopt.

Research limitations/implications

This research reports upon a single case study within a specific project delivery culture that has extensive experience of PAs. Demonstrated positive project outcomes would not be likely to be more generally repeatable across the engineering infrastructure sector unless parties engaged within such a PA had not already experienced and understood outcomes resulting from such a close collaboration.

Practical implications

This research has implications for project participants bidding for PPP projects as well as others using a D&C tending approach. It offers a potential competitive advantage because it demonstrates and explains how choices may be expanded beyond a simple single project procurement strategy approach.

Social implications

Many PPP and PA infrastructure projects are delivered to provide community benefit. This paper provides a way to improve the project delivery process and thus improving value to the community.

Originality/value

The paper makes three contributions. Primarily, it pioneers analysis of a PA within a PPP. Second, it provides important insights into the reasons and emergence of this phenomenon. Finally, it provides an understanding of this how this novel form of early contractor involvement with a PPP special purpose ownership vehicle that combines competition and collaboration may function operationally.

Details

Engineering, Construction and Architectural Management, vol. 21 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 2 August 2019

Petteri Uusitalo, Olli Seppänen, Antti Peltokorpi and Hylton Olivieri

Although prior studies have noted the importance of trust for project performance, research remains scant on describing the role of trust when using lean design management (LDM…

1351

Abstract

Purpose

Although prior studies have noted the importance of trust for project performance, research remains scant on describing the role of trust when using lean design management (LDM) in projects. The purpose of this paper is to explore the connection between LDM and interpersonal trust in solving construction projects’ design management problems.

Design/methodology/approach

A qualitative study was conducted that included 29 trust- and LDM-themed semi-structured interviews in the USA (California), Brazil and Finland; 11 focus group discussions were also organized to validate the interview findings.

Findings

The study reveals how LDM contributes to solving design management problems through two distinct but interconnected mechanisms: improved information flow; and improved trust among project team members. A conceptual framework was crafted to illustrate the mechanisms in building trust by means of the social domain of LDM concepts.

Research limitations/implications

The conceptual framework requires testing through an international survey or through multiple case studies.

Practical implications

The results indicate that design management would benefit from trustful environments and that trust may be the catalyst for actors’ engagement with LDM. Managers in charge of design within projects can use the conceptual framework when selecting the appropriate LDM tools, which should include both the social and technical domains.

Originality/value

The study emphasizes the importance of the social domain of LDM concepts. Previous studies have focussed on information flow aspects of LDM but have overlooked the value of interpersonal trust in solving design management problems.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 4 January 2017

Sjur Børve, Tuomas Ahola, Bjorn Andersen and Wenche Aarseth

The purpose of this paper is to evaluate to which extent partnering practices observed in earlier research focussing on the construction industry are applied in offshore…

639

Abstract

Purpose

The purpose of this paper is to evaluate to which extent partnering practices observed in earlier research focussing on the construction industry are applied in offshore development drilling projects.

Design/methodology/approach

The paper reviews earlier research on project partnering and the relationship-based procurement (RBP) taxonomy. The taxonomy is then empirically applied to describe partnering practices in an incentive-based drilling project in Norway.

Findings

Many elements of project partnering observed earlier in construction projects were found to characterize offshore development drilling projects. However, as assessed using the RBP framework, the authors found that partnering elements in observed context rated consistently lower than elements previously reported in the construction industry, indicating a lower maturity of partnering practices in the studied context.

Practical implications

The present study provides a multi-dimensional and systematic description of partnering practices in offshore drilling projects. Project owners can utilize this information to identify partnering elements requiring particular emphasis when initiating and managing drilling projects. Based on the findings, such elements include transparency and open-book auditing, integrated risk mitigation and insurance practices and establishment of authentic leadership. The findings further imply that partnering models cannot be directly applied across industry boundaries but must be tailored to fit the salient characteristics of each context.

Originality/value

The paper systematically describes to which extent specific partnering elements of the RBP taxonomy are applied in offshore drilling projects.

Details

International Journal of Managing Projects in Business, vol. 10 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

1 – 10 of 11