1 – 10 of 17Deraniyagalage Chanaka Karunarathna, H.A.H.P. Perera, B.A.K.S. Perera and P.A.P.V.D.S. Disaratna
Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with…
Abstract
Purpose
Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.
Design/methodology/approach
The study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.
Findings
The findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.
Originality/value
This study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.
Details
Keywords
W.A. Rasanjali, A.P.K.D. Mendis, B.A.K.S. Perera and Vijitha Disaratna
In a conventional sense, information technology has frequently been considered a source of Lean waste management. However, as the corporate world evolves, new models that provide a…
Abstract
Purpose
In a conventional sense, information technology has frequently been considered a source of Lean waste management. However, as the corporate world evolves, new models that provide a competitive edge by merging technical breakthroughs with the Lean paradigm must be developed. Enterprise resource planning (ERP), which is such technological advancement, is found to be highly influential for Lean implementation. However, there is a dearth of literature on the adaptability of ERP to minimise Lean waste in the construction industry. This paper, therefore, aims to investigate the possibility of applying ERP to minimise Lean waste in the construction industry.
Design/methodology/approach
The study used a qualitative approach, consisting of fifteen (15) expert interviews and code-based content analysis was used to analyse the empirical data.
Findings
The findings revealed the challenges faced when applying ERP with the Lean concept and the strategies that would help overcome the challenges. Most of the challenges could be overcome through training and awareness programmes and proper team management. The study also found that ERP could be applied with Lean to eliminate waste generation in the construction industry.
Originality/value
This paper contributes to the theory by providing an evaluation of the possibility of adopting ERP to eliminate Lean waste in the construction industry. The study will contribute to new knowledge related to strategies for proper use of ERP for Lean waste minimisation, which will be useful for future researchers in the area.
Details
Keywords
G.K.T. Weerasekara, Archchana Shandraseharan, B.A.K.S. Perera and Vijitha Disaratna
The morphology of a building describes its outline and influences its architectural aesthetics and the cost directly. However, the literature on the impact of morphology on the…
Abstract
Purpose
The morphology of a building describes its outline and influences its architectural aesthetics and the cost directly. However, the literature on the impact of morphology on the aesthetics and cost of urban detached residential buildings is scarce. Thus, this study is significant because its aim was to identify the critical building morphology factors and the relationship that each of them maintains with the cost and aesthetics of urban detached residential buildings.
Design/methodology/approach
The multi-method qualitative approach was used to collect the required empirical data through interviews and case studies and to identify the effect of the morphology factors on the aesthetics and construction cost of urban residences in Sri Lanka, respectively. The collected data were analyzed using manual content analysis and descriptive statistics.
Findings
The study findings revealed that the morphology factors such as the roof and circulation spaces, open spaces and voids have a high impact on both the building cost and aesthetics. These findings will assist building designers in making effective design decisions on building costs and aesthetics so that a successful design outcome satisfying both the clients and design team could be obtained.
Originality/value
Although morphology has an impact on the cost and aesthetic of buildings, literature on the subject is scarce. Thus, this study is significant in that it aimed at identifying the significant building morphology factors in urban detached residential buildings and identifying their relationship with the cost and aesthetic of those buildings.
Details
Keywords
Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…
Abstract
Purpose
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.
Design/methodology/approach
The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.
Findings
The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.
Practical implications
The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.
Originality/value
This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.
Details
Keywords
B.H.V.H. Jayamaha, B.A.K.S. Perera, K.D.M. Gimhani and M.N.N. Rodrigo
Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the…
Abstract
Purpose
Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the world through enhancing the efficiency of the functions related to cost management. Thus, the purpose of this study was to investigate the applicability of ERP systems for cost management of building construction projects in Sri Lanka.
Design/methodology/approach
A qualitative technique was used in this study, which comprised two-round Delphi-based semistructured interviews. Purposive sampling was used to determine the interviewees. Content analysis was used to evaluate the collected data.
Findings
The findings of this study identified the ERP system as a strategic tool for gaining a competitive advantage for an organization while confirming 14 uses of ERP systems and 16 stages of the cost management process. Eighteen issues were finalized at the end of the interview rounds while categorizing the suitable ERP applications at each stage of the cost management process.
Originality/value
Even though there are numerous distinct studies conducted on cost management and ERP systems, there has been a lack of studies conducted on the synergy between these two areas that can be adapted for the building projects in the Sri Lankan context. Therefore, the findings of this study can bring a new paradigm to the Sri Lankan construction sector by influencing the adaption of correct ERP systems at numerous project stages by providing a competitive edge.
Details
Keywords
Nuwantha Lasitha Sampath Uduwage Don, Kriengsak Panuwatwanich and K.G.A.S. Waidyasekara
Awarding contracts based solely on the lowest price is unsuitable for every project. Consequently, most procurement systems in developed countries have progressed to the…
Abstract
Purpose
Awarding contracts based solely on the lowest price is unsuitable for every project. Consequently, most procurement systems in developed countries have progressed to the multicriteria selection practices (MSPs) for tender evaluation. MSPs consider a range of quality measures, such as completion time, life cycle cost, functional characteristics, environmental impact and innovation, alongside bid price. This study examines the prevailing MSPs in Sri Lankan public tender evaluations to enhance the effectiveness of the local tender evaluation process.
Design/methodology/approach
A desk study approach was employed to collect bidding documents, resulting in the identification of 66 documents. A systematic screening process was then applied to identify those bidding documents that incorporated MSPs. Subsequently, content analysis was conducted to determine the common features of the functions used in MSPs.
Findings
The study identified six primary functions related to MSPs incorporated in the bidding documents to procure building and substation projects. Three functions follow the price-to-quality method, while the remaining three follow the quality-to-price method. Among these identified functions, four functions employ objective evaluation criteria, such as thickness, capacity and operational loss. The other two functions utilize subjective evaluation criteria, such as the project’s design and technical specifications. Contract awarding will be based on either the highest score or the lowest bid, depending on the function type.
Originality/value
This study’s originality lies in exploring MSPs in the Sri Lankan public tender evaluation process and in disclosing their characteristics to promote the MSPs in Sri Lanka and developing countries.
Details
Keywords
Mohamed Ahmed Abobakr, Magdy Abdel-Kader and Ahmed Fouad F. Elbayoumi
This paper aims to investigate the influence of sustainable enterprise resource planning (S-ERPs) systems implementation on sustainability performance.
Abstract
Purpose
This paper aims to investigate the influence of sustainable enterprise resource planning (S-ERPs) systems implementation on sustainability performance.
Design/methodology/approach
A 1 × 2 experiment was conducted, involving a sample of 72 professional accountants enrolled in MPA, MBA and DBA programs at two prominent Egyptian universities. Simple linear regression was used to analyze the data.
Findings
The results reveal positive relationships between the implementation of S-ERPs and economic, environmental and social sustainability performance.
Research limitations/implications
Considering the research methodology used, which relies on a laboratory experiment design; nevertheless, empirical data derived from a quasi-experiment conducted in a real-world context would offer valuable insights into the existing literature.
Practical implications
For manufacturing sector managers, the results offer value as organizations can benefit from S-ERP adoption in the internal and external integration of sustainability functions. The findings also provide decision-makers in the manufacturing context, particularly in emerging countries, with tangible reasons to consider S-ERP adoption for holistic sustainability benefits including waste management, resource consumption reduction and management of sustainable supply chain complexities. Further, the findings provide valuable insights for ERP vendors on how they can develop their ERP packages to align with software sustainability criteria.
Originality/value
This study is among the few that experimentally investigates the influence of S-ERPs implementation on sustainability performance within the manufacturing sector, especially in an emerging context such as Egypt. This unique contribution provides valuable insights into the complex connection between technology adoption and sustainability outcomes.
Details
Keywords
Hasith Chathuranga Victar and K.G.A.S. Waidyasekara
The concept of Circular Economy (CE) has gained significant traction in addressing the issue of Construction and Demolition (C&D) waste, which is generated because of global…
Abstract
Purpose
The concept of Circular Economy (CE) has gained significant traction in addressing the issue of Construction and Demolition (C&D) waste, which is generated because of global urbanisation and urban renewal. Therefore, this research aims to explore the applicability of CE strategies to minimise the C&D Waste Management (WM) issues in Sri Lanka considering the preconstruction stage of the building project.
Design/methodology/approach
The research adopted a qualitative approach, using three expert interview rounds with the Delphi technique. In each round, 17, 15 and 12 experts were involved. A manual content analysis method was used to analyse the collected data.
Findings
Findings uncovered effective strategies in CE to address the 14 issues within C&D WM and its effects on the project management iron triangle in Sri Lanka. Integrating CE strategies within the construction sector to tackle C&D WM issues can significantly contribute to establishing a more sustainable, robust and resource-conscious built environment. By adopting CE strategies such as design for adaptability of existing buildings and design for disassembly, construction projects can optimise the project's timeline, cost and quality factors.
Originality/value
This will help to minimise the demand for virgin materials and reduce the volume of waste generated. Using recycled materials also helps close the loop of the materials cycle, thereby contributing to the CE. Also, this research contributes uniquely by offering practical, context-driven solutions that align with Sri Lanka’s construction sector.
Details
Keywords
Mahesh Babu Purushothaman, Leo Neil Resurreccion San Pedro and Ali GhaffarianHoseini
This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through…
Abstract
Purpose
This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through early anticipation.
Design/methodology/approach
Forty-seven global literature were examined in detail to identify CODS and its interactions using the systematic literature review (SLR) method that utilised the PRISMA guidelines to ensure the studies reviewed were adequate to safeguard the robustness and comprehensiveness. Three-way analysis, such as Pareto, degree of centrality and loops, was undertaken to identify the critical Level 1,2 and 3 CODS that affect the Construction projects.
Findings
The research findings demonstrate that 65 CODs in eight categories affect construction projects. The CODs act in coherence rather than silos; the CLD displays complex interconnections of 44 factors obtained through the pairwise comparison of the 47 identified literature of the SLR. Through its systematic analysis of interaction loops, this research identified Ten level 1 critical CODs, two second-level critical CODs and 4 Third-level critical CODs. “Contractors' excessive workload/beyond potential/inadequate experience” emerged as the top COD that affects scheduling and project delay.
Research limitations/implications
The study limitations include using only English articles and a restricted number of databases. However, the chosen databases were reputable and underwent thorough peer review processes. This study may have limitations due to the SLR, which means that factors affecting COD and interactions may vary by country, and future research is suggested for validation.
Practical implications
This study identified interactions of construction delays that potentially support scheduling risk management during the early stage of the project and reduce waste to improve sustainability. The theoretical implications of SLR-based research include helping develop a framework that would potentially have all COD in the current scenario and aid future academic and industrial research factor-wise and country-wise in aiding sustainability. This will support and provide construction professionals and academia with knowledge of the COD related to factors and their interactions to be considered in the early assessment and management of future projects and improve sustainability.
Originality/value
Most literature studies the factors or causes of construction delays that affect construction projects. The CODs primarily do not operate in silos but combine with other causes to enhance their influence on delays. Hence, it is of utmost importance to study the interactions of COD to enhance the knowledge in the construction field that would aid in schedule repair and, in turn, on-time project delivery. The study is the first related to COD and their interactions in construction projects in the digital era.
Details
Keywords
Nor Zaimah Che-Ghani, Nik Elyna Myeda and Azlan Shah Ali
To achieve efficient operation and maintenance (O&M) management, this study seeks to identify critical success factors (CSFs) affecting service delivery factors of O&M services at…
Abstract
Purpose
To achieve efficient operation and maintenance (O&M) management, this study seeks to identify critical success factors (CSFs) affecting service delivery factors of O&M services at stratified residential buildings. The purpose of this study is to yield measurable data for developing an effective O&M framework to enhancing its performance. In future research, this study will further investigate the relationship between the CSF and service performance factors.
Design/methodology/approach
This study adopts a combination of qualitative and quantitative techniques that yields conclusive study findings while improving the research’s validity and dependability. Two series of instruments were conducted in an effort to refine the efficient O&M framework variables. Instruments used in addressing the research gap were a questionnaire survey and focus group discussion (FGD). Analysis of data was completed via the Statistical Package for the Social Sciences (SPSS) programme for quantitative data and thematic analysis for qualitative data.
Findings
This study concludes that the CSFs directly affect the performance of O&M. Questionnaire survey and FGD findings have refined the CSF into three main categories, namely, building characteristics, O&M management and community participation. FGD experts further suggested that service performance factors can be measured against SERVQUAL service qualities such as reliability, tangible, responsiveness, assurance and empathy.
Research limitations/implications
Future research may consider the inclusion of financial elements in the O&M service delivery.
Originality/value
This study presents a fresh insight into the CSFs that construct an efficient O&M framework through rigorous steps of data collection and analysis. This study proposes impactful guidance for policymakers, practitioners and residents on the significance of all parties’ involvement to support the management of residential buildings, where the current practice of O&M constantly faces complex issues. This study derives novice strategies that should correspond to the growing issues and challenges in managing residential buildings. The deeper insight into the role of O&M represents a direction for the future development of facilities management progress and stratified residential building sectors.