Search results

1 – 5 of 5
Article
Publication date: 1 October 2018

Jeyadurga P., Usha Mahalingam and Saminathan Balamurali

The purpose of this paper is to design a modified chain sampling plan for assuring the product percentile life where the lifetime follows Weibull or generalized exponential…

Abstract

Purpose

The purpose of this paper is to design a modified chain sampling plan for assuring the product percentile life where the lifetime follows Weibull or generalized exponential distributions (GEDs). In order to reduce the cost of inspection when implementing the proposed modified chain sampling plan, it is also considered the economic aspect of designing of proposed plan in this paper.

Design/methodology/approach

The authors have designed the proposed plan on the basis of two points on the operating characteristic (OC) curve approach. The optimization problem is used to determine the plan parameters of the proposed plan so that the specified values of producer’s risk and consumer’s risk are satisfied simultaneously.

Findings

The results we have obtained, confirm that the proposed plan will be very effective in reducing the sample size rather than other existing sampling plans. The OC curves of proposed plan, chain sampling plan and zero acceptance number single sampling plan show that the performance of proposed plan in discriminating the good and poor quality lots is better than other two plans. In this paper, it is proved that the value of number of preceding lots required for current lot disposition plays an important role.

Originality/value

The proposed modified chain sampling plan for assuring the percentile lifetime of the products under Weibull or GEDs is not available in the literature. The proposed plan can be used in all the manufacturing industries to assure the product percentile lifetime with minimum sample size as well as minimum cost.

Details

International Journal of Quality & Reliability Management, vol. 35 no. 9
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 28 November 2023

M. Sankara Narayanan, P. Jeyadurga and S. Balamurali

The purpose of this paper is to design a modified version of the double sampling plan to handle the inspection processes requiring a minimum sample size to assure the median life…

Abstract

Purpose

The purpose of this paper is to design a modified version of the double sampling plan to handle the inspection processes requiring a minimum sample size to assure the median life for the products under the new Weibull–Pareto distribution. The economic design of the proposed plan is also considered to assure the product's lifetime with minimum cost.

Design/methodology/approach

The authors have developed an optimization model for obtaining the required plan parameters by solving simultaneously two non-linear inequalities and such inequalities have been formed based on the two points on the operating characteristic curve approach.

Findings

The results show that the average sample number, average total inspection and total inspection cost under the proposed plan are smaller than the same of a single sampling plan. This means that the proposed plan will be more efficient than a single sampling plan in reducing inspection effort and cost while providing the desired protection.

Originality/value

The proposed modified double sampling plan designed to assure the median life of the products under the new Weibull–Pareto distribution is not available in the literature. The proposed plan will be very useful in assuring the product median lifetime with minimum sample size as well as minimum cost in all the manufacturing industries.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 5
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 9 January 2024

Mahendra Saha, Pratibha Pareek, Harsh Tripathi and Anju Devi

First is to develop the time truncated median control chart for the Rayleigh distribution (RD) and generalized RD (GRD), respectively. Second is to evaluate the performance of…

Abstract

Purpose

First is to develop the time truncated median control chart for the Rayleigh distribution (RD) and generalized RD (GRD), respectively. Second is to evaluate the performance of the proposed attribute control chart which depends on the average run length (ARL) and third is to include real life examples for application purpose of the proposed attribute control chart.

Design/methodology/approach

(1) Select a random sample of size n from each subgroup from the production process and put them on a test for specified time t, where t = ? × µe. Then, count the numbers of failed items in each subgroup up to time t. (2) Step 2: Using np chart, define D = np, the number of failures, which also a random variable follows the Binomial distribution. It is better to use D = np chart rather than p chart because the authors are using number of failure rather than proportion of failure p. When the process is in control, then the parameters of the binomial distribution are n and p0, respectively. (3) Step 3: The process is said to be in control if LCL = D = UCL; otherwise, the process is said to be out of control. Hence, LCL and UCL for the proposed control chart.

Findings

From the findings, it is concluded that the GRD has smaller ARL values than the RD for specified values of parameters, which indicate that GRD performing well for out of control signal as compared to the RD.

Research limitations/implications

This developed control chart is applicable when real life situation coincide with RD and GRD.

Social implications

Researcher can directly use presented study and save consumers from accepting bad lot and also encourage producers to make good quality products so that society can take benefit from their products.

Originality/value

This article dealt with time truncated attribute median control chart for non-normal distributions, namely, the RD and GRD, respectively. The structure of the proposed control chart is developed based on median lifetime of the RD and GRD, respectively.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 5
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 13 December 2022

Jimut Bahan Chakrabarty, Soumya Roy and Shovan Chowdhury

In order to reduce avoidably lengthy duration required to test highly reliable products under usage stress, accelerated life test sampling plans (ALTSPs) are employed. This paper…

Abstract

Purpose

In order to reduce avoidably lengthy duration required to test highly reliable products under usage stress, accelerated life test sampling plans (ALTSPs) are employed. This paper aims to build a decision model for obtaining optimal sampling plan under accelerated life test setting using Type-I hybrid censoring scheme for products covered under warranty.

Design/methodology/approach

The primary decision model proposed in this paper determines ALTSP by minimizing the relevant costs involved. To arrive at the decision model, the Fisher information matrix for Type-I hybrid censoring scheme under accelerated life test setting is derived. The optimal solution is attained by utilizing appropriate techniques following a nonlinear constrained optimization approach. As a special case, ALTSP for Type-I censoring is obtained using the same approach. ALTSP under Type-I hybrid censoring using the variance minimization approach is also derived.

Findings

On comparing the optimal results obtained using the above mentioned approaches, it is found that the cost minimization approach does better in reducing the total cost incurred. Results also show that the proposed ALTSP model under cost function setting has considerably lower expected testing time. Interesting findings from the sensitivity analysis conducted using a newly introduced failure dataset pertaining to locomotive controls are highlighted.

Originality/value

The research introduces a model to design optimum ALTSP for Type-I hybrid censoring scheme. The practical viability of the model makes it valuable for real-life situations. The practical application of the proposed model is exemplified using a real-life case.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 7
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 30 September 2021

Damla Yüksel, Yigit Kazancoglu and P.R.S Sarma

This paper aims to create a new decision-making procedure that uses “Lot-by-Lot Acceptance Sampling Plan by Attributes” methodology in the production processes when any production…

Abstract

Purpose

This paper aims to create a new decision-making procedure that uses “Lot-by-Lot Acceptance Sampling Plan by Attributes” methodology in the production processes when any production interruption is observed in tobacco industry, which is a significant example of batch production.

Design/methodology/approach

Based on the fish bone diagram, the reasons of the production interruptions are categorized, then Lot-by-Lot Acceptance Sampling Plan by Attributes is studied to overcome the reasons of the production interruptions. Furthermore, managerial aspects of decision making are not ignored and hence, acceptance sampling models are determined by an Analytical Hierarchy Process (AHP) among the alternative acceptance sampling models.

Findings

A three-phased acceptance sampling model is generated for determination of the reasons of production interruptions. Hence, the necessary actions are provided according to the results of the proposed acceptance sampling model. Initially, 729 alternative acceptance sampling models are found and 38 of them are chosen by relaxation. Then, five acceptance sampling models are determined by AHP.

Practical implications

The current experience dependent decision mechanism is suggested to be replaced by the proposed acceptance sampling model which is based on both statistical and managerial decision-making procedure.

Originality/value

Acceptance sampling plans are considered as a decision-making procedure for various cases in production processes. However, to the best of our knowledge Lot-by-Lot Acceptance Sampling Plan by Attributes has not been considered as a decision-making procedure for batch production when any production interruption is investigated.

Details

International Journal of Quality & Reliability Management, vol. 39 no. 3
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 5 of 5