Search results

1 – 10 of 11
Per page
102050
Citations:
Loading...
Available. Open Access. Open Access
Article
Publication date: 25 January 2010

Olawale O. Ogunsemi, Francis A. Oluwole, Festus Abasiubong, Adebayo R. Erinfolami, Olufemi E. Amoran, Adekunle J. Ariba, Christopher O. Alebiosu and Michael O. Olatawura

Mental disorders lead to difficulties in social, occupational and marital relations. Failure to detect mental disorder denies patients potentially effective treatment. This study…

743

Abstract

Mental disorders lead to difficulties in social, occupational and marital relations. Failure to detect mental disorder denies patients potentially effective treatment. This study aimed to assess the prevalence and nature of mental disorders at the primary care settings and the recognition of these disorders by the attending physicians. Over a period of eight weeks, consecutive and consenting patients who attended three randomly selected primary health care facilities in Sagamu Local Government Area of Ogun state were recruited and administered a questionnaire that included a socio-demographic section and Patient Health Questionnaire (PHQ). A total of 412 subjects took part in the study. Subject age ranged from 18-90 years with a mean age of 52.50±21.08 years. One hundred and seventy-six (42.7%) of the subjects were males. A total of 120 (29.1%) of the subjects had depressive disorder, 100 (24.3%) had anxiety disorder, 196 (47.6%) somatoform disorder and 104 (25.2%) met the criteria for an alcohol related problem. The PHC physicians were only able to diagnose disorders relating to mental health in 52 (12.6%) of the subjects. Health and work situations accounted for more than three-quarters of the causes of stress experienced by the subjects. We conclude that there is a high prevalence of mental disorders among patients seen in primary care settings and that a significant proportion of them are not recognized by the primary care physicians. Stress relating to health, work and financial problems is common among primary health care attendees. Physicians in primary health care should be alert to the possibility and the impact of undetected psychiatric morbidity.

Details

Mental Illness, vol. 2 no. 1
Type: Research Article
ISSN: 2036-7465

Keywords

Available. Open Access. Open Access
Article
Publication date: 22 February 2011

Adebayo Erinfolami, Adekunle Eegunranti, Olawale Ogunsemi, Akin Oguntuase, Abiola Akinbode and Gloria Erinfolami

The objectives of this study were to determine the prevalence and pattern of Kola nut use among secondary school students in Osogbo, Osun State, Nigeria. The study also aimed to…

309

Abstract

The objectives of this study were to determine the prevalence and pattern of Kola nut use among secondary school students in Osogbo, Osun State, Nigeria. The study also aimed to determine the association of socio-demographic variables (of the students and their parents) with kola nut chewing. A questionnaire consisting of socio-demographic variables, the stimulant use section of the WHO Students Drug Use Questionnaire was administered on three hundred and eighty-five (385) randomly selected students of the two Local Government Areas of Osogbo. The prevalence rate of kola nut use was calculated and some socio demographic variables were determined. The 30-day prevalence rate of kola nut use was 11.2%. The one-year prevalence of kola nut use was 29.1 percent and the lifetime rate was 74.8 percent. Majority of users started at age 14 years or below. Kola nut use was associated with lower age group, poor school attendance, polygamous background, low education of mother, high education of father and the description of mother as being too permissive. The findings suggest the need to increase the awareness of the dangers of kolanut use among adolescents. Control program are urgently needed to prevent student wastage.

Details

Mental Illness, vol. 3 no. 1
Type: Research Article
ISSN: 2036-7465

Keywords

Access Restricted. View access options
Article
Publication date: 3 May 2022

Olufisayo Adedokun and Temitope Egbelakin

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on…

457

Abstract

Purpose

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on projects. In the past decades, there has been increasing application of linear assessments of risks in construction risk management practices. However, this study aims to assess the influence of risk factors on the success of tertiary education building projects using a structural equation modelling approach. This study will further reinforce the risk factors that require attention because risk factors are not linear but interdependent.

Design/methodology/approach

A quantitative research method was undertaken in this study, where data collection was achieved via a structured questionnaire survey. In total, 452 questionnaires were administered to client representatives, consultants and contractors involved in executing tertiary education building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were found usable for the analysis, implying a response rate of 61.73%. The Cronbach α test, average variances extracted and composite reliabilities values show high reliability and internal consistency of the instrument used for data gathering. Furthermore, the study adopted percentile, mean, correlation, regression analysis and structural equation modelling for analyzing the data collected upon which the study’s inferences were based.

Findings

The study found that three out of six criteria for measuring the success of tertiary education building projects were significantly affected by risk factors while using the structural equation modelling technique. With this non-linear method of assessment, completion to time was significantly impacted by environmental risk factors. In addition, safety performance was also significantly influenced by logistic, environmental and legal risk factors; furthermore, logistics, design and environmental risks significantly affected profit. However, completion to cost, standard/quality and end-user satisfaction was not significantly affected by the risk factors in tertiary education building projects.

Research limitations/implications

The quantitative data used for the analysis are limited to the tertiary education building projects from selected five tertiary education institutions in Ondo State; therefore, the results do not indicate all tertiary institutions in Nigeria. In addition, the findings are based on building projects that were procured through a competitive tendering arrangement only and thus considered a limitation for this study.

Practical implications

Not all the risks significantly influence the tertiary education building projects. Therefore, risk factors with a significant effect on the success indicators of tertiary education building projects should be prioritized for a successful project. While risk factors have not affected the completion to cost per se, the study implies that the resultant effect of risks on other success indicators could have a cascading effect on these projects in terms of cost and time overruns. These results may assist during the project risk management while also addressing complexity and uncertainty to avoid chaos in a tertiary education building projects.

Originality/value

The study found significant construction risk factors impacting the success of tertiary education building projects using a non-linear methodology, an extension beyond the usual linear method of assessment of risk impacts on the project performance.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Access Restricted. View access options
Article
Publication date: 23 November 2021

Olufisayo Adewumi Adedokun, Temitope Egbelakin, Deborah Oluwafunke Adedokun and Johnson Adafin

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among…

233

Abstract

Purpose

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among others. Therefore, rather than the impacts of risks on the overall project performance, which is common in the construction management literature, the purpose of this study is to assess the impacts of risk factors on the criteria for measuring the success of public TEBP.

Design/methodology/approach

The paper adopted a quantitative research method where the data collection was via a questionnaire survey. The researcher administered 452 questionnaires to the client representatives, consultants and contractors involved in building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and suitable for the analysis, translating to a 61.73% response rate. The reliability analysis of the research instrument showed 0.965 and 0.807, via Cronbach’s alpha test, indicating high reliability of the instrument used for data collection.

Findings

The study found different risk factors affecting the criteria for measuring the success of TEBP. For instance, the environmental risk factor significantly impacted completion to cost, while financial and political risk factors significantly impacted completion to time. In addition, while environmental, legal and management risks significantly impacted end-user satisfaction, safety performance was significantly impacted by logistic, legal, design, construction, political and management risks. Besides, the logistic, legal, design, construction, financial, political and management risk factors impacted profit. However, despite profit being one of the criteria for measuring the success of building projects, it recorded the highest risk impacts amounting to 41% variance.

Research limitations/implications

The findings are limited to the public tertiary education building projects procured via competitive tendering; therefore, the results might differ when considering other procurement methods.

Practical implications

The practical implication is that rather than focusing on all risk factors, the project stakeholders could give adequate attention to the significant risk factors impacting each of the parameters for measuring the success of education building projects.

Originality/value

The study revealed specific risk factors impacting the criteria for measuring the success of TEBP, which extend beyond the use of the overall project performance approach.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 4 December 2017

Gabriel Nani, Isaac Mensah and Theophilus Adjei-Kumi

A major concern for construction professionals at the rural road agency in Ghana is the problem of fixing contract duration for bridge construction projects in rural areas. The…

409

Abstract

Purpose

A major concern for construction professionals at the rural road agency in Ghana is the problem of fixing contract duration for bridge construction projects in rural areas. The purpose of the study was to develop a tool for construction professionals to forecast duration for bridge projects.

Design/methodology/approach

In all, 100 questionnaires were distributed to professionals at the Department of Feeder Roads to ascertain their views on the work items in a bill of quantities (BOQ) that impact significantly on the duration of bridge construction projects. Historical data for 30 completed bridge projects were also collected from the same Department. The data collected were executed work items in BOQ and actual durations used in completing the works. The qualitative data were analysed using the relative importance index and the quantitative data, processed and analysed using both the stepwise regression method and artificial neural network (ANN) technique.

Findings

The identified predictors, namely, in-situ concrete, weight of prefabricated steel components, gravel sub-base and haulage of aggregates, used as independent variables resulted in the development of a regression model with a mean absolute percentage error (MAPE) of 25 per cent and an ANN model with a feed forward back propagation algorithm with an MAPE of 26 per cent at the validation stage. The study has shown that both regression and ANN models are appropriate for predicting the duration of a new bridge construction project.

Research limitations/implications

The predictors used in the developed models are limited to work items in BOQs only of completed bridge construction projects as well as the small sample size.

Practical implications

The study has developed a working tool for practitioners at the agency to forecast contract duration for bridge projects prior to its commencement.

Originality value

The study has quantified the relationship between the work items in BOQs and the duration of bridge construction projects using the stepwise regression method and the ANN techniques.

Details

Journal of Engineering, Design and Technology, vol. 15 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 4 September 2019

Michael Adesi, De-Graft Owusu-Manu and Frank Boateng

Notwithstanding that numerous studies have focused on strategy in quantity surveying (QS) professional service firms, there is a paucity of investigation on the segmentation of QS…

592

Abstract

Purpose

Notwithstanding that numerous studies have focused on strategy in quantity surveying (QS) professional service firms, there is a paucity of investigation on the segmentation of QS professional services. The purpose of this study is to investigate the segmentation of QS services for diversification and a focus strategy formation.

Design/methodology/approach

This study adopts the positivist stance and quantitative approach in which a simple random sampling technique was used to select participants. In total, 110 survey questionnaires were administered to registered professional QS, out of which 79 completed questionnaires were returned for analysis.

Findings

The paper identifies three main QS service segments characterised by low, moderate and high competition. In addition, this study found that the concentration of traditional QS services in the building construction sector is due to the unwillingness of QS professional service firms to diversify into the non-construction sectors such as oil and gas. The diversification of QS services in the low competitive segment requires the adoption of agile approaches.

Research limitations/implications

The study was limited to numeric analyses and so would be complemented by qualitative research in the future.

Practical implications

This paper is useful to QS professional service firms interested in diversifying their services into the non-construction sectors to enhance the pricing of their services.

Originality/value

Segmentation of QS services is fundamental to the formulation of focus strategy for non-construction sectors such as oil and gas and mining to enhance the pricing of QS professional services.

Details

Journal of Financial Management of Property and Construction , vol. 24 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Article
Publication date: 9 April 2018

Azlan Shah Ali, Nur Farhana Azmi and Timothy Kurannen Baaki

Refurbishment is inherently more sustainable than building new. However, planned and actual costs of refurbishment projects are bound to vary due to the complex nature of most…

1141

Abstract

Purpose

Refurbishment is inherently more sustainable than building new. However, planned and actual costs of refurbishment projects are bound to vary due to the complex nature of most such projects. This can affect the performance of refurbishment work. The purpose of this paper is to examine factors responsible for elemental cost variations between the actual and planned costs of refurbishment projects. The study also examines factors that contribute to differences in actual and planned cost between refurbishment and new build projects.

Design/methodology/approach

A quantitative approach was adopted for this study. A literature review identified factors responsible for elemental cost variations in refurbishment projects, as well as factors responsible for differences in actual and planned cost of new build and refurbishment projects. This was followed by a questionnaire survey of refurbishment projects across Malaysia. A total of 55 respondents provided input through a questionnaire survey to identify these factors.

Findings

This study demonstrates that procurement strategy (PS), inappropriate contractors (IC), poor project management (PPM), availability of funding, materials and equipment, and force majeure (FM) significantly affect refurbishment cost performance. Electrical installations, firefighting equipment, and painting were the building elements most affected by cost variations. A regression model for refurbishment cost prediction indicates that PS, IC, PPM, availability of funding, materials and equipment, and FM were significant predictors of building refurbishment cost performance.

Originality/value

This paper provides insight into the major factors affecting elemental cost variation of refurbishment works, as well as building elements most affected by cost variations and provides a model for predicting refurbishment cost performance.

Details

International Journal of Building Pathology and Adaptation, vol. 36 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Access Restricted. View access options
Article
Publication date: 3 June 2021

Jeffrey Boon Hui Yap, Martin Skitmore, Yi Wen Lim, Siaw-Chuing Loo and Jason Gray

Quantity surveying is a profession that blends engineering, construction and economics. To be competent is to have the ability to apply the set of related knowledge, skills and…

1763

Abstract

Purpose

Quantity surveying is a profession that blends engineering, construction and economics. To be competent is to have the ability to apply the set of related knowledge, skills and abilities to perform a task effectively. This paper examines the competency requirements for quantity surveyors (QSs) in the face of changing and increasing client needs.

Design/methodology/approach

Based on a detailed meta-analysis of the literature, 12 basic/core and 16 evolving competencies are identified. Primary data were gathered through a field survey involving practicing QSs from client, consultant and contractor organisations, and university students undertaking QS programmes in Malaysia. The data obtained were analysed using both descriptive and inferential statistical tools.

Findings

The significance of the basic/core and evolving competencies are presented. Overall, the most important contemporary skills are cost planning, valuation of works, measurement/quantification and contract documentation. The evolved roles require expertise in communication and negotiation, ethics and professional conduct and value management. The analysis of variance (ANOVA) indicates there are misaligned expectations of the proficiency levels needed to provide contemporary and future services between practitioners in client/consultant organisations, contractors and new generation students.

Originality/value

The findings provide guidance on the education, training and practice of quantity surveying to deal with emerging challenges in the dynamic built environments in Malaysia and beyond.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 10 December 2021

Ahmed Farouk Kineber, Idris Othman, Ayodeji Emmanuel Oke, Nicholas Chileshe and Tarek Zayed

The purpose of this paper is to examine the relationship between overcoming the value management (VM) implementation barriers and VM implementation in the Egyptian building sector.

920

Abstract

Purpose

The purpose of this paper is to examine the relationship between overcoming the value management (VM) implementation barriers and VM implementation in the Egyptian building sector.

Design/methodology/approach

A critical review of the literature on VM was used to through bibliometric analysis has been conducted to highlight the studies’ gap and establish the VM barriers. These obstacles were then contextually transformed via a semi-structured interview and a pilot study, and subsequently organized in the form of a theoretical model. The primary data was collected from 335 building stakeholders in Egypt through the administration of questionnaire surveys. Consequently, structural equation models of partial least squares were applied to statistically assess the final model of VM barriers.

Findings

The bibliometric analysis shows that there is an inadequate study on VM implementation barriers in the Egyptian construction industry and insufficient studies on implementing VM in developing countries. Results obtained from the proposed model showed that overcoming the VM barriers has a major connection with successful VM implementation. This is indicated with the value of ß = 0.743, which is necessary when the firm is overcoming 1 unit of VM barriers.

Originality/value

This study fills the knowledge gap by identifying and emphasizing the critical obstacles to VM implementation.

Access Restricted. View access options
Article
Publication date: 31 January 2022

Asha Dulanjalie Palihakkara and B.A.K.S. Perera

Guaranteed maximum price (GMP) contracts are becoming an increasingly popular contract solution; however, many projects experience higher levels of risk and exceed predetermined…

241

Abstract

Purpose

Guaranteed maximum price (GMP) contracts are becoming an increasingly popular contract solution; however, many projects experience higher levels of risk and exceed predetermined GMPs, failing to accomplish the main motive behind the concept. Thus, the study identified a risk management process for GMP projects.

Design/methodology/approach

The study adopted a quantitative approach consisting of three Delphi rounds. The collected data were analysed using statistical data analysis tools.

Findings

The study identified 17 highly significant risk factors in GMP projects and determined their levels of severity. Subsequently, risk allocation amongst the client, contractor and consultant and strategies to handle the most significant risk factors were determined. The study identified poorly defined scope and design changes as the most critical risks in GMP projects. Moreover, strategies such as clearly defining the project scope, preparing precise documentation, early involvement of the contractor and using a partnering approach can be deployed to reduce the risk in GMP projects. Each risk has to be assigned to the party who can best manage it, depending on its nature.

Originality/value

The study addresses the literature gap pertaining to risk management of GMP contracts by identifying its overall process, including the identification of significant risks based on the severity levels; risk allocation amongst the client, contractor and consultant; and identification of risk handling techniques suitable for each significant risk factor. The study contributes to the industry by identifying a systematic risk management process to implement GMP projects successfully within the stipulated time, cost and quality.

Details

Smart and Sustainable Built Environment, vol. 11 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of 11
Per page
102050