Olufisayo Adedokun and Temitope Egbelakin

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on…

457

Abstract

Purpose

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on projects. In the past decades, there has been increasing application of linear assessments of risks in construction risk management practices. However, this study aims to assess the influence of risk factors on the success of tertiary education building projects using a structural equation modelling approach. This study will further reinforce the risk factors that require attention because risk factors are not linear but interdependent.

Design/methodology/approach

A quantitative research method was undertaken in this study, where data collection was achieved via a structured questionnaire survey. In total, 452 questionnaires were administered to client representatives, consultants and contractors involved in executing tertiary education building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were found usable for the analysis, implying a response rate of 61.73%. The Cronbach α test, average variances extracted and composite reliabilities values show high reliability and internal consistency of the instrument used for data gathering. Furthermore, the study adopted percentile, mean, correlation, regression analysis and structural equation modelling for analyzing the data collected upon which the study’s inferences were based.

Findings

The study found that three out of six criteria for measuring the success of tertiary education building projects were significantly affected by risk factors while using the structural equation modelling technique. With this non-linear method of assessment, completion to time was significantly impacted by environmental risk factors. In addition, safety performance was also significantly influenced by logistic, environmental and legal risk factors; furthermore, logistics, design and environmental risks significantly affected profit. However, completion to cost, standard/quality and end-user satisfaction was not significantly affected by the risk factors in tertiary education building projects.

Research limitations/implications

The quantitative data used for the analysis are limited to the tertiary education building projects from selected five tertiary education institutions in Ondo State; therefore, the results do not indicate all tertiary institutions in Nigeria. In addition, the findings are based on building projects that were procured through a competitive tendering arrangement only and thus considered a limitation for this study.

Practical implications

Not all the risks significantly influence the tertiary education building projects. Therefore, risk factors with a significant effect on the success indicators of tertiary education building projects should be prioritized for a successful project. While risk factors have not affected the completion to cost per se, the study implies that the resultant effect of risks on other success indicators could have a cascading effect on these projects in terms of cost and time overruns. These results may assist during the project risk management while also addressing complexity and uncertainty to avoid chaos in a tertiary education building projects.

Originality/value

The study found significant construction risk factors impacting the success of tertiary education building projects using a non-linear methodology, an extension beyond the usual linear method of assessment of risk impacts on the project performance.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Access Restricted. View access options
Article
Publication date: 23 November 2021

Olufisayo Adewumi Adedokun, Temitope Egbelakin, Deborah Oluwafunke Adedokun and Johnson Adafin

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among…

232

Abstract

Purpose

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among others. Therefore, rather than the impacts of risks on the overall project performance, which is common in the construction management literature, the purpose of this study is to assess the impacts of risk factors on the criteria for measuring the success of public TEBP.

Design/methodology/approach

The paper adopted a quantitative research method where the data collection was via a questionnaire survey. The researcher administered 452 questionnaires to the client representatives, consultants and contractors involved in building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and suitable for the analysis, translating to a 61.73% response rate. The reliability analysis of the research instrument showed 0.965 and 0.807, via Cronbach’s alpha test, indicating high reliability of the instrument used for data collection.

Findings

The study found different risk factors affecting the criteria for measuring the success of TEBP. For instance, the environmental risk factor significantly impacted completion to cost, while financial and political risk factors significantly impacted completion to time. In addition, while environmental, legal and management risks significantly impacted end-user satisfaction, safety performance was significantly impacted by logistic, legal, design, construction, political and management risks. Besides, the logistic, legal, design, construction, financial, political and management risk factors impacted profit. However, despite profit being one of the criteria for measuring the success of building projects, it recorded the highest risk impacts amounting to 41% variance.

Research limitations/implications

The findings are limited to the public tertiary education building projects procured via competitive tendering; therefore, the results might differ when considering other procurement methods.

Practical implications

The practical implication is that rather than focusing on all risk factors, the project stakeholders could give adequate attention to the significant risk factors impacting each of the parameters for measuring the success of education building projects.

Originality/value

The study revealed specific risk factors impacting the criteria for measuring the success of TEBP, which extend beyond the use of the overall project performance approach.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 23 September 2013

O.A. Adedokun, O.T. Ibironke, D.O. Dairo, I.O. Aje, O.A. Awodele, A.D. Opawole, O.F. Akinradewo and J.O. Abiola-Falemu

The purpose of this paper is to evaluate the adoption of quantitative risk analysis techniques (QRAT) on construction projects in Nigeria with a view to providing better…

901

Abstract

Purpose

The purpose of this paper is to evaluate the adoption of quantitative risk analysis techniques (QRAT) on construction projects in Nigeria with a view to providing better understanding on the state of these techniques.

Design/methodology/approach

Questionnaire survey was employed in gathering data for the study. The paper assessed the level of knowledge, awareness, utilization, success and the factors influencing the adoption of QRAT. The primary data employed were obtained by using multiple-choice questionnaire administered to the selected large construction companies in Nigeria.

Findings

The result of the study revealed a low level adoption of QRAT, and this inhibits Nigerian construction industry from taking full advantage inherent in QRAT. Also, it prevents the analysis of risks peculiar to construction projects. Furthermore, inadequate training and record keeping on risk management were identified as significant factors affecting the adoption/utilization of QRAT on construction projects.

Research limitations/implications

Multiple-choice questionnaires administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, and mechanical and electrical engineers) were limited to the selected large construction companies in the category D of the Nigerian Federal Tender Board.

Originality/value

This empirical inquiry provided strong evidence on the state of QRAT of construction projects in Nigeria. The findings revealed insightful perspectives to understand construction project QRAT in its entirety. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Details

Journal of Facilities Management, vol. 11 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Access Restricted. View access options
Article
Publication date: 15 February 2013

O.A. Adedokun, O.T. Ibironke and S.O. Babatunde

The purpose of this paper is to assess educational building projects with a view to determining the level of utilization of competitive tendering methods, factors influencing…

2175

Abstract

Purpose

The purpose of this paper is to assess educational building projects with a view to determining the level of utilization of competitive tendering methods, factors influencing their choice and predisposition to risk factors, in order to ensure effective construction project delivery.

Design/methodology/approach

The paper assessed the level of utilization of competitive tendering methods, the factors influencing their choice and finally the predisposition of each of the methods to risk factors, adopting survey method which involved primary data, obtained by using multiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers).

Findings

It was found that the usage of open competitive tendering methods outweighed selective tendering method of procurement as a result of accountability and price competition involved, which made it predisposed to not only financial risk factors, but also political and logistics factors.

Research limitations/implications

Multiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers) was limited to selected institutions in the southwestern zone of Nigeria.

Practical implications

The most widely adopted method (open competitive tendering method) suffers from risk factors such as selective but high premium being placed on financial and logistic risk factors in order to achieve hitch‐free construction project delivery. These measures will help the stakeholders in assessing degrees of project complexity and better manage the potential risks that might be induced to different levels of competitive tendering methods of project procurement in relation to educational building projects.

Originality/value

This empirical investigation provides strong evidence on the procurement of educational building projects in response to due process policy. The findings provided insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Details

Journal of Facilities Management, vol. 11 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Access Restricted. View access options
Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered…

Abstract

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered that the Nigerian construction industry is confronted with fragmentation and poor information management. The stakeholders within the Nigerian construction industry proposed the adoption of SCM to overcome the fragmentation and other shenanigans facing the industry. This chapter revealed that construction supply chain (CSC) practices within the Nigerian construction industry focus on waste elimination by adopting the lean concept. The focus on the lean concept could be attributed to the numerous research related to lean or the enormous waste emanating from the Nigerian construction industry. Regardless of the emphasis on lean, the Nigerian CSC is still confronted with fragmentation and heavy waste generation. Thus, this chapter proposed the adoption of principles and technologies driven by the fourth industrial revolution (4IR) is a paradigm shift for the management of CSC in the country. It was discovered in this chapter that Nigerian construction supply stakeholders had not embraced the technologies and principles of the 4IR. The failure to adopt the technologies driven by the 4IR is attributed to the absence of a CSC model that depicts the management of CSC in alignment with the 4IR. This chapter called for developing a SCM model for the Nigerian construction industry in tandem with the principles and technologies of the 4IR.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Access Restricted. View access options
Article
Publication date: 30 August 2021

Olufisayo Adedokun, Isaac Aje, Oluwaseyi Awodele and Temitope Egbelakin

The non-performance of construction projects in meeting the set objectives has continued to draw researchers worldwide. Despite this, little attention is accorded to public…

136

Abstract

Purpose

The non-performance of construction projects in meeting the set objectives has continued to draw researchers worldwide. Despite this, little attention is accorded to public tertiary education building projects in Nigeria. Therefore, on this background, this study aims to assess the perceptions of stakeholders on the level of occurrence of risk factors in the public tertiary education building projects (TEBP) to enhance the performance of these projects.

Design/methodology/approach

The study adopted a quantitative method of data collection via a questionnaire survey. In total, 452 questionnaires were administered to the respondents comprising client representatives, consultants (quantity surveyors, architects, services and structural engineers and builders) and the contractor. The respondents were involved in the conception and execution of TEBP across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and found suitable for analysis, indicating a 61.73% response rate. The reliability analysis for the research instrument was 0.965 via the Cronbach α test, indicating the high reliability of the instrument used for the data collection. Moreover, the clusters of risk factors also had reliability values that ranged between 0.719 and 0.875.

Findings

The study found inflation, delayed payments in contracts, high competition bids, delay in work progress and occurrence of variations are the most frequently occurring risk factors in public TEBP. By contrast, difficulty to access the site, environmental factors and pollution were found to be low-weighted risks with the least likelihood of occurrence. The results of this study indicated the existence of significant differences in some of the risk factors in terms of the level of risk occurrence in TEBP. The risk factors were eventually clustered into eight major groups for TEBP. The post hoc comparisons using the least significant difference test also indicated differences between the contractors and consultants in the ranking of risks occurrence in TEBP, but no significant differences between clients/contractors and clients/consultants.

Research limitations/implications

The findings in this study are limited to the public TEBP procured via competitive tendering; therefore, the results might not be applicable when other procurement methods are being considered. Besides, the study classified the project participants based on organizations and not on the different ownership status of the projects, such as federal or state government-owned TEBP. However, the literature shows that likelihood of risk occurrence could vary due to the degree of project ownership.

Practical implications

The information provided with respect to the most frequently occurring risk factors would enhance the performance of public TEBP.

Originality/value

This study contributes to the existing body of knowledge on the subject within a previously unexplored context where insights were provided on the most frequently occurring risk factors on the public TEBP.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Available. Open Access. Open Access
Article
Publication date: 24 July 2024

Adebayo Adedokun, Isiaka Ayodeji Adeniyi and Clement Olalekan Olaniyi

The paper examines the asymmetric effects of fiscal deficits on selected macroeconomic variables in Nigeria, which include economic growth, exchange rates and inflation. The…

369

Abstract

Purpose

The paper examines the asymmetric effects of fiscal deficits on selected macroeconomic variables in Nigeria, which include economic growth, exchange rates and inflation. The existing works of literature are premised on symmetry assumptions with dichotomous findings. In such situations, they suggest using a nonlinear approach as an alternative to checkmate the findings premised on linearity. This is critical, considering the perpetual fiscal deficit trends of Nigeria, which are considered a major economic problem in the country.

Design/methodology/approach

The study employs nonlinear autoregressive distributed lag (NARDL) estimator using secondary data collected from the statistical bulletin of the Central Bank of Nigeria (CBN).

Findings

The results show that in the short run, both positive and negative shocks to the fiscal deficit have no effect on Nigeria's economic growth. The same is found on the negative shocks in the long run. However, positive shocks to the fiscal deficit have a long-run positive impact on economic growth. It is further revealed that, in the short run, positive shocks as well as negative shocks to fiscal deficits are positively related to the inflation rate. More so, long-run estimates show that positive shocks to the fiscal deficit have negative impacts on inflation, while negative shocks to the fiscal deficit have positive impacts on inflation.

Originality/value

This study introduces novelties to the understanding of the relationship between fiscal deficits and macroeconomic stability in Nigeria. It accounts for asymmetric and nonlinear features that are more aligned with the socioeconomic realities of real-world phenomena. This study also offers more insightful policy perspectives to enhance the fiscal profile of the country.

Details

International Trade, Politics and Development, vol. 8 no. 3
Type: Research Article
ISSN: 2586-3932

Keywords

Access Restricted. View access options
Article
Publication date: 25 April 2013

O.A. Adedokun, D.R. Ogunsemi, I.O. Aje, O.A. Awodele and D.O. Dairo

The purpose of this paper is to evaluate the adoption of qualitative risk analysis techniques (QRAT) on construction projects in Nigeria with the aim of providing better…

1921

Abstract

Purpose

The purpose of this paper is to evaluate the adoption of qualitative risk analysis techniques (QRAT) on construction projects in Nigeria with the aim of providing better understanding on the state of these techniques.

Design/methodology/approach

A questionnaire survey and an in‐depth interview were employed in gathering data for the study. The paper assessed the level of knowledge, awareness, utilization success and the factors affecting the utilization of qualitative risk analysis techniques. The primary data employed were obtained by using a multiple‐choice questionnaire administered to the selected large construction firms in Nigeria.

Findings

The result of the study revealed a low level adoption of QRAT, thus preventing the Nigerian construction industry from taking full advantage of QRAT in the analysis of risks inherent in construction projects. Also checklists, flowchart and assumption analysis were the commonly used QRAT in the study area. Furthermore, inadequate training and record keeping on risk management contributed largely to the factors affecting the utilization of QRAT on projects.

Research limitations/implications

Multiple‐choice questionnaires administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers) were limited to the selected large construction firms in the category D of the Nigerian Federal Tender Board.

Practical implications

The construction sector has not taken full advantage of QRAT in the analysis of risks inherent in construction projects. This has been responsible for cost and time overruns usually recorded. Analysing risks will help the stakeholders in assessing degrees of project complexity and better manage the potential risks that might be induced to different levels of construction projects in Nigeria in order to achieve hitch free construction project delivery.

Originality/value

This empirical inquiry provides strong evidence on the state of qualitative risk analysis techniques of construction projects in Nigeria. The findings provide insightful perspectives to understand construction project QRAT in its entirety. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Details

Journal of Facilities Management, vol. 11 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

Access Restricted. View access options
Article
Publication date: 29 October 2020

Opeoluwa Adeniyi Adeosun, Philip Akanni Olomola, Adebayo Adedokun and Olumide Steven Ayodele

The increasing debate on the viability of broad-based productive employment in stimulating the participatory tendencies of growth makes it instructive to inquire how the African…

436

Abstract

Purpose

The increasing debate on the viability of broad-based productive employment in stimulating the participatory tendencies of growth makes it instructive to inquire how the African “Big Five” have fared in their quests to ensure growth inclusiveness through public investment-led fiscal policy.

Design/methodology/approach

Time varying structures and nonlinearities in the government investment series are captured through the non-linear autoregressive distributed lag, asymmetric impulse responses and variance decomposition estimation techniques.

Findings

Study findings show that positive investment shocks stimulate growth inclusiveness by enabling access to opportunities through job creation and productive employment for the populace; this result is evident for Morocco and Algeria. However, there is a non-negligible evidence that shocks due to decline in the government investment manifest in insufficient capital stocks and limited investment opportunities, impede access to opportunities by the populace, hinder labour employability and make growth less inclusive. Furthermore, all short-run findings corroborate long-run results regarding the reaction of inclusive growth to positive investment shocks with the exclusion of South Africa; which, unlike its long-run finding, shows that shocks due to increases in investment can foster growth inclusiveness. Also, in respect to short-run negative investment shocks, Nigeria is the only country that does not align its long-run findings.

Practical implications

That public investment shocks make or mar inclusive growth effectiveness shows the need for appropriate fiscal policy consolidation and automatic stabilization guidelines to ensure buffers against shocks and to enhance government investment generation efficiency for a sustainable inclusive growth process that is more participatory in Africa.

Originality/value

This study is the first to accommodate possibilities of shocks in the inclusivity of growth analysis for the five biggest African economies which jointly account for over half of the recorded growth in the continent. As such, there is quantitative evidence that government investment is a potent determinant of growth inclusiveness and it is susceptible to structural changes and time variation of shocks.

Details

International Journal of Social Economics, vol. 47 no. 12
Type: Research Article
ISSN: 0306-8293

Keywords

Access Restricted. View access options
Article
Publication date: 21 August 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of…

265

Abstract

Purpose

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of diverse stakeholders. Conducting a bibliometric analysis, this paper aims to unravel the major research themes and methodologies utilised by researchers in studying the critical success criteria for construction projects, as well as extracting these success criteria.

Design/methodology/approach

The researchers systematically searched and screened 95 papers from Scopus and Web of Science (WoS) databases. This study conducted research focus parallelship network (RFPN) analysis and keywords co-occurrence network (KCON) analysis using BibExcel and Gephi to cluster the papers, illuminate the relationships among keywords within each cluster, and identify the primary research directions.

Findings

Using the RFPN analysis, this study classified the papers into three distinct clusters: infrastructure and public projects success, risk and knowledge management, and contractors and procurement management. Statistical techniques such as structural equation modelling (SEM) and multi-criteria decision-making methods such as analytic hierarchy process (AHP) have been used to analyse project success in the construction industry.

Research limitations/implications

Considering the intensified demand for streamlined digital interactions and the increasing emphasis on sustainability and safety performance, construction companies are recommended to allocate greater investments toward the automation and digitisation of their products and processes. Prioritising modular construction and embracing transformative technologies alongside data science is crucial for enabling well-informed decision-making, and enhancing project success.

Originality/value

This study contributes to the existing body of knowledge by conducting a quantitative and systematic evaluation of the literature on project success criteria in the construction industry and uncovering key research areas. It addresses the pressing need to understand the complexities of construction projects amidst evolving industry dynamics and emerging disruptions. Moreover, by highlighting the implications of digital innovations and modular construction, this study urges deeper exploration into their impact on project performance and stakeholder satisfaction. This research sets a comprehensive framework for investigating the interplay between project complexity, technological advancements, and sustainable practices in the construction sector, paving the way for strategic advancements in the field.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article