Search results
1 – 10 of 11Himal Suranga Jayasena, Niraj Thurairajah, B.A.K.S. Perera and Mohan Siriwardena
Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of…
Abstract
Purpose
Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of understanding that supports contextualized understanding of BIM adoption decisions in a BIM infant industry. The framework bridges the gap in current knowledge in terms of the absence of such a framework, which has hindered the structured understanding of the BIM decision of an adopter, curtailing the appropriate strategizing of their BIM adoption.
Design/methodology/approach
The study focuses on a BIM infant industry, where early adopters begin using BIM, allowing insights into this crucial initial stage of adoption. Identifying affordances as a versatile concept that could effectively represent not only what an adopter perceives and expects from BIM implementation, but also, what the adopter, in fact, can achieve from it, an affordance-led framework of understanding (AFU) was developed to comprehensively capture varying dynamics of BIM decision process. The study took a qualitative retroductive approach to theory with semi-structured interviews to gather necessary data from a sample of BIM adopters purposively selected to maximize the breadth and depth of data.
Findings
The study concludes by identifying and defining pertinent affordances as a new concept and a compulsory state for BIM adoption. Findings further demonstrate that existing theories can be linked to the AFU to strategically direct the affordances dynamics towards the pertinent state.
Originality/value
The AFU enables a deeper contextualizable view of innovation adoption that was absent in existing innovation studies. It significantly enhances the precision of strategizing BIM adoption compared to previous approaches, enabling adopters to plan and implement BIM in a manner that aligns well with their expectations and specific conditions.
Details
Keywords
Zahirah Mokhtar Azizi, James Cochrane, Niraj Thurairajah and Nurul Sakina Mokhtar Azizi
As remote working becomes increasingly popular, remote working could unlock new ways of working through digitisation. However, the construction sector has been slow to adopt…
Abstract
Purpose
As remote working becomes increasingly popular, remote working could unlock new ways of working through digitisation. However, the construction sector has been slow to adopt digitisation in its processes, making digitisation difficult to assess whether this affordance may be well received and the current capabilities of digitisation to achieve this effectively. The purpose of this paper is to investigate the interest in remote working amongst construction sector personnel and to examine the factors affecting remote working through digitisation affordances.
Design/methodology/approach
Based on a case study of one of the largest contractor firms in the United Kingdom, an online questionnaire survey was used to collect responses from 125 construction professionals. Statistical package for the social sciences (SPSS) was used to do basic statistical analysis on the results.
Findings
The findings show that there is a general appetite for remote working on a flexible basis where a mix of “on-site” and “off-site” arrangement was deemed practical. This could potentially unlock significant time and cost savings as well as productivity gains. The main factors affecting remote working were the availability of interconnected systems allowing efficient communication and digital infrastructure that enable automated processes.
Research limitations/implications
The research is limited to a large contractor company and may not be appropriate for small and medium-sized companies. The findings may benefit organisations to evaluate the practical needs of ensuring effective remote working in the construction industry and unlocking efficiencies.
Originality/value
The paper adds value to understanding the affordances and constraints of digitisation for remote working from the perspective of construction professionals.
Details
Keywords
Namal Thilakarathne, Akila Pramodh Rathnasinghe, Udayangani Kulatunga, Niraj Thurairajah and Lichini Weerasinghe
Most developing countries, such as Sri Lanka (SL), are now looking for the support of foreign construction companies for large-scale infrastructure projects in return for…
Abstract
Purpose
Most developing countries, such as Sri Lanka (SL), are now looking for the support of foreign construction companies for large-scale infrastructure projects in return for expertise and resources. Thus, foreign companies may enter into agreements with local contractors through joint ventures (JVs). However, the priorities of construction project stakeholders may differ, which may ultimately end up in conflicts. Therefore, this research aims to investigate the most suitable conflict management strategies for international construction JVs (ICJVs) considering the SL context.
Design/methodology/approach
The mixed method was used for the research choice by selecting a questionnaire survey and expert interviews. Completed questionnaires (n = 78) were analysed using statistical techniques. The expert interviews with six industry practitioners were piloted to increase the validity and credibility of survey findings through a triangulation process where the collected data was analysed through content analysis.
Findings
The findings confirm that JV parties should first seek collaborative solutions in a conflict and seek legal redress only when those efforts are unsuccessful. Collaborating and compromising were recommended as the most appropriate tactics if an informal approach to conflict management was chosen. Alternative dispute resolution and litigation were identified as formal conflict management strategies.
Originality/value
This study, to the best of the authors’ knowledge, will be the first of its kind in SL, which will lead to a better understanding of conflict management in IJCVs and will encourage other researchers to extend this study through further work.
Details
Keywords
Umesha Sasanthi Weerapperuma, Akila Pramodh Rathnasinghe, Himal Suranga Jayasena, Chamitha Sanjani Wijewickrama and Niraj Thurairajah
A novel facet of the construction industry's (CI) digital transformation relates to the rise of smart contracts, and the contribution of blockchain technology in this domain…
Abstract
Purpose
A novel facet of the construction industry's (CI) digital transformation relates to the rise of smart contracts, and the contribution of blockchain technology in this domain appears to be nascent but rapidly gaining traction. Although the benefits of digitalisation for technologically less enthusiastic CI are irrefutable, the adoption of smart contracts has been found to be low pertaining to industry professionals' behavioural factors stimulated by technological perception. The challenge undertook by this study, therefore, is to develop a knowledge framework for blockchain-enabled smart contract adoption in the CI.
Design/methodology/approach
From a methodological perspective, this study employed a qualitative approach that involved semi-structured interviews with ten (10) highly experienced CI practitioners involved in digital innovations for data collection. Directed content analysis was performed using NVivo 12 software, which enabled the creation of preliminary open codes. Subsequently, these open codes were grouped into similar categories to develop axial codes. Finally, the study presented final themes along with their corresponding descriptions.
Findings
Notably, research findings expanded the current body of knowledge on perceived attributes and their measurement items to determine the perception of innovation adoption in CI, where a total of nine (9) perceived attributes were associated with thirty-two (32) measurement items.
Originality/value
The measurement items were seen as having an extensive impact on the CI professionals' decision to adopt blockchain-enabled smart contracts. With ensuing implications, this study represents one of the first to present a knowledge framework exclusively customised for blockchain-enabled smart contracts, laying the groundwork for effective technological adoption by CI professionals.
Details
Keywords
Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…
Abstract
Purpose
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.
Design/methodology/approach
The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.
Findings
Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.
Research limitations/implications
This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.
Practical implications
The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.
Originality/value
The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.
Details
Keywords
Lichini Nikesha Weerasinghe, Akila Pramodh Rathnasinghe, Himal Suranga Jayasena, Niraj Thurairajah and Menaha Thayaparan
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the…
Abstract
Purpose
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the cruciality of BIM, associated costs have been identified as one of the major barriers to successful BIM implementation, as is the case in Sri Lanka. Besides, lean principles (LPs) are known for increasing efficiency, quality and eliminating waste, thereby reducing overall costs. Hence, this research aims at addressing the BIM implementation barrier associated with costs by applying suitable LP, enhancing overall value by minimising value-insignificant activities.
Design/methodology/approach
The study adopted a qualitative research approach. 10 experts with expertise in both BIM and LP were targeted for the primary data collection through semi-structured interviews. The collected data were analysed using manual content analysis.
Findings
Research findings discovered the cost centres that can be applied to the LPs and the effective LPs that can be applied with the cost centres of BIM implementation. The theoretical implication of the study is to provide insights into a potential application of LP for BIM cost centres, whereas practical consequences include the identification of LP's potential to minimise BIM cost centres, ergo, achieving a successful BIM implementation.
Originality/value
This study will be the first of its kind in the Sri Lankan construction industry, intending to apply LP with BIM implementation cost centres to achieve a successful implementation. This research also has paved the way forward for further research on the application of both the BIM and LP concepts for similar construction industries in developing countries across the world and in addressing other BIM implementation barriers.
Details
Keywords
Jianfeng Zhao, Niraj Thurairajah, David Greenwood, Henry Liu and Jingfeng Yuan
The unprecedented SARS-CoV-2 (COVID-19) pandemic has further constrained the budgets of governments worldwide for delivering their much-needed infrastructure. Consequently…
Abstract
Purpose
The unprecedented SARS-CoV-2 (COVID-19) pandemic has further constrained the budgets of governments worldwide for delivering their much-needed infrastructure. Consequently, public-private partnerships (PPPs), with the private sector's investment and ingenuity, would appear to be an increasingly popular alternative. Value for money (VfM) has become the major criterion for evaluating PPPs against the traditional public sector procurement and, however, is plagued with controversy. Hence, it is important that governments compare and contrast their practice with similar and disparate bodies to engender best practice. This paper, therefore, aims to understand governments' assessment context and provide a cross-continental comparison of their VfM assessment.
Design/methodology/approach
Faced with different domestic contexts (e.g. aging infrastructure, population growth, and competing demands on finance), governments tend to place different emphases when undertaking the VfM assessment. In line with the theory of boundary spanning, a cross-continental comparison is conducted between three of the most noticeable PPP markets (i.e. the United Kingdom, Australia and China) about their VfM assessment. The institutional level is interpreted by a social, economic and political framework, and the methodological level is elucidated through a qualitative and quantitative VfM assessment.
Findings
There are individual institutional characteristics that have shaped the way each country assesses VfM. For the methodological level, we identify that: (1) these global markets use a public sector comparator as the benchmark in VfM assessment; (2) ambiguous qualitative assessment is conducted only against PPPs to strengthen their policy development; (3) Australia's priority is in service provision whereas that of the UK and China is project finance and production; and (4) all markets are seeking an amelioration of existing controversial VfM assessments so that purported VfM relates to project lifecycles. As such, an option framework is proposed to make headway towards a sensible selection of infrastructure procurement approaches in the post COVID-19 era.
Originality/value
This study addresses a current void of enhancing the decision-making process for using PPPs within today's changing environment and then opens up an avenue for future empirical research to examine the option framework and ensuing VfM decisions. Practically, it presents a holistic VfM landscape for public sector procurers that aim to engage with PPPs for their infrastructure interventions.
Details
Keywords
Tochukwu Ben C. Onyido, David Boyd and Niraj Thurairajah
The purpose of this paper is to establish opportunities for small- and medium-sized enterprises (SMEs) to become environmental businesses. The “Environmental Business” concept…
Abstract
Purpose
The purpose of this paper is to establish opportunities for small- and medium-sized enterprises (SMEs) to become environmental businesses. The “Environmental Business” concept refers to a commercial organisation that provides goods and/or services which provide socio-environmental value and which are produced in such a way that the organisation addresses environmental and social problems.
Design/methodology/approach
Interviewing and observation were used to conduct a case study of how 30 SMEs prepared for the UK’s Green Deal programme in the West Midlands County, UK. In total, 20 interviews were conducted and 23 field notes were recorded. Based on the literature review, the research enquiry into practice, and the philosophical approach of pragmatism adopted by the research, a “Three Ps” (profit, process and product) analytical framework was established with which to operationalise the environmental business.
Findings
The research identifies tactical opportunities that assist SMEs to function as environmental businesses whilst maintaining the traditional focus on economic performance. It also shows the benefits and challenges involved.
Research limitations/implications
The research focused on a case study related to specific sectors (building and energy) within a specific UK region (West Midlands), which limits the generalisability of the results.
Practical implications
The research highlights practical opportunities for SMEs to address existing environmental and social problems through their products and processes and prevent new problems arising due to their operations.
Originality/value
This research represents an initial step in developing a pragmatic implementation model by which SMEs can overcome barriers to being environmental businesses whilst maximising business advantages.
Details