Chukwuka Christian Ohueri, Wallace Imoudu Enegbuma, Ngie Hing Wong, Kuok King Kuok and Russell Kenley
The purpose of this paper is to develop a motivation framework that will enhance labour productivity for Iskandar Malaysia (IM) construction projects. The vision of IM development…
Abstract
Purpose
The purpose of this paper is to develop a motivation framework that will enhance labour productivity for Iskandar Malaysia (IM) construction projects. The vision of IM development corridor is to become Southern Peninsular Malaysia’s most developed region by the year 2025. IM cannot realise this foresight without effective labour productivity. Previous studies have reported that the labour productivity of IM construction projects was six times lower than the labour productivity of Singapore construction projects, due to lack of motivation among IM labourers, and a shortage of local skilled labour. Therefore, there is a need to study how to motivate IM construction labourers, so as to increase their productivity.
Design/methodology/approach
A quantitative research method was used to collect data from IM construction skilled labourers and construction professionals, using two sets of questionnaire. The respondents were selected using a purposive sampling technique. In total, 40 skilled labourers and 50 construction professionals responded to the questionnaire survey, and the data were analysed using Statistical Package for Social Science software (version 22).
Findings
The analysis revealed the major factors that motivate labourers participating in IM construction projects. The factors were ranked hierarchically using Relative Importance Index (RII) and the outcome of the ranking indicated that effective management, viable construction practices, financial incentives, continuous training and development, and safe working environment were the most significant motivation strategies that positively influence IM construction labourers.
Originality/value
The study developed and validated a framework that can be used to boost the morale of IM construction labourers, so that their productivity can be increased. Implementation of the established motivation framework will also lead to career progression of IM construction labourers, based on the training elements in the framework. This career prospect will attract local skilled labourers to participate in IM construction projects.
Details
Keywords
Chukwuka Christian Ohueri, San Chuin Liew, Jibril Adewale Bamgbade and Wallace Imoudu Enegbuma
The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to…
Abstract
Purpose
The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to significantly enhance multidiscipline team collaboration. However, the practical execution of green BIM is characterized by issues such as duplication of work, information silos and poor cross-party coordination. Besides, there are limited studies on the specific components that are critical to driving green BIM collaborative design. This study aims to establish the critical components of green BIM collaborative design to enable the multidiscipline team to effectively use diverse software to collaboratively exchange accurate information, thus ensuring informed decision-making in the sustainable building design process.
Design/methodology/approach
Data were obtained by using a questionnaire to survey 360 respondents comprising mainly architects and engineers (civil, mechanical and electrical) in Malaysia. Subsequently, data were analyzed via confirmatory factor analysis. Afterward, a measurement model was established and used to test the 11 hypotheses of this study.
Findings
A covariance-based structural equation model of the critical components for successful BIM-based sustainable building design collaboration was established.
Practical implications
The research findings will guide the multidisciplinary team to collaboratively exchange accurate information in green BIM practices.
Originality/value
To the best of the authors’ knowledge, this research is the first attempt in the literature to provide a pragmatic approach for practitioners to combine the established critical components of green BIM to collaboratively exchange heterogeneous sustainability criteria and efficiently design buildings with high sustainability performance, particularly in emerging countries like Malaysia.