Mazed Parvez, Nazmus Sadat, Farhana Tasnim and Israt Jahan Nejhum
Pabna is suffering from waterlogging problems from ancient times. The previous Drainage Master Plan was failed due to the lack of reflection of the general people of Pabna…
Abstract
Purpose
Pabna is suffering from waterlogging problems from ancient times. The previous Drainage Master Plan was failed due to the lack of reflection of the general people of Pabna Municipality. As a result, this study focuses on identifying the causes of waterlogging in people's eyes. This paper will help the local authority and planners eradicate the waterlogging problem and build a planned and resilient community.
Design/methodology/approach
Both primary and secondary data were used for the study. Present drainage pattern, topology climatic elements were collected from the journals, websites and Municipal Ingratiated Development Plan (MIDP), Pabna-2008. The sample size was 246, and this respondent was surveyed. By the survey, the people's perception of waterlogging was collected. For that, five independent variables and one dependent variable were determined. These variables were determined by previous studies, reconnaissance survey of the study area. It used multiple linear regression and the correlation method; the causes of waterlogging were determined.
Findings
The study found solid waste disposal into the drainage, absence of operation and maintenance system, small discharge capacity with blocked in the current drains, nonappearance of combined drainage network of roadside drains and unplanned drainage system as the leading causes of waterlogging from the perception of the people. Also found that the absence of operation and maintenance system, solid waste disposal into the drainage and unplanned drainage system as the influencing causes on small discharge capacity with blocked in the current drains.
Originality/value
This study has focused on people's perceptions rather than secondary data. That is why this study will significantly impact eradicating the waterlogging problem from the Pabna Municipality and will carry out the core problems without any bias. This will lead to a sustainable, planned and resilient community.