Search results

1 – 5 of 5
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 30 August 2022

Mohammad A. Hassanain and Mohammed S. Mahroos

This research presents a review and assessment of the factors affecting the implementation of remodeling projects, during their lifecycle.

203

Abstract

Purpose

This research presents a review and assessment of the factors affecting the implementation of remodeling projects, during their lifecycle.

Design/methodology/approach

A mixed design approach comprising of qualitative and quantitative methods was utilized. The research commenced with a literature review to identify the factors affecting remodeling projects over their lifecycle phases, namely re-programing, design, construction, and operation and maintenance. A survey was administered, to solicit experts' evaluation of importance, on a sample of 90 professionals, including 30 architects, 30 contractors and 30 real estate developers, to obtain a diversified assessment of the factors. Based on the values of their relative importance indices, a set of 27 factors were ranked and correlated, among all areas, to expose the differentiation of their views.

Findings

The research has empirically determined that data availability of the remodeling project, contractor competency for carrying out the remodeling project, and safety during the disassembly and demolition (D&D) activities are the most important lifecycle factors leading to a successful delivery of the remodeling projects. These factors provide a practical guide for professionals endeavoring on delivering a successful and effective remodeling of built facilities.

Originality/value

This research explores professional practice in comparison to the literature and the legislative discourses, to ensure an effective delivery of remodeling projects over their lifecycle. This research provides practitioners, and regulators with a lacked area of research, while introducing a thorough investigation upon the factors affecting remodeling projects, their importance and ranking, from a project's lifecycle perception.

Details

Property Management, vol. 41 no. 1
Type: Research Article
ISSN: 0263-7472

Keywords

Access Restricted. View access options
Article
Publication date: 28 February 2023

Mohammad A. Hassanain and Mohammed S. Mahroos

Post-occupancy evaluation (POE) of office buildings, accommodating large number of users, is significantly demanded, to ascertain the provision and upkeep of users' requirements…

223

Abstract

Purpose

Post-occupancy evaluation (POE) of office buildings, accommodating large number of users, is significantly demanded, to ascertain the provision and upkeep of users' requirements. This paper presents the findings of a POE of an office building located in Saudi Arabia, as a case study.

Design/methodology/approach

A mixed approach of qualitative and quantitative research activities were conducted to achieve the objective of this study. Previous studies were analyzed to identify 28 performance indicators, grouped under seven technical and functional performance elements in office buildings. A walkthrough served to gain familiarity with the building, and identify the obvious performance defects. Interviews were conducted to solicit the users' perceptions about the performance elements, and initiate discussions based on the findings of the walkthrough. A user satisfaction survey was then deployed to quantify the user's feedback on the performance of the building.

Findings

Users of the case study office building were generally satisfied with all the technical performance elements, except visual comfort. They were also dissatisfied with two functional performance elements, namely office layout and building equipment.

Practical implications

Recommendations were developed to improve the performance of the case study building. The approach followed and the defined indicators can be of practical value to design professionals, administrators and facilities managers, responsible for the design and operation of office buildings.

Originality/value

Office buildings are valuable business capital for their corporate organizations. This study contributes to the facilities management literature, through providing a systematic approach for the quality and performance appraisal of the performance elements of office buildings.

Details

Property Management, vol. 41 no. 4
Type: Research Article
ISSN: 0263-7472

Keywords

Access Restricted. View access options
Article
Publication date: 9 October 2023

Mohammad A. Hassanain, Mahmoud A. Zourob and Ahmed M. Ibrahim

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of…

327

Abstract

Purpose

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of facilities managers and consultants’ practices.

Design/methodology/approach

A literature review was undertaken to determine the different tasks that facilities managers typically handle, identify project phases and their underlying activities in which facilities managers would be involved. This was followed by targeting a group of consultants to build a consensus, upon the identified involvement of facilities managers, over the PLP, while measuring the level of involvement from a representative group of facilities managers in Saudi Arabia. A matching between the perceptions and practice has been performed to serve as recommendations for future research on improving the practice in Saudi Arabia.

Findings

The involvement of facilities managers in the PLP is relatively low, according to the consultants’ perceptions. Consultants perceive that facilities managers should be involved in more professional activities, which would ultimately improve projects’ delivery to clients.

Practical implications

The involvement of facilities managers over the PLP ensures effective delivery of projects and reduces the multiplicity of challenges at the operation and maintenance phase. The viewing of facility managers’ involvement adds to the effectiveness of their role within the building industry.

Originality/value

This paper investigates the consultants’ perception of the involvement venues for facility managers to perform activities which are evaluated to be “mandatory,” “advantageous” or “not necessary.” The study reflects the state of facilities management practice, and the consensus of consultants toward the role of the facility managers through the PLP.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Access Restricted. View access options
Article
Publication date: 20 May 2024

Mohammad A. Hassanain, Turky Suliman Almhbash, Mohammad Sharif Zami, Ahmed M. Ibrahim and Adel Alshibani

This paper aims to review and assess the sustainable design and management considerations affecting workplaces’ productivity in Saudi Arabia.

215

Abstract

Purpose

This paper aims to review and assess the sustainable design and management considerations affecting workplaces’ productivity in Saudi Arabia.

Design/methodology/approach

The study uses a mixed approach, commencing with literature review, development and pilot-testing of a structured questionnaire instrument to assess design and management considerations towards productively sustainable workplaces (PSWs). In total, 31 considerations affecting sustainable workplaces’ productivity were identified and clustered under five main directions. A collective group of stakeholders, including architects/engineers (A/E), workplace users and facilities managers, were approached to correlate and compare their individual assessment of the identified PSWs. The relative importance index (RII) for each of the PSW considerations is correlated and discussed.

Findings

A high level of agreement is recognized among the three stakeholder groups for PSWs considerations’ assessed rankings. The provision of sufficient ventilation and illumination levels, availability of occupational health, security and safety, availability of ergonomically oriented technological infrastructure, availability of formal and informal meeting spaces, efficient space utilization and ergonomic workstations are all ranked highest in importance as design considerations towards PSWs.

Originality/value

The study stems from the need to understand how the PSWs’ design and management considerations are perceived by all streams of stakeholders. The findings identify the considerations’ importance for prioritization on PSWs’ investments.

Details

Journal of Corporate Real Estate , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-001X

Keywords

Access Restricted. View access options
Article
Publication date: 13 June 2023

Oliver Tannor, Williams Miller Appau and Elvis Attakora-Amaniampong

The purpose of this study is to explore user satisfaction with in-house facility management (FM) services in multi-tenanted office buildings in Accra, Ghana using a post-occupancy…

242

Abstract

Purpose

The purpose of this study is to explore user satisfaction with in-house facility management (FM) services in multi-tenanted office buildings in Accra, Ghana using a post-occupancy evaluation (POE) approach.

Design/methodology/approach

The study assessed user satisfaction with FM service quality by using a POE of their perceptions about the attitude and courtesy of the FM personnel, the reliability of the FM services they provide, the responsiveness and the competence of the service providers. The study used walk-throughs and questionnaire surveys as the POE methods. One hundred and twenty-one users from 22 multi-tenanted office buildings, who have actively used the FM services for at least a year, were purposively sampled. The data was collected via a survey using a structured questionnaire. The data was analysed using descriptive statistics and principal component analysis in version 25 of statistical package for the social sciences.

Findings

The study revealed that users were dissatisfied with the quality of in-house FM services across all 15 services The results also showed that users’ satisfaction with the services is not affected by the differences in their age, gender, educational level, job role and number of years in the buildings. The results further demonstrated that the most critical factors that resulted in users’ dissatisfaction were electric facilities, building fabric maintenance, emergency coordination, waste management and the decoration of the buildings during festive seasons.

Originality/value

To the best of the authors’ knowledge, the present study based on POE to assess user satisfaction with FM services for multi-tenant office buildings has, presumably, not been tackled before in Ghana. The results of the study are very essential to the owners of the buildings and facility managers in decision-making concerning the delivery of FM services. Building industry-wise, the results demonstrate the need for in-house FM managers in multi-tenanted office buildings in Ghana to adopt FM service delivery methods that increase user satisfaction. The results also call for further research into user satisfaction with outsourced FM services in multi-tenanted office buildings and further research on the use of the in-house strategy on other types of buildings to ascertain whether the dissatisfaction with FM is due to other factors such as the choice of FM strategy, the property type etc.

Details

Facilities , vol. 41 no. 13/14
Type: Research Article
ISSN: 0263-2772

Keywords

1 – 5 of 5
Per page
102050