Search results

1 – 2 of 2
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 25 January 2024

Mohammad Mehrabioun Mohammadi

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed…

337

Abstract

Purpose

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed to mitigate the challenges related to recruiting PAR in managing innovation projects. The proposed methodology was evaluated by comparing it to established methodologies/frameworks such as Scrum, Design Thinking (DT) and The Lean Startup (TLS). The evaluation aimed to determine the advantages and limitations of the proposed methodology in managing innovation projects.

Design/methodology/approach

The proposed enhanced methodology consists of eight steps, ranging from developing an understanding of the industry and business structure to learning and knowledge management. In addition, the enhanced methodology uses other techniques, such as Force field analysis and 12 boundary questions.

Findings

The research findings indicate that using the proposed methodology can improve the formalization of collaboration in PAR, enabling the organization to respond better to market changes. It helps define the project scope more clearly, encouraging innovation, addressing communication barriers and considering different worldviews and practical issues. Based on the findings, the proposed enhanced methodology could complement other methodologies/frameworks such as Scrum, DT and TLS.

Research limitations/implications

The current research adds to the existing literature by identifying the challenges of recruiting PAR in managing innovation projects. A deductive reasoning process was utilized because there is no comprehensive research concerning the challenges of recruiting PAR in managing innovation projects. On the other hand, the PAR 4-phase cycle has been reviewed and enhanced to manage innovation projects.

Practical implications

The proposed methodology was used in a new product development project. The case study was done on one of the payment service provider companies that design, develop and deploy a digital product for marketing, installation, repair and maintenance of electronic funds transfer at point of sale devices.

Originality/value

No research has yet sought to identify the challenges of using PAR in innovation project management (IPM). Identifying the challenges associated with applying PAR in the IPM and providing an enhanced methodology to mitigate the challenges could fill a gap in IPM studies.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Access Restricted. View access options
Article
Publication date: 12 April 2021

Mohammad Mehrabioun Mohammadi, Ali Jalali and Arezoo Hasani

This manuscript concentrates on addressing the success and failure factors to satisfy the small- and medium-sized enterprises (SMEs) need when facing challenges during the…

1423

Abstract

Purpose

This manuscript concentrates on addressing the success and failure factors to satisfy the small- and medium-sized enterprises (SMEs) need when facing challenges during the implementation of the quality management systems (QMSs) such as lack of both the financial and human resources and inadequate technical knowledge of quality management and employee indifference.

Design/methodology/approach

This research employs a mixed-method research approach in three different steps. First, based on interviews and a review of previous research, a list of critical factors influencing the success and failure of QMS implementation in SMEs is provided. After conducting the interview and extracting the results, a quantitative questionnaire is recruited as a complementary tool to demonstrate the accuracy of the literature review and interview findings and to increase the validity and reliability of the data. By applying the exploratory factor analysis (EFA) method, the factors affecting the failure and success of QMS implementation are identified separately. In the third step, a focus group meeting is used to name the factors and identify the relationships among them. The relationships among the factors are also shown using the concept map. Finally, after conducting the focus group meeting, several key issues have been extracted from practice and literature to realize the critical success and failure factors.

Findings

The current study reveals that the factors supporting the SMEs during the implementation of the QMSs may be classified into nine groups. Of these, six factors are related to critical success factors (CSFs), and three factors are related to critical failure factors (CFFs).

Originality/value

There have been several studies developed and conducted to address the success factors supporting the QMSs in SMEs. However, the scope of these studies has only been set on either qualitative or quantitative approaches. Hence, the proposed method presented in this essay, which is, in turn, a new contribution, attempts to use a combined approach based on both the semistructured interviews and survey methods. The results of this study can be used as a reference by scholars and practitioners to identify the relevant issues of QMSs and their application in SMEs.

Details

International Journal of Quality & Reliability Management, vol. 39 no. 2
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 2 of 2
Per page
102050