Search results

1 – 2 of 2
Article
Publication date: 12 September 2023

Sangeetha Narayanasami, Michael Sammanasu Joseph and Satyanarayana Parayitam

This study aims to empirically examine the effect of employee commitment (EC) (affective, normative and continuance) and emotional intelligence (EI) on work engagement (WE…

Abstract

Purpose

This study aims to empirically examine the effect of employee commitment (EC) (affective, normative and continuance) and emotional intelligence (EI) on work engagement (WE) (vigor, dedication and absorption). Furthermore, the moderating effects of psychological capital (PsyCap) and EI on strengthening WE are investigated.

Design/methodology/approach

A carefully crafted survey instrument was developed, and data were collected from 511 employees working in the banking sector in southern India. First, the psychometric properties of the measures were checked. Second, the results were analyzed using Hayes’ PROCESS macros.

Findings

The results indicate EC and EI positively predict WE; EI moderates the relationship between EC and WE; and PsyCap (second moderator) moderates the relationship between EI (first moderator) and EC influencing WE.

Research limitations/implications

This study’s limitations include the common method and social desirability biases inherent in any social science research based on surveys. However, the authors have taken adequate care to minimize these limitations. In addition, this study has several implications for practicing managers interested in enhancing WE.

Originality/value

The three-way interaction between EC, EI and PsyCap, which is investigated in this study, represents an original and unique contribution to this study. To the best of the authors’ knowledge, previous researchers have not done the moderated-moderation, especially in the context of a developing country such as India. This research advances the growing literature on EC and WE. Implications for theory and practice are discussed.

Details

Journal of Asia Business Studies, vol. 18 no. 1
Type: Research Article
ISSN: 1558-7894

Keywords

Open Access
Article
Publication date: 31 July 2024

Aravindh Devandran, Felicita J. Davis and Michael Sammanasu Joseph

This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of…

1958

Abstract

Purpose

This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of risk owing to cost overruns. These overruns frequently lead to delays, incomplete work or other related challenges. Building delays are a prevalent problem in the building sector of developing nations. These delays prolong the duration of projects and result in increased costs and conflicts among stakeholders. A conceptual model consisting of the factors causing the delays in heating, ventilation and air conditioning (HVAC) projects was developed and tested in this study.

Design/methodology/approach

A comprehensive data collection process was undertaken. A meticulously designed survey was distributed to a diverse cohort of 294 participants, including contractors and sub-contractors from Chennai, Tamil Nadu. The data was collected using stratified sampling, ensuring a representative sample. The data was then analysed using ordinary least squares multiple regression.

Findings

The findings of this study have significant implications for the construction industry. They indicate that factors related to sales, clients, design, procurement, finance and labour all contribute to delays in HVAC projects. Understanding these factors can help stakeholders in the industry to better manage and mitigate project delays.

Originality/value

This study is unique because it is a perceptual study of stakeholders. It provides valuable information for analysing and assessing project performance by identifying the primary causes of HVAC project delays. To the best of the authors’ knowledge, the study conducted on HVAC projects is the first of its kind and hence makes a pivotal contribution to the literature on construction projects. Additionally, the study will assist policymakers and consultants in taking necessary steps to minimize delays.

Details

Vilakshan - XIMB Journal of Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0973-1954