Michael Ayodele Olukolajo, Abiodun Kolawole Oyetunji and Ifeoluwa Benjamin Oluleye
This paper aims to investigate construction site workers’ compliance with various coronavirus (Covid-19) protocols while working on construction sites.
Abstract
Purpose
This paper aims to investigate construction site workers’ compliance with various coronavirus (Covid-19) protocols while working on construction sites.
Design/methodology/approach
This survey was conducted at the end of the imposed lockdown following Nigeria’s upsurge of the Covid-19 pandemic. The survey research method was adopted for the study using a structured questionnaire administered to 246 construction site workers under strict Covid-19 preventive measures. The data was complemented through personal observations of the study site activities. The results were analysed using frequency tables and a factor analytical approach.
Findings
The preventive measures in place on construction sites can be classified into personal protective measures, good etiquette/manners, contact precautions and prompt actions. Although the workers claimed to be aware of the Covid-19 pandemic, their disposition towards the preventive measures on construction sites is worrisome. Hence, their level of compliance with the protocols could mitigate the spread of the virus.
Originality/value
This paper fulfils an identified gap to study the need to promote public health by mitigating the global pandemic’s spread in areas where social distancing cannot be easily observed.
Details
Keywords
Ifeoluwa Benjamin Oluleye, Abiodun Kolawole Oyetunji, Michael Ayodele Olukolajo and Daniel W.M. Chan
Building information modelling (BIM) is a novel technological advancement in the built environment. Despite the potentials of BIM, its adoption and implementation are undermined…
Abstract
Purpose
Building information modelling (BIM) is a novel technological advancement in the built environment. Despite the potentials of BIM, its adoption and implementation are undermined in facility management (FM) operations. This might be because of limited information on the critical success factors (CSFs) that can enhance its adoption. The study aims to integrate building information modelling to improve facility management operation by adopting fuzzy synthetic approach for evaluating the critical success factors.
Design/methodology/approach
Data for the study were sourced from practising and registered facility managers within Lagos metropolis, Nigeria. The data collected were analysed using a combination of methods which include mean item score, factor analysis and fuzzy synthetic evaluation (FSE).
Findings
The factor analysis results showed that six underlying groups of CSFs would enhance the effective adoption of BIM in facility operations. The FSE results showed that out of the six groups, the three topmost important CSF grouping (CSFG) in the decision rule would enhance the effectiveness of BIM adoption for FM operations.
Practical implications
The result of this study provides a credible road map for facility managers, policymakers and other stakeholders in FM operations on the CSFs and CSFG required for the adoption of BIM.
Originality/value
Previous studies that aimed at integrating BIM into FM are limited. Hence, this study provides a broad perspective on the CSF required for BIM adoption and implementation in FM operations using the FSE approach.