Search results
1 – 2 of 2Somayeh Tajik, Kevan Jacobson, Sam Talaei, Hamed Kord-Varkaneh, Zeinab Noormohammadi, Ammar Salehi-Sahlabadi, Mehran Pezeshki, Jamal Rahmani and Azita Hekmatdoost
The results of human studies evaluating the efficacy of plant Phytosterols on liver function were inconsistent. Therefore, the purpose of this paper is to eliminate these…
Abstract
Purpose
The results of human studies evaluating the efficacy of plant Phytosterols on liver function were inconsistent. Therefore, the purpose of this paper is to eliminate these controversies about the Phytosterols consumption on liver serum biochemistry in adult subjects.
Design/methodology/approach
The literatures systematically searched throughout PubMed and Scopus databases up to June 2018; it was conducted by using related keywords. Estimates of effect sizes were expressed based on weighted mean difference (WMD) and 95% CI from the random-effects model (erSimonian and Laird method). Heterogeneity across studies was assessed by using I2 index. Eighteen studies reported the effects of Phytosterols (PS) supplementation on liver serum biochemistry.
Findings
The current meta-analysis did not show a significant effect on ALT (MD: 0.165 U/L, 95% CI: −1.25, 1.58, p = 0.820), AST (MD: −0.375 IU/Liter, 95% CI: −1.362, 0.612, p = 0.457), ALP (MD: 0.804 cm, 95% CI: −1.757, 3.366, p = 0.538), GGT (MD: 0.431 U/L, 95% CI: −1.803, 2.665, p = 0.706) and LDH (MD: 0.619 U/L, 95% CI: −4.040, 5.277, p = 0.795) following PS consumption.
Originality/value
The authors found that no protective or toxic effects occur after the consumption of Phytosterols on liver enzymes including ALT, AST, ALP, LDH and GGT.
Details
Keywords
Shihunegn Alemayehu, Ali Nejat, Tewodros Ghebrab and Souparno Ghosh
Building information modeling (BIM) is a process of creating an intelligent virtual model integrating project data from design to construction and operation. BIM models enhance…
Abstract
Purpose
Building information modeling (BIM) is a process of creating an intelligent virtual model integrating project data from design to construction and operation. BIM models enhance the process of communicating the progress of construction to stakeholders and facilitate integrated project delivery, coordination and clash detection. However, barriers within the construction industry in Ethiopia has led to slow BIM adoption in the country. The aim of this paper is to identify perceived BIM barriers, provide a platform to quantify their importance and develop a regression model to link individual's personal/professional attributes to their perception of BIM barrier.
Design/methodology/approach
To address the objectives of this research, an online survey was developed to collect feedback from construction professionals in Ethiopia on 20 major adoption barriers extracted from a thorough review of literature. Relative importance index and strength of consensus metric were employed to identify the significance of barriers. This was then succeeded by performing exploratory factor analysis to determine the major constructs of BIM barriers which was then used to develop a multivariate regression model linking respondents' personal attributes to their perception of BIM barrier.
Findings
Results revealed the importance of project complexity and BIM maturity level in prioritizing barriers that are more relevant under various contexts. More specifically, results indicated the following study highlights: Project complexity led to higher perceived weights for lack of appropriate physical/cloud infrastructures, and a BIM standard. Higher levels of BIM maturity signified the importance of BIM internal issues such as liability, licensing and maintenance issues among other adoption barriers. Female participants tended not to consider intangibility of BIM benefits as a major barrier towards BIM adoption compared to male participants. Age of the participants turned out to be the least important factor in their prioritization of BIM perceived adoption barriers.
Originality/value
While many research studies have explored BIM adoption barriers in various countries around the world, none to the best of the authors' knowledge have attempted to develop a model to highlight the impact of individuals' personal/professional attributes on their perception of adoption barriers within their community which can help with prioritizing the barriers that are deemed to be more important given the characteristics of the community under study. Our result indicated the importance of BIM maturity level and project complexity in prioritizing barriers associated with BIM adoption within Ethiopia's construction industry.