The quantity of e-taxi in Bangladesh is increasing day by day, especially in the municipality area. With the increase of this e-taxi quantity, it becomes hard to provide parking…
Abstract
Purpose
The quantity of e-taxi in Bangladesh is increasing day by day, especially in the municipality area. With the increase of this e-taxi quantity, it becomes hard to provide parking space for these consequences the illegal parking on road. This parking consequences traffic congestion on the road and obstructs the free flow of traffic. So, this paper aims to investigate the present scenario of this e-taxi parking problem and provides a solution by finding out a suitable location for an e-taxi station by the analytic hierarchy process (AHP) approach.
Design/methodology/approach
For the study, both primary and secondary data were collected. Primary data on existing parking points on the road of e-taxi which consequences traffic congestion are collected from the Municipality area. Secondary data on the existing road network of the Pabna Municipality has collected from the MIDP data also from the literature review. For the suitability analysis process for establishing an e-taxi station, six variables were determined. These variables are determined from the previous studies and the expert opinion survey. The six variables are land use of the study area, road network of the study area, proximity to the office area, proximity to the educational facilities, proximity from the market and finally,proximity from the hospital. After the selection of the variables ranking value was determined from the expert opinion. Then using The AHP method final weight value is determined and, finally, with the assist of geographical information system.
Findings
From the resulting total 4,285 spots were found as optimally suitable spots are found which is almost 21% of the suitable spot. No mostly suitable spots are found from the GIS analysis. The moderately suitable spots were found in the prime number of 14,817 spots, almost 75% of the suitable spot. Likely the most suitable spots no partly suitable spots were found but the number of very few suitable spots was found in the number of 918, 4% of the suitable spot. A total of 20,020 spots was found as suitable for the construction of E-taxi station.
Originality/value
Finding out a suitable spot for e-taxi stand the traffic congestion can be solved, accident risk can be minimized during loading and unloading of passengers and the municipality authority can find a permanent solution for the traffic congestion problem.
Details
Keywords
Mazed Parvez, Nazmus Sadat, Farhana Tasnim and Israt Jahan Nejhum
Pabna is suffering from waterlogging problems from ancient times. The previous Drainage Master Plan was failed due to the lack of reflection of the general people of Pabna…
Abstract
Purpose
Pabna is suffering from waterlogging problems from ancient times. The previous Drainage Master Plan was failed due to the lack of reflection of the general people of Pabna Municipality. As a result, this study focuses on identifying the causes of waterlogging in people's eyes. This paper will help the local authority and planners eradicate the waterlogging problem and build a planned and resilient community.
Design/methodology/approach
Both primary and secondary data were used for the study. Present drainage pattern, topology climatic elements were collected from the journals, websites and Municipal Ingratiated Development Plan (MIDP), Pabna-2008. The sample size was 246, and this respondent was surveyed. By the survey, the people's perception of waterlogging was collected. For that, five independent variables and one dependent variable were determined. These variables were determined by previous studies, reconnaissance survey of the study area. It used multiple linear regression and the correlation method; the causes of waterlogging were determined.
Findings
The study found solid waste disposal into the drainage, absence of operation and maintenance system, small discharge capacity with blocked in the current drains, nonappearance of combined drainage network of roadside drains and unplanned drainage system as the leading causes of waterlogging from the perception of the people. Also found that the absence of operation and maintenance system, solid waste disposal into the drainage and unplanned drainage system as the influencing causes on small discharge capacity with blocked in the current drains.
Originality/value
This study has focused on people's perceptions rather than secondary data. That is why this study will significantly impact eradicating the waterlogging problem from the Pabna Municipality and will carry out the core problems without any bias. This will lead to a sustainable, planned and resilient community.
Details
Keywords
The purpose of this paper is to find out the causes of increasing population in the real estate area. The demographic in information of the respondents and the level of…
Abstract
Purpose
The purpose of this paper is to find out the causes of increasing population in the real estate area. The demographic in information of the respondents and the level of satisfaction was also carried out for this study.
Design/methodology/approach
The authors use both primary and secondary data. Total 329 respondents were surveyed at the real estate area after completing sample size determination. Secondary data was collected from journals, real estate offices and papers. After that, using regression and correlation analysis, the data was analyzed and finalized.
Findings
This study identified migration as the most critical variable. The study determined ten hypotheses and only accepted two. By that, this study finds out the causes of the increasing demand of plots and flats in real estate.
Originality/value
This study will work as a baseline study for the real estate sector in Bangladesh. Most of the research on Bangladesh’s real estate is done mainly on real estate market assessment and consumer satisfaction. Nevertheless, this study will find out the causes of the increasing population in real estate.