Publication date: 3 March 2021

Anna Fredriksson, Mats Janné and Martin Rudberg

The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and…

3104

Abstract

Purpose

The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and management dimensions are related in CLSs by describing how CTPL setups are used.

Design/methodology/approach

Ten dimensions to describe and structure CLSs were identified from the literature and used to structure a cross-case analysis of 13 Swedish CLSs.

Findings

The main findings are: (1) there are three typical initiators of CLSs: municipalities, developers and contractors; (2) CLSs are drivers for service differentiation and modularization among TPL providers as construction specific services are required; (3) CLSs play a new role in construction by coordinating logistics activities between the construction project and the vicinity of the site.

Research limitations/implications

The study is based on 13 cases in the Swedish construction context. Additional studies of CLSs in other countries are needed.

Practical implications

The ten dimensions can be used as a guide in designing a CLS and in determining the order of design decisions. The identification and structuring of CTPL services also exemplify the variety of service offerings.

Originality/value

This is one of the first cross-case analyses of CLSs enabling the characterization of CTPL setups. This study identifies how different services included in the setup relate to the roles of SCM and logistics in construction.

Details

International Journal of Physical Distribution & Logistics Management, vol. 51 no. 4
Type: Research Article
ISSN: 0960-0035

Keywords

Available. Open Access. Open Access
Article
Publication date: 21 September 2021

Mats Janné and Anna Fredriksson

The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and…

3691

Abstract

Purpose

The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and challenges of CLC utilization.

Design/methodology/approach

Adopting an activity-based cost methodology, nine construction projects' CLC utilization in a Swedish urban development project is analyzed for a time period of three years (2013–2016).

Findings

There is a difference between drivers and challenges for implementing and utilizing CLCs, which are often implemented to reduce third-party disturbances. The drivers to utilize a CLC, however, stem from achieving efficient logistics. The authors identify two different utilization strategies; the CLC is used either for just-in-time (JIT) deliveries or as a consolidation point.

Research limitations/implications

The study shows that construction logistics is to some extent repeating some mistakes of its big brother, city logistics. The study hypothesizes that there are differences between CLC implementation and utilization drivers and challenges that are often overlooked, which can explain the lack of CLC utilization.

Practical implications

The study shows that it is crucial for construction projects to develop and formulate a logistics strategy for how to utilize the setup, i.e. deciding whether to use the setup as a consolidation point leading to fewer deliveries and more materials on-site, or as JIT, leading to more deliveries but fewer materials on-site.

Social implications

CLCs can reduce environmental impact and third-party disturbances. However, to make this come true, acceptance among the users is needed. The study provides understanding of drivers and barriers for CLC implementation and utilization that can increase acceptance among users (i.e. construction projects).

Originality/value

The current study is one of the first studies to analyze CLC utilization.

Details

The International Journal of Logistics Management, vol. 33 no. 5
Type: Research Article
ISSN: 0957-4093

Keywords

Available. Open Access. Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1718

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Access Restricted. View access options
Article
Publication date: 12 February 2019

Mats Janné and Anna Fredriksson

Although a construction logistics solution is necessary for dealing with the demands in many large urban development projects, there is a lack of research on governance mechanisms…

1288

Abstract

Purpose

Although a construction logistics solution is necessary for dealing with the demands in many large urban development projects, there is a lack of research on governance mechanisms for construction logistics solutions. Therefore, the purpose of this paper is to analyse the initiation and utilisation of a construction logistics centre (CLC) from different stakeholders’ perspectives to suggest governance mechanisms for strategic, tactical and operational levels and to develop guidelines for implementing these governance mechanisms.

Design/methodology/approach

A single case research design was used. Data were collected through interviews, site visits, observations and documentation from four stakeholder groups.

Findings

There is potential for utilising CLCs in development projects, with positive effects such as consolidation effects and enhanced planning. What is evident, however, is that the design and implementation of the CLCs must be based on a comprehensive stakeholder analysis, as there are conflicting goals between stakeholders. Governance mechanisms, including flexibility in the main contractors’ working construction process, as well as clearly stated roles, responsibilities and communication must be developed to enhance this potential.

Research limitations/implications

The conflicting goals of CLCs are identified and discussed, and the results show the need for further multi-stakeholder analysis of construction logistics solutions.

Practical implications

The experiences from the studied case are developed into practical guidelines to be used in the design of construction logistics solutions in development projects.

Originality/value

This study contributes by taking a multi-stakeholder perspective on CLCs and providing guidelines to be used in the design of construction logistics solutions in development projects.

Details

Construction Innovation, vol. 19 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Access Restricted. View access options
Article
Publication date: 1 April 2003

Georgios I. Zekos

Aim of the present monograph is the economic analysis of the role of MNEs regarding globalisation and digital economy and in parallel there is a reference and examination of some…

101241

Abstract

Aim of the present monograph is the economic analysis of the role of MNEs regarding globalisation and digital economy and in parallel there is a reference and examination of some legal aspects concerning MNEs, cyberspace and e‐commerce as the means of expression of the digital economy. The whole effort of the author is focused on the examination of various aspects of MNEs and their impact upon globalisation and vice versa and how and if we are moving towards a global digital economy.

Details

Managerial Law, vol. 45 no. 1/2
Type: Research Article
ISSN: 0309-0558

Keywords

Available. Content available
Article
Publication date: 1 February 2006

Mustafa F. Özbilgin

984

Abstract

Details

Equal Opportunities International, vol. 25 no. 2
Type: Research Article
ISSN: 0261-0159

Access Restricted. View access options
Article
Publication date: 1 January 1995

Bert Chapman

The conclusion of the Cold War's U.S.‐Soviet superpower rivalry may have ended the threat of a global nuclear military confrontation involving these powers. It did not, however…

168

Abstract

The conclusion of the Cold War's U.S.‐Soviet superpower rivalry may have ended the threat of a global nuclear military confrontation involving these powers. It did not, however, result in the termination of international regional conflicts or of military threats to U.S. national security. The collapse of a world political and strategic system ostensibly polarized between two ideologically contrasting superpowers has resulted in the emergence of numerous threats to regional and global order.

Details

Reference Services Review, vol. 23 no. 1
Type: Research Article
ISSN: 0090-7324

Available. Open Access. Open Access
Article
Publication date: 22 February 2022

Solmaz Mansoori, Janne Harkonen and Harri Haapasalo

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization…

2673

Abstract

Purpose

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization concept and product structure (PS).

Design/methodology/approach

The study follows a conceptual research approach in conjunction with a single case study. First, the previous studies on BIM implementation, productization and PS are reviewed. Further, a case study is used to analyse the current state of productization in the construction sector and develop a functional PS for construction.

Findings

A Part-Phase-Elements Matrix is proposed as a construction-specific PS to facilitate consistency in information and to enhance BIM. The proposed matrix provides new avenues to facilitate consistent information exchange through the interconnection between conceptual PS and standard building objects library, and encourage collaborative communication between stakeholders.

Originality/value

This study explores the core of the productization concept and PS as means to facilitate consistency of information and thus address the current gaps in BIM. This as building projects progressively move towards systematic modular and prefabricated construction where the flow of reliable information about product and construction offerings becomes increasingly important.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Available. Content available
Article
Publication date: 6 February 2009

2187

Abstract

Details

International Journal of Operations & Production Management, vol. 29 no. 2
Type: Research Article
ISSN: 0144-3577

Access Restricted. View access options
Article
Publication date: 7 January 2019

Lara Agostini and Roberto Filippini

Currently, the expectancy that surrounds the Fourth Industrial Revolution, commonly referred to as Industry 4.0 (I4.0), is huge. In this context, the purpose of this paper is to…

6865

Abstract

Purpose

Currently, the expectancy that surrounds the Fourth Industrial Revolution, commonly referred to as Industry 4.0 (I4.0), is huge. In this context, the purpose of this paper is to unveil whether and how organizational and managerial practices are associated to different levels of adoption of I4.0 technologies.

Design/methodology/approach

To reach this aim, the authors carried out a survey involving Italian manufacturing firms. Then, the authors used a cluster analysis and t-test to analyze data.

Findings

Results show that two clusters of firms based on their level of adoption of I4.0 technologies (high vs low) can be identified. Then, using a t-test, the authors found statistically significant higher levels of a number of organizational and managerial practices for firms with a higher level of adoption of I4.0 technologies.

Practical implications

This paper contributes to the debate surrounding I4.0 by stressing the organizational and managerial challenges that firms willing to undertake an I4.0 transformation have to face, which goes beyond the sole application of I4.0 technologies.

Social implications

Entrepreneurs and managers need to be aware that the path toward I4.0 requires not only focusing on the application of the I4.0 technologies, but also on the development of a series of organizational and managerial practices that become key to face the fourth Industrial Revolution.

Originality/value

The authors posit here that I4.0 requires firms to bridge the capability gap, as well as overcome cultural barriers preventing entrepreneurs and managers to change their way of doing business. To this regard, this study highlights I4.0 is an all-encompassing paradigm that involves many dimensions of the firm.