1 – 10 of 11Mahmoud Ershadi, Marcus Jefferies, Peter Rex Davis and Mohammad Mojtahedi
The purpose of this study is twofold: first, to identify major project management (PM) complexities in principal construction contracting; and second, to study the contribution of…
Abstract
Purpose
The purpose of this study is twofold: first, to identify major project management (PM) complexities in principal construction contracting; and second, to study the contribution of project management offices (PMOs) to addressing such complexities.
Design/methodology/approach
A two-stage research design was adopted through a structured literature review (SLR) and a qualitative survey study.
Findings
The two-stage study resulted in mapping out the contribution of 10 functional areas to 15 complexity factors that were retrieved from the literature and categorized using the TOE (technical, organizational and environmental) framework. Six outcomes including (1) facilitated processes, (2) improved decisions, (3) improved coordination, (4) enhanced alignment, (5) addressed uncertainties and (6) integrated oversight were identified that describe how PMOs can contribute to tackling complexities.
Research limitations/implications
Similar to other qualitative studies, this study has some limitations in terms of the replicability of results. Regarding the exploratory nature of this study to explain the contribution of PMO to complexity, further quantitative surveys can be conducted using a larger sample to statistically examine the significance of proposed relations between capabilities and complexity factors.
Practical implications
This study provides an understanding of the contribution of PMOs to tackling ever-increasing complexities embedded in construction contracting. The authors suggest requirements to be considered by professionals toward overcoming such complexities.
Originality/value
Although prior studies have separately investigated PMO functions and PM complexities, this study explores the link between these two spheres to discuss one important application of PMO in this context.
Details
Keywords
Buddhini Ginigaddara, Mahmoud Ershadi, Marcus Jefferies and Srinath Perera
Recent research advocates that there are plenty of opportunities for key players in the offsite construction (OSC) sector to harness the full potential of advanced project…
Abstract
Purpose
Recent research advocates that there are plenty of opportunities for key players in the offsite construction (OSC) sector to harness the full potential of advanced project management techniques. While previous research mainly focuses on transformations related to digital and advanced technologies driven by industry 4.0 principles, a research gap still exists on the intersection of project management capabilities and OSC. This study attempts to bridge this gap by capturing the homogeneity of different capabilities and integrating them into an overarching framework.
Design/methodology/approach
A scientometric analysis is conducted to provide an overview of the co-occurrence network of keywords in the representative studies. A systematic literature review (SLR) of articles published between 2010 and 2022, followed by a subsequent full-text examination of 63 selected articles, revealed 34 interrelated capabilities to be categorised under three exhaustive planning-oriented, design-oriented and delivery-oriented groups.
Findings
This review revealed an upward trend of publication on project management capabilities for OSC with a specific interest in optimisation of resources allocated to offsite operations. The top five capabilities discussed more frequently in the literature include (1) artificial intelligence for design error detection, (2) enhanced resource productivity, (3) cost saving in offsite production, (4) real-time traceability of modules and (5) applying lean agile production principles to OSC, which imply the critical role of quality, cost saving, traceability and agility in OSC.
Originality/value
This study elicits core capabilities and develops a new offsite project management framework for the first time. The authors provide directions for researchers and practitioners to apply capabilities for obtaining better outcomes and higher value out of offsite operations.
Details
Keywords
Mahmoud Ershadi and Fredelino Lijauco
In this paper, a systematic review of 284 articles published between 2015 and 2022 and a full-text thematic analysis of 70 selected articles was conducted to catalog and…
Abstract
Purpose
In this paper, a systematic review of 284 articles published between 2015 and 2022 and a full-text thematic analysis of 70 selected articles was conducted to catalog and synthesize factors in a framework. Thematic analysis subsequently revealed 18 selective codes under three groups of drivers, barriers, and outcomes. These three groups were explained by four key aspects including organization, stakeholders, infrastructure, and business environment that set a framework for the digitalization of construction. The study finally concluded digitalization strategies with a focus on support mechanisms, government incentives, regulations, the transition from manual labor to technicians, organizational technology culture, methodology development, and innovation processes. Such strategies provide insight into prioritizing resources towards smooth digital transformation in construction businesses.
Design/methodology/approach
A two-stage methodology is adopted by undertaking a systematic literature review followed by thematic content analysis. This work concludes with an analysis of remaining research gaps and suggestions for potential future research.
Findings
In this paper, a systematic review of 284 articles published between 2015 and 2022 and a full-text thematic analysis of 70 selected articles was conducted to catalog and synthesize variables in a framework. Thematic analysis subsequently revealed a set of variables and factors describing construction digitalization under three groups of success factors, barriers, and outcomes. A critical content analysis of the representative studies was conducted to identify five future research trends as well as associated research gaps and directions on the topic.
Practical implications
This study contributes to practice by providing directions concerning the key strategies and priorities associated with the digitalization of construction businesses.
Originality/value
This ground-breaking research brings to light a classified set of factors that are important for the digitalization of construction businesses. The elicited framework contributes to the current body of knowledge by offering a unique conceptualization of both driving and adverse aspects for the seamless digital transformation of construction.
Details
Keywords
Fatemeh Goodarzi, Kavitha Palaniappan, Manikam Pillay and Mahmoud Ershadi
Exposure to poor indoor air in refurbished buildings is a matter of health concern due to the growing concentrations of various contaminants as a result of building airtightness…
Abstract
Purpose
Exposure to poor indoor air in refurbished buildings is a matter of health concern due to the growing concentrations of various contaminants as a result of building airtightness without amendment of ventilation, or the use of building materials such as glue, paint, thinner and varnishes. Recent studies have been conducted to measure indoor air pollutants and assess the health risks affecting the quality of life, productivity and well-being of human beings. However, limited review studies have been recently conducted to provide an overview of the state of knowledge. This study aims to conduct a scoping review of indoor air quality (IAQ) in the context of refurbished or energy-retrofitted buildings.
Design/methodology/approach
A systematic screening process based on the PRISMA protocol was followed to extract relevant articles. Web of Science, Scopus, Google Scholar and PubMed were searched using customised search formulas. Among 276 potentially relevant records, 38 studies were included in the final review covering a period from 2015 to 2022.
Findings
Researchers mapped out the measured compounds in the selected studies and found that carbon dioxide (CO2) (11%) and total volatile organic compounds (11%) were among the most commonly measured contaminants. Two trends of research were found including (1) the impact of ventilative properties on IAQ and (2) the impact of introducing building materials on IAQ.
Originality/value
The contribution of this study lies in summarising evidence on IAQ measurements in refurbished buildings, discussing recent advancements, revealing significant gaps and limitations, identifying the trends of research and drawing conclusions regarding future research directions on the topic.
Details
Keywords
Milad Ghanbari, Asaad Azeez Jaber Olaikhan and Martin Skitmore
This study aims to develop a framework for the optimal selection of construction project portfolios for a construction holding company. The objective is to minimize risks, align…
Abstract
Purpose
This study aims to develop a framework for the optimal selection of construction project portfolios for a construction holding company. The objective is to minimize risks, align the portfolio with the organization’s strategic objectives and maximize portfolio returns and net present value (NPV).
Design/methodology/approach
The study develops a multi-objective genetic algorithm approach to optimize the portfolio selection process. The construction company’s portfolio is categorized into four main classes: water projects, building projects, road projects and healthcare projects. A mathematical model is developed, and a genetic algorithm is implemented using MATLAB software. Data from a construction holding company in Iraq, including budget and candidate projects, are used as a case study.
Findings
The case study results show that out of the 34 candidate projects, 13 have been recommended for execution. These selected projects span different portfolio classes, such as water, building, road and healthcare projects. The total budget required for executing the selected projects is $64.55m, within the organization’s budget limit. The convergence diagram of the genetic algorithm indicates that the best solutions were achieved around generation 20 and further improved from generation 60 onwards.
Practical implications
The study introduces a specialized framework for project portfolio management in the construction industry, focusing on risk management and strategic alignment. It uses a multi-objective genetic algorithm and risk analysis to minimize risks, increase returns and improve portfolio performance. The case study validates its practical applicability.
Originality/value
This study contributes to project portfolio management by developing a framework specifically tailored for construction holding companies. Integrating a multi-objective genetic algorithm allows for a comprehensive optimization process, taking into account various objectives, including portfolio returns, NPV, risk reduction and strategic alignment. The case study application provides practical insights and validates the effectiveness of the proposed framework in a real-world setting.
Details
Keywords
Mohammad Javad Ershadi, Reza Edrisabadi and Aghileh Shakouri
Project management generally covers many important areas such as cost, quality and time in different industrial settings, but it is deficient in relation to integration of health…
Abstract
Purpose
Project management generally covers many important areas such as cost, quality and time in different industrial settings, but it is deficient in relation to integration of health, safety and environmental risks. Poor knowledge of project managers about HSE management necessitates the studying on the mutual effects of HSE and project management. Hence, investigating the impact of project management on health monitoring programs, safety prevention monitoring, environmental monitoring plans and finally the effectiveness of professional health monitoring programs and determining their importance are main objectives of this research. The paper aims to discuss these issues.
Design/methodology/approach
A model based on structural equations was designed and developed. The constructs of this model are project management, health monitoring and safety prevention monitoring program. Based on the conceptual model, some questionnaires were prepared and distributed among the experts of strategic project management.
Findings
The results of applied structural modeling suggest that project management focuses on each aspect of HSE management, including health monitoring programs, safety prevention monitoring programs, environmental monitoring plans and effectiveness of professional health monitoring programs. HSE management can also be strengthened by empowering project management. Checking fire protection systems, using appropriate techniques to identify contamination and disposal of waste and incorporating techniques for brainstorming or other ideas creation in the group are the most important tasks in HSE-enabled project management frameworks.
Originality/value
Since there is still no strategic alignment model that includes components of project management and HSE management, a model for achieving this goal is vital. This paper elaborates this alignment based on literature and using a field study.
Details
Keywords
Melvin C. Jose, Radha Sankararajan, Sreeja B.S. and Pratap Kumar
This paper aims to propose a laser micro-machined 4 × 4 elements microstrip array antenna suitable for 5 G millimeter wave (mm-wave) applications. Each patch element of the array…
Abstract
Purpose
This paper aims to propose a laser micro-machined 4 × 4 elements microstrip array antenna suitable for 5 G millimeter wave (mm-wave) applications. Each patch element of the array is excited with same amplitude and phase that is achieved with proper novel impedance matching stub. The proposed antenna achieves a simulated gain of 13.15 dBi and a measured return loss of −24.80 dB at 28.73 GHz with a total bandwidth of 7.48 GHz. The designed antenna is directional with a directivity of 15.1 dBi at 28.73 GHz, whereas fabricated on a low cost FR4 substrate with a substrate thickness of 0.074 λ mm. The antenna is realized with an aperture size of 2.24λ × 3.26λ.
Design/methodology/approach
The antenna structure starts from the design of single element called unit cell. The single element is designed using the transmission line model equations of a rectangular patch. To design a 28 GHz microstrip patch antenna, a dielectric material with lower permittivity and having thickness (h) less than 1 mm is required. This specification gives better gain and efficiency by reducing surface waves and mutual coupling between elements. The inset width is optimized to achieve the minimum reflection coefficient (S11). The single element has been arranged with a minimum spacing of λ/2 (5.3571 mm) in an H plane and E plane. It is connected using the microstrip lines with proper impedance matching. The four 2 × 2-sub array cell subsystems are connected with a corporate feed together formed the 4 × 4-array cell. Rectangular planar array method is used to arrange the elements in the 4 × 4 array cell.
Findings
The design concept is simple which includes the combination of corporate feed and insect feed. It is compact in size and easy to fabricate. The bandwidth of fabricated prototype antenna array is achieved as 7.48 GHz from 24.98 GHz to 32.46 GHz. The mutual coupling is very less though the antenna array is placed with minimum spacing between adjacent elements. This is because of the microstrip feeding structure with minimum phase shift. The gain can be further enhanced with increasing number of array element and proper designing of feed line. Owing to the advantages of low profile, wide bandwidth and high gain, the designed array will be potentially useful in 5 G wireless communications.
Originality/value
The measured antenna offers bandwidth 7.48 GHz (24.98 GHz-32.46 GHz) with centered frequency 28.73 GHz. The agreement between simulated and measured results is good. The VSWR is observed 0.32 < 2, offers good impedance matching and low mutual coupling. It gives better E-Field and H-field radiation patterns of the 4 × 4 array antenna structure at 28 GHz. The total gain of 13.14 dBi is achieved at the center frequency. The total efficiency of 63.42 per cent is achieved with FR4 substrate.
Details
Keywords
Williams Miller Appau, Elvis Attakora-Amaniampong and Iruka Chijindu Anugwo
To significantly adopt and improve indoor energy efficiency in building infrastructure in developing countries can be a challenging venture. Thus, this study aimed to assess the…
Abstract
Purpose
To significantly adopt and improve indoor energy efficiency in building infrastructure in developing countries can be a challenging venture. Thus, this study aimed to assess the satisfaction of indoor environmental quality and its effect on energy use intensity and efficient among student housing.
Design/methodology/approach
The study is quantitative and hinged on the contrast theory. A survey of 1,078 student residents living in purpose-built student housing was contacted. Using Post-Occupancy Evaluation and Multiple Linear Regression, critical variables such as thermal comfort, visual comfort and indoor air quality and 21 indicators were assessed. Data on annual energy consumption and total square metre of the indoor area were utilised to assess energy use intensity.
Findings
The study found a direct relationship between satisfaction with indoor environmental quality and energy use intensity. The study showed that students were more satisfied with thermal comfort conditions than visual and indoor air quality. Overall, these indicators contributed to 75.9% kWh/m2 minimum and 43.2% kWh/m2 maximum energy use intensity in student housing in Ghana. High occupancy and small useable space in student housing resulted in high energy use intensity.
Practical implications
Inclusions of sustainable designs and installation of smart mechanical systems are feedback to student housing designers. Again, adaptation to retrofitting ideas can facilitate energy efficiency in the current state of student housing in Ghana.
Originality/value
Earlier studies have argued for and against the satisfaction of indoor environmental quality in student housing. However, these studies have neglected to examine the impact on energy use intensity. This is novel because the assessment of energy use intensity in this study has a positive influence on active design incorporation among student housing.
Details
Keywords
Hugo Valdes, Christian Correa, Cristian Suarez, Luis Alberto Laurens Arredondo, Mariela Faviola Hurtado Espinosa, Ismael L. Vera-Puerto, Myrna Zagal and Carlos A. Arias
Develop a conceptual model for the training of Chilean engineers in the construction field that considers the facultative symbiosis between sustainable construction (SC) and…
Abstract
Purpose
Develop a conceptual model for the training of Chilean engineers in the construction field that considers the facultative symbiosis between sustainable construction (SC) and nature-based solutions (NBS).
Design/methodology/approach
This study aims to develop conceptual model for the training of Chilean engineers in the construction field that considers the facultative symbiosis between sustainable construction (SC) and nature-based solutions (NBS). Bibliographic data linked to the complete collection of 7,163 articles published between 2011 and 2022 were extracted from Web of Science and Scopus for BA utilizing VOSviewer software.
Findings
A conceptual model for the education of engineers in SC and NBS was developed, based on Bloom’s taxonomy, initial knowledge and cross-cutting skills. This model includes four thematic clusters: green project management, green building, sustainable materials and bioengineering. Its development began with competencies and activities defined in systematic literature review (SLR), which were validated by engineering program directors and rated in the survey as “extremely important,” “very important” or “important.”
Originality/value
This research provides its readers with an extensive understanding of the salient research themes, trends and patterns for engineering education in SC and NBS. Furthermore, this research contributes to the development of clear guidelines for the rapid updating of training programs.
Details