Search results

1 – 2 of 2
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 1 March 2006

Lelio Raffa and Gianluca Esposito

E-Procurement (EP) can be defined as using the Internet in the purchasing process (de Boer, Harink & Heijboer, 2002). This paper focuses on the EP implementation process. Such…

79

Abstract

E-Procurement (EP) can be defined as using the Internet in the purchasing process (de Boer, Harink & Heijboer, 2002). This paper focuses on the EP implementation process. Such process is defined as the way new technologies are absorbed by organizations and become part of their routines (Capaldo, Raffa & Zollo, 1994; Leonard-Barton, 1988; Leonard & Spring, 2002). This paper illustrates the preliminary results of an explorative study focused on the implementation process of an e-procurement system in the Italian-public-health-care system. Drawing on the ICT implementation process literature, this research aims at contributing to the identification of a set of conditions under which different EP forms appear appropriate in different purchasing and organizational settings (Min & Galle, 1999; Emiliani, 2000).

Details

Journal of Public Procurement, vol. 6 no. 1/2
Type: Research Article
ISSN: 1535-0118

Access Restricted. View access options
Article
Publication date: 20 June 2016

M. Ramkumar

The increasing complexity and dynamism of new technology implemented or to implement have imposed substantial uncertainties and subjectivities in the risk assessment process. This…

616

Abstract

Purpose

The increasing complexity and dynamism of new technology implemented or to implement have imposed substantial uncertainties and subjectivities in the risk assessment process. This paper aims to present a risk assessment methodology for e-procurement implementation based on modified analytic network process (ANP) coupled with fuzzy inference systems.

Design/methodology/approach

ANP is modified in such a way that the experts can provide necessary data precise numerical value, a range of numerical values, a linguistic term or a fuzzy number. The proposed methodology incorporates knowledge and judgements obtained from experts to carry out identification of risk factors and to assess the risk magnitude of the identified risk factors based on factor index, risk likelihood and risk severity.

Findings

Risk magnitude of third party systems are found to be minor with a belief of 100 per cent, and for in-house systems, the risk is found to be between minor with a belief of 30 per cent and major of 70 per cent. The results indicate that by using the proposed methodology, the technological risk assessment of new technology can be done effectively and efficiently.

Research limitations/implications

Using the results of this study, the practitioners can better know the pros and cons of implementing both in-house and third party e-procurement systems.

Originality/value

The modified ANP is used mainly to structure and prioritize the diverse risk factors. Finally, an illustrative example on technological risk assessment of both in-house and third party e-procurement systems is used to demonstrate the applicability of the proposed methodology in real life situations.

Details

Strategic Outsourcing: An International Journal, vol. 9 no. 2
Type: Research Article
ISSN: 1753-8297

Keywords

1 – 2 of 2
Per page
102050