Article
Publication date: 11 October 2018

Kim Haugbølle and Lau M. Raffnsøe

Sustainable building design suffers from a lack of reliable life cycle data. The purpose of this paper is to compare life cycle costs of sustainable building projects, examine the…

4655

Abstract

Purpose

Sustainable building design suffers from a lack of reliable life cycle data. The purpose of this paper is to compare life cycle costs of sustainable building projects, examine the magnitude of various cost drivers and discuss the implications of an emerging shift in cost drivers.

Design/methodology/approach

This paper is based on data from 21 office buildings certified in Denmark according to the sustainable certification scheme DGNB.

Findings

The paper supports previous findings that construction costs and running costs each roughly make up half of the life cycle costs over a 50-year period. More surprising is the finding that the life cycle costs for cleaning are approximately twice as high as the supply costs for energy and water.

Research limitations/implications

The data set is based on actual construction costs of office buildings constructed in 2013-2017. Although all running costs are calculated rather than measured, they are based on a more detailed, specific and industry-supported set of calculation assumptions than is usual for life cycle costing studies because of extensive collaborative work in a number of concomitant national research and development projects.

Practical implications

Authorities, clients and building professionals heavily emphasise energy-saving measures in new Danish buildings. The paper suggests redirecting this effort towards other more prominent cost drivers like cleaning and technical installations.

Originality/value

This paper provides a notable contribution to the academic understanding of the significance of different cost drivers as well as the practical implementation of life cycle costing.

Details

Facilities, vol. 37 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Access Restricted. View access options
Article
Publication date: 29 May 2019

Kim Haugbølle, Jacob Norvig Larsen and Jørgen Nielsen

Construction is repeatedly criticised for its low productivity based on statistical data that do not represent the output of construction adequately. The purpose of this paper is…

834

Abstract

Purpose

Construction is repeatedly criticised for its low productivity based on statistical data that do not represent the output of construction adequately. The purpose of this paper is to improve the understanding of construction output – being the numerator in construction productivity calculations – by focussing on changes in quantity of the products, product characteristics and composition of the aggregate rather than as changes in price.

Design/methodology/approach

The research design of this study applies statistical data from the national accounts along with data from four paradigmatic case studies of social housing projects covering a period of 50 years.

Findings

The results indicate that while construction output prices have increased threefold over the past 50 years, improvements in performance can only explain approximately 20 per cent.

Research limitations/implications

The developed four-step method has demonstrated its value as a means to measure changes in the characteristics of the product, but more studies on the actual figures and results over time and regions are required before solid conclusions can be drawn.

Social implications

This study has added new knowledge of construction output that supports the development of a more accurate construction statistics, which in turn can assist the design of more effective and evidence-based policies for improving construction productivity.

Originality/value

This paper describes and demonstrates a novel performance-based methodology for addressing changes in the characteristics of the products in a longitudinally perspective, which can potentially provide a better understanding of changes in productivity.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Available. Open Access. Open Access
Book part
Publication date: 1 May 2019

Maria Saridaki and Kim Haugbølle

The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at…

Abstract

Purpose

The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at improving our understanding of the current cost calculation in design practices as an activity system with a number of built-in contradictions.

Design/Methodology/Approach

Drawing on one of the authors’ practical experience from a design office, the research design comprises a paradigmatic case study of a Danish architecture firm, in which data are gathered through documents, observations, interviews and physical artefacts. Moreover, this paper applies a literature review on barriers for adopting life-cycle costing.

Findings

The paper identifies a number of primary, secondary, tertiary and quaternary contradictions between practices of design, cost calculations and data management. Thus, hypotheses are formulated on how and to what extent these different contradictions shape cost calculations in design practices to obstruct or support the application of life cycle costing principles in design.

Research Limitations/Implications

This study is part of an ongoing research project. Thus, additional analysis is required before the authors may conclude on final results.

Practical Implications

This paper identifies a number of factors that obstruct or support the implementation of life cycle costing in current design practices.

Originality/Value

This paper provides new insights into the various contradictions that shape data management in architectural offices as a prerequisite for improving life cycle design practices.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Available. Open Access. Open Access
Book part
Publication date: 1 May 2019

Abstract

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Access Restricted. View access options
Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The…

Abstract

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Access Restricted. View access options
Article
Publication date: 4 January 2022

Sa’id Namadi Ahmed, Christine Pasquire and Emmanuel Manu

Extensive research on the importance of collaborative working (CW) and aligning stakeholders’ interests in construction has been widely conducted. But often the practice of…

412

Abstract

Purpose

Extensive research on the importance of collaborative working (CW) and aligning stakeholders’ interests in construction has been widely conducted. But often the practice of commercial actors during CW has often been overlooked, particularly within the UK setting, where scholars have lamented on the lack of industry-wide collaboration. This study aims to explore the factors affecting commercial actors in CW, specific to the UK construction industry.

Design/methodology/approach

The research used a context-based approach to seek stakeholders’ perspectives on the key factors affecting commercial actors in CW within the UK. Semi-structured interviews with individuals (contractors, cost consultants, designers among others) from construction and infrastructure organisations were conducted, using multiple case study investigations. The collected data was analysed using a case study approach, and principles of inductive thematic analysis to identify the key factors.

Findings

Findings from the analysis identified “institutional” factors such as transactional cost economic influence, the prevailing construction model influence and professional related drivers. Key drivers within these factors include commercial background and training, custom and practice, misaligned interests in projects, clients’ perception of consultants, cost-driven environment, conventional procurement protocols and bureaucratic functions.

Originality/value

In conclusion, these factors continue to affect CW with undue influence on commercial actors in the UK, thus preventing performance improvement demanded by successive UK Government reports. The context-based approach applied in this study is expected to provide some insight in construction management research, especially from a commercial perspective in the UK, to gain an understanding of how these factors are manifesting.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Book part
Publication date: 9 October 2019

Yusuf Sidani

Abstract

Details

A Spring Aborted
Type: Book
ISBN: 978-1-78756-666-8

Access Restricted. View access options
Article
Publication date: 31 July 2020

Serdar Durdyev

The study investigates the causes of project cost overruns (COs) that have been reported in the construction-management-related articles since 1985.

2796

Abstract

Purpose

The study investigates the causes of project cost overruns (COs) that have been reported in the construction-management-related articles since 1985.

Design/methodology/approach

To achieve the aim and provide recommendations to avoid project COs, 48 selected journal articles were reviewed and assessed with regard to the countries, institutions and researchers that have contributed to the subject.

Findings

The review of the articles shows that the subject has attracted a considerable attention from the researchers worldwide. However, the problem mainly occurred in developing countries and the researchers drew the attention on the resource-related, economic/financial as well as political problems. While 79 causes of COs were identified, the top ten causes of project COs, which have received the highest number of citations by the reviewed articles, were presented and discussed. These causes are: design problems and incomplete design, inaccurate estimation, poor planning, weather, poor communication, stakeholder's skill, experience and competence, financial problems/poor financial management, price fluctuations, contract management issues and ground/soil conditions.

Research limitations/implications

The study findings have several implications, which are not only for the academic world, but also for the construction front line. For scholars, the study provides a list of project COs that the researchers in the area could benefit for their future studies. The industry practitioners could find ways to improve project cost performance by giving attention to the causative factors that are significantly affecting construction projects and investing their resources and efforts towards the most occurred ones.

Originality/value

Thus, this study provides insight into the research output on the subject and a checklist of COs, which is believed to provide a better understanding of significant areas requiring attention where steps should be taken to minimize or control factors causing COs in construction projects.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 26 February 2021

Pauline Teo, Akvan Gajanayake, Sajani Jayasuriya, Ali Izaddoost, Treshani Perera, Nader Naderpajouh and Peter S.P. Wong

This paper critically reviews economic impact assessment methods adopted in construction-related projects, to develop and present a novel bottom-up approach suitable to estimate…

644

Abstract

Purpose

This paper critically reviews economic impact assessment methods adopted in construction-related projects, to develop and present a novel bottom-up approach suitable to estimate regional economic impacts of building maintenance projects.

Design/methodology/approach

A thorough literature review of economic impact assessment in construction projects is carried out to identify the most relevant approach to estimate wider economic impacts of building maintenance projects. Based on these findings, a model based on the bottom-up approach to estimate wider economic impacts is developed. The applicability and face validity of the developed model is demonstrated through a case of cladding replacement program in Australia.

Findings

The literature review revealed that bottom-up models are better suited for estimating regional economic impacts of maintenance projects, given the challenges of obtaining micro-level economic data in the maintenance sector. In relation to the total economic impacts (direct and indirect), the results show that for every $1 of government spending on similar projects the Gross State Product would increase by $1.34. In terms of employment impact, over 70% of the direct economic value addition is driven by the increase in labour, where close to 3 FTE jobs will be required for each $1 million of spending on cladding replacement projects.

Originality/value

This paper presents a model to estimate the wider economic impacts of building maintenance projects, which is typically overlooked in the construction management field. The proposed model is developed to incorporate the variability of different building maintenance projects so that the economic impact resulting from these projects could be estimated more accurately. This model can be used by local government decision-makers to justify and prioritise maintenance projects in a similar manner to new construction projects.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 29 October 2021

Soraya Nassri, Saeed Talebi, Faris Elghaish, Kayvan Koohestani, Stephen McIlwaine, M. Reza Hosseini, Mani Poshdar and Michail Kagioglou

High-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing…

331

Abstract

Purpose

High-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing construction projects.

Design/methodology/approach

This research uses a case study approach, with empirical data collected through direct observations and semi-structured interviews.

Findings

Having triangulated the findings from the literature review and empirical studies, a list of eight types of waste was derived for the thirteen observed laborers in ten case study projects. The empirical studies allowed the labor waste identified from the literature to be verified and refined by considering it in the context of the observed activities, and led to two new types of waste being identified which were not considered in the literature. Findings indicate that nearly 62% of laborers' time is spent on non-value-adding activities. It appeared that “unnecessary movement,” “waiting” and “indirect work” make up the highest labor waste.

Research limitations/implications

This research focuses only on onsite resource flows in a housing construction site. It does not include offsite flows such as material delivery to site.

Originality/value

The findings have provided substantial evidence on type and amount of labor waste and provide a solid basis to stimulate construction actors to participate in reducing labor waste and improving productivity.

Details

Smart and Sustainable Built Environment, vol. 12 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords