Search results

1 – 8 of 8
Per page
102050
Citations:
Loading...
Available. Open Access. Open Access
Article
Publication date: 5 April 2019

Jill Tomasson Goodwin, Joslin Goh, Stephanie Verkoeyen and Katherine Lithgow

The purpose of this paper is to report on research findings from a teaching and learning intervention that explored whether undergraduate university students can be taught to…

13322

Abstract

Purpose

The purpose of this paper is to report on research findings from a teaching and learning intervention that explored whether undergraduate university students can be taught to articulate their employability skills effectively to prospective employers and to retain this ability post-course.

Design/methodology/approach

The study included 3,400 students in 44 courses at a large Canadian university. Stage 1 involved a course-level teaching and learning intervention with the experimental student group, which received employability skills articulation instruction. Stage 2 involved an online survey administered six months post-course to the experimental group and the control group. Both groups responded to two randomly generated questions using the Situation/Task, Actions, Result (STAR) format, a format that employers commonly rely on to assess job candidates’ employability skills. The researchers compared the survey responses from the experimental and control groups.

Findings

Survey results demonstrate that previous exposure to the STAR format was the only significant factor affecting students’ skills articulation ability. Year of study and program (co-operative or non-co-operative) did not influence articulation.

Practical implications

The findings suggest that universities should integrate institution-wide, course-level employability skills articulation assignments for students in all years of study and programs (co-op and non-co-op).

Originality/value

This research is novel because its study design combines practical, instructional design with empirical research of significant scope (institution-wide) and participant size (3,400 students), contributing quantitative evidence to the employability skills articulation discussion. By surveying students six months post-course, the study captures whether articulation instruction can be recalled, an ability of particular relevance for career preparedness.

Details

Education + Training, vol. 61 no. 4
Type: Research Article
ISSN: 0040-0912

Keywords

Access Restricted. View access options
Article
Publication date: 20 March 2023

Xu Zhang, Mark Goh, Sijun Bai and Zonghan Wang

Risk response decisions (RRDs) are vital for project risk mitigation. Although past research has focused on RRDs for independent single projects, it has scarcely explored how to…

231

Abstract

Purpose

Risk response decisions (RRDs) are vital for project risk mitigation. Although past research has focused on RRDs for independent single projects, it has scarcely explored how to make RRDs for single projects in project portfolios (SPPPs). Consequently, this study aims to bridge the gap in extant literature by developing an integrated approach to select risk response strategies (RRSs) for SPPPs considering objective adjustments and project interdependencies (PIs).

Design/methodology/approach

An integrated quality function deployment (QFD) method was used throughout this study. More so, a balanced score card (BSC) and stratified-Z-numbers-full consistency method (SZFUCOM) was applied to identify SPPP success criteria (SP3SC) to determine their weights. In addition, a spherical fuzzy set-design structure matrix (SFDSM) was used to quantify the correlation between the risks and the relationship between the risks and the predecessor projects. Consequently, the relationships between the risks and SP3SC and RRSs were described by the spherical fuzzy set (SFS) and Z-numbers, respectively. Besides, the results are weaved into QFD to transform SP3SC into risks and then into RRSs, while a linear optimization model is used to obtain the optimal RRSs. Lastly, a construction project portfolio (PP) was used to test the veracity of the results to prove their validity.

Findings

The approach to RRDs for single projects is observed to be different from that of SPPPs. In addition, this study finds that project portfolio objective adjustments (PPOAs) and PIs have significant impacts on RRDs given that they influence the risk priorities of independent single projects and SPPPs. Moreover, the application of an integrated QFD effectively synthesized the results from the findings of this study, as well as enabled companies to determine robust RRSs. Finally, the consistency results of the SZFUCOM were better than those of the triangular fuzzy number-full consistency method.

Originality/value

The study innovatively explores the method of RRDs for SPPP, which has been ignored by past research. SP3SC highly compatible with PP success is determined. Z-numbers are first used to evaluate the effect of RRSs to enhance the robustness of RRDs. The study proposes a method of RRDs comprehensively considering PPOAs and PIs, which provides robust methodological guidance for SPPP managers to control risks.

Details

Kybernetes, vol. 53 no. 7
Type: Research Article
ISSN: 0368-492X

Keywords

Access Restricted. View access options
Article
Publication date: 21 August 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of…

264

Abstract

Purpose

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of diverse stakeholders. Conducting a bibliometric analysis, this paper aims to unravel the major research themes and methodologies utilised by researchers in studying the critical success criteria for construction projects, as well as extracting these success criteria.

Design/methodology/approach

The researchers systematically searched and screened 95 papers from Scopus and Web of Science (WoS) databases. This study conducted research focus parallelship network (RFPN) analysis and keywords co-occurrence network (KCON) analysis using BibExcel and Gephi to cluster the papers, illuminate the relationships among keywords within each cluster, and identify the primary research directions.

Findings

Using the RFPN analysis, this study classified the papers into three distinct clusters: infrastructure and public projects success, risk and knowledge management, and contractors and procurement management. Statistical techniques such as structural equation modelling (SEM) and multi-criteria decision-making methods such as analytic hierarchy process (AHP) have been used to analyse project success in the construction industry.

Research limitations/implications

Considering the intensified demand for streamlined digital interactions and the increasing emphasis on sustainability and safety performance, construction companies are recommended to allocate greater investments toward the automation and digitisation of their products and processes. Prioritising modular construction and embracing transformative technologies alongside data science is crucial for enabling well-informed decision-making, and enhancing project success.

Originality/value

This study contributes to the existing body of knowledge by conducting a quantitative and systematic evaluation of the literature on project success criteria in the construction industry and uncovering key research areas. It addresses the pressing need to understand the complexities of construction projects amidst evolving industry dynamics and emerging disruptions. Moreover, by highlighting the implications of digital innovations and modular construction, this study urges deeper exploration into their impact on project performance and stakeholder satisfaction. This research sets a comprehensive framework for investigating the interplay between project complexity, technological advancements, and sustainable practices in the construction sector, paving the way for strategic advancements in the field.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 21 May 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

The global construction industry has a history of poor project success, with evident and frequent overruns in cost and schedule. This industry is a highly interconnected and…

233

Abstract

Purpose

The global construction industry has a history of poor project success, with evident and frequent overruns in cost and schedule. This industry is a highly interconnected and complex system in which the components, i.e. suppliers, contractors, end-users, and stakeholders, are delicately linked to each other, the community, and the environment. Therefore, defining and measuring project success can be challenging for sponsors, contractors, and the public. To address this issue, this study develops and analyzes a more comprehensive set of success criteria for medium and large construction projects.

Design/methodology/approach

After reviewing the existing literature, this study identified 19 success criteria for medium and large construction projects, which were categorized into five groups. The fuzzy decision-making trial and evaluation laboratory (fuzzy DEMATEL) method was used to gain further insight into the interrelationships between these categories and explain the cause-and-effect relationships among them. Next, this study applied the modified logarithmic least squares method to determine the importance weight of these criteria using the fuzzy analytic hierarchy process.

Findings

28 project managers working in the construction industries in Australia and New Zealand participated in this study. Results suggest that “project efficiency” and “impacts on the project team” are cause criteria that affect “business success,” “impacts on stakeholders,” and “impacts on end-users.” Effective risk management emerged as the most crucial criterion in project efficiency, while customer satisfaction and return on investment are top criteria in “impacts on end-users” and “business success.”

Originality/value

Although numerous studies have been conducted on project success criteria, multicriteria analyses of success criteria are rare. This paper presents a comprehensive set of success criteria tailored to medium and large construction projects. The aim is to analyze their interrelationships and prioritize them thoroughly, which will aid practitioners in focusing on the most important criteria for achieving higher success rates.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 29 October 2021

Bashir Tijani, Xiaohua Jin and Robert Osei-Kyei

This conceptual paper aims to develop a multi-level mental health management framework for project management practitioners (PMPs) in architecture, engineering and construction…

991

Abstract

Purpose

This conceptual paper aims to develop a multi-level mental health management framework for project management practitioners (PMPs) in architecture, engineering and construction (AEC) project organizations through organizational design theories to extend current knowledge on mental health by revealing organizational, project and external environmental factors contributing to mental health management in AEC project organizations.

Design/methodology/approach

A systematic literature review was adopted to propose a theoretical model that integrated five organizational design theories: institutional theory, agency theory, resources-based theory (RBT), contingency theory and complexity theory.

Findings

The model reveals permanent organization, project organization and external environment factors for mental health management in AEC project organizations. It further proposed hypothetical interrelationships between elements of permanent organization, project organization, external environment and mental health management indicators to unravel the resultant effects of the interactions on mental health of PMPs.

Originality/value

This research contributes to the body of knowledge by developing a multi-level mental health management framework that identify and shows how combination permanent organization, project organization and external environment elements impact mental health of PMPs in AEC project organizations. It offers a model that offers guidance to practitioners on permanent organization and project organization management practices that can be implemented to improve mental health.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 10 September 2021

Muhammad Ashraf Fauzi, Khairul Firdaus Anuar, Rahimi A. Rahman, Jamaludin Jupir and Noraina Mazuin Sapuan

Achieving project success is the goal of every project. Due to various project requirements, some of the key determinants of project success cannot be met. The purpose of this…

817

Abstract

Purpose

Achieving project success is the goal of every project. Due to various project requirements, some of the key determinants of project success cannot be met. The purpose of this paper is to understand relying factors that can lead to a successful project that includes project management maturity, decision-making, coordination and knowledge management.

Design/methodology/approach

A self-administered survey was distributed to 231 project managers in the Malaysian project management community. Analysis using partial least square structural equation modelling was applied in testing the proposed relationship between these latent variables.

Findings

Finding shows that all the hypotheses were supported and significant. The most impactful factor is project management maturity, followed by knowledge management.

Practical implications

Implication to the project management industry includes providing autonomy to individuals involved in their expertise and management of efficient cross-functional teams between teams in the project. A systematic knowledge management system through a central repository would contribute to the efficient and flexible distribution of knowledge throughout the project process.

Originality/value

This study is one of the few studies focussing on determinants of project success in Malaysia.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 23 January 2023

An Thi Hoai Le and Monty Sutrisna

This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the…

806

Abstract

Purpose

This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the relationships between elements within PCCS processes and (3) identify improvement areas.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and partial least squares structural equation modelling (PLS-SEM) to measure the current maturity level of PCCS and evaluate the relationships between elements within PCSS to identify improvement areas. Further importance-performance matrix analysis (IPMA) of priority constructs was conducted to improve a target construct and identify the most important areas of specific actions at indicator levels. The results of IPMA revealed the contrast that has the greatest importance on the performance of others so that the recommendations can be made accordingly. Data collected in New Zealand were used to develop the research model.

Findings

This study develops structural and measurement models with the constructs including pre-control, in-control and post-control processes, enablers and their proposed interrelationships. Then, data from survey of 184 experienced project cost control team members reveal that post-control has the lowest maturity or weakest areas in the PCCS. Data analysis facilitated by PLS-SEM confirmed that all the constructs in the structural model have positive and significant relationships with each other and suggested that systematic cost analysis reports, communication, skills and experience, defining roles and responsibilities, and top management's support should be the highest priority for improving the PCCS in a more effective manner.

Originality/value

This study presents one of the earliest attempts to develop and test an integrated model that links sub-processes in PCCS and their enablers. Secondly, this research adds to the construction project management literature by empirically verifying the roles of enablers in enhancing maturity level of PCCS.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 8 December 2020

Anupama Prashar and Parul Gupta

Corporation's board (CB) is viewed as a vital internal corporate governance (CG) mechanism, playing a critical role in mitigating the agency problems and enhancing firm…

784

Abstract

Purpose

Corporation's board (CB) is viewed as a vital internal corporate governance (CG) mechanism, playing a critical role in mitigating the agency problems and enhancing firm performance. Considering the mixed nature of extant CG literature on CB-firm performance link, this study aims to examine the impact of specific CB attributes on firm performance studied in varied contextual settings and investigates the moderating effects of three contextual factors, i.e. legal origin, industry type and firm type on CB-performance relationships.

Design/methodology/approach

Meta-analysis technique suggested by Hedges and Olkin (1985) was used to analyse a sample of 330 effect sizes reported in 148 studies published between 2000 and 2020 in 85 peer-viewed journals, studying CB-performance associations across 31 countries. The analyses were conducted in two stages: first, the authors assessed the main effect of CB attributes on firm performance and tested the heterogeneity in effect size across the primary studies. In the next stage, the authors investigated the moderating variables accounting for this heterogeneity in the CB-firm performance relationship.

Findings

Board independence, board diversity, board size and role duality are the CB attributes, which significantly and positively impact firm performance. Further, the homogeneity tests revealed variability in effect size for all CB attributes except for board committees. Subgroup meta-analyses revealed that the contextual factors related to industry-type and firm-type are substantial explanatory source of heterogeneity in CB-performance association, though legal origin of firm also partially explains the heterogeneity in this relationship.

Research limitations/implications

Only empirical research reporting Pearson product-moment correlation coefficients(r), as the effect size, were considered for this study. Some of the other CB attributes such as board composition, compensation structure of board members, performance evaluation and appointment process of board members were not included due to limited empirical research on these attributes.

Practical implications

The paper includes implications for managers and policy makers for the development of effective corporate boards and CG mechanisms.

Originality/value

This paper integrates diverse empirical evidence on the associations of CB attributes with firm performance and systematically assesses the moderating factors that contributes to heterogeneity in these relationships.

Details

International Journal of Emerging Markets, vol. 16 no. 7
Type: Research Article
ISSN: 1746-8809

Keywords

1 – 8 of 8
Per page
102050