Search results

1 – 3 of 3
Article
Publication date: 18 June 2024

Shizheng Sun, Ke Pang, Chao Liao and Jingtong Yu

The use of a force sensor to estimate the external force of manipulator not only needs to deal with the signal noise of the sensor itself but also needs to solve the coupling…

Abstract

Purpose

The use of a force sensor to estimate the external force of manipulator not only needs to deal with the signal noise of the sensor itself but also needs to solve the coupling interference of the sensor itself, especially the axial force. The purpose of this paper is to develop a three-dimensional fiber Bragg grating (FBG) wrist force sensor, which has a simple structure and reduces the coupling influence between several axes.

Design/methodology/approach

A particular separation elastic structure with four FBGs is devised for the three-axial force sensor. One FBG is suspended on the profile of central cylinder and the other three FBGs are pasted on the elastic beam surface of the over and under measuring bodies, respectively. Finite element analysis (FEA) simulation has been implemented to the strain distribution characteristics, the output characteristics of each direction and the coupling effects of the structure. Furthermore, theoretical derivation and experimental results are used to compare, which have a good consistency.

Findings

The experiment results show that the maximum repeatability error of the sensor is 6.75%, the maximum nonlinear error is 5.36%, the maximum coupling interference is 4.73% and the minimum sensitivity is 1.58 pm/N.

Originality/value

A three-dimensional force sensor based on FBG adopts a particular separation elastic structure. The sensor can reduce the coupling influence between several axes, especially the coupling interference in the z-direction is 0.

Article
Publication date: 28 July 2022

Xiaoyan Jiang, Sai Wang, Yong Liu, Bo Xia, Martin Skitmore, Madhav Nepal and Amir Naser Ghanbaripour

With the increasing complexity of public–private partnership (PPP) projects, the amount of data generated during the construction process is massive. This paper aims to develop a…

Abstract

Purpose

With the increasing complexity of public–private partnership (PPP) projects, the amount of data generated during the construction process is massive. This paper aims to develop a new information management method to cope with the risk problems involved in dealing with such data, based on domain ontologies of the construction industry, to help manage PPP risks, share and reuse risk knowledge.

Design/methodology/approach

Risk knowledge concepts are acquired and summarized through PPP failure cases and an extensive literature review to establish a domain framework for risk knowledge using ontology technology to help manage PPP risks.

Findings

The results indicate that the risk ontology is capable of capturing key concepts and relationships involved in managing PPP risks and can be used to facilitate knowledge reuse and storage beneficial to risk management.

Research limitations/implications

The classes in the risk knowledge ontology model constructed in this research do not yet cover all the information in PPP project risks and need to be further extended. Moreover, only the framework and basic methods needed are developed, while the construction of a working ontology model and the relationship between implicit and explicit knowledge is a complicated process that requires repeated modifications and evaluations before it can be implemented.

Practical implications

The ontology provides a basis for turning PPP risk information into risk knowledge to allow the effective sharing and communication of project risks between different project stakeholders. It can also have the potential to help reduce the dependence on subjectivity by mining, using and storing tacit knowledge in the risk management process.

Originality/value

The apparent suitability of the nine classes of PPP risk knowledge (project model, risk type, risk occurrence stage, risk source, risk consequence, risk likelihood, risk carrier, risk management measures and risk case) is identified, and the proposed construction method and steps for a complete domain ontology for PPP risk management are unique. A combination of criteria- and task-based evaluations is also developed for assessing the PPP risk ontology for the first time.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 March 2023

Preeti Godabole and Girish Bhole

The main purpose of the paper is timing analysis of mixed critical applications on the multicore system to identify an efficient task scheduling mechanism to achieve three main…

Abstract

Purpose

The main purpose of the paper is timing analysis of mixed critical applications on the multicore system to identify an efficient task scheduling mechanism to achieve three main objectives improving schedulability, achieving reliability and minimizing the number of cores used. The rise in transient faults in embedded systems due to the use of low-cost processors has led to the use of fault-tolerant scheduling and mapping techniques.

Design/methodology/approach

The paper opted for a simulation-based study. The simulation of mixed critical applications, like air traffic control systems and synthetic workloads, is carried out using a litmus-real time testbed on an Ubuntu machine. The heuristic algorithms for task allocation based on utilization factors and task criticalities are proposed for partitioned approaches with multiple objectives.

Findings

Both partitioned earliest deadline first (EDF) with the utilization-based heuristic and EDF-virtual deadline (VD) with a criticality-based heuristic for allocation works well, as it schedules the air traffic system with a 98% success ratio (SR) using only three processor cores with transient faults being handled by the active backup of the tasks. With synthetic task loads, the proposed criticality-based heuristic works well with EDF-VD, as the SR is 94%. The validation of the proposed heuristic is done with a global and partitioned approach of scheduling, considering active backups to make the system reliable. There is an improvement in SR by 11% as compared to the global approach and a 17% improvement in comparison with the partitioned fixed-priority approach with only three processor cores being used.

Research limitations/implications

The simulations of mixed critical tasks are carried out on a real-time kernel based on Linux and are generalizable in Linux-based environments.

Practical implications

The rise in transient faults in embedded systems due to the use of low-cost processors has led to the use of fault-tolerant scheduling and mapping techniques.

Originality/value

This paper fulfills an identified need to have multi-objective task scheduling in a mixed critical system. The timing analysis helps to identify performance risks and assess alternative architectures used to achieve reliability in terms of transient faults.

Details

International Journal of Pervasive Computing and Communications, vol. 20 no. 1
Type: Research Article
ISSN: 1742-7371

Keywords

1 – 3 of 3