Xunlei Shi, Qingyuan Wu, Jianjian Deng, Ken Chen and Jiwen Zhang
The purpose of this paper is to propose a strategy for the final assembly of helicopter fuselage with weak rigidity parts and mismatched jointing butt ends.
Abstract
Purpose
The purpose of this paper is to propose a strategy for the final assembly of helicopter fuselage with weak rigidity parts and mismatched jointing butt ends.
Design/methodology/approach
The strategy is based on path planning methods. Compared with traditional path planning methods, the configuration-space and collision detection in the method are different. The obstacles in the configuration-space are weakly rigid and allow continuous contact with the robot. The collision detection is based on interference magnitudes, and the result is divided into no collision, weak collision and strong collision. Only strong collision is unacceptable. Then a compliant jointing path planning algorithm based on RRT is designed, combined with some improvements in search efficiency.
Findings
A series of planning results show that the efficiency of this method is higher than original RRT under the same conditions. The effectiveness of the method is verified by a series of simulations and experiments on two sets of systems.
Originality/value
There are few reports on the automation technology of helicopter fuselage assembly. This paper analyzes the problem and provides a solution from the perspective of path planning. This method contains a new configuration-space and collision detection method adapted to this problem and could be intuitive for the jointing of other weakly rigid parts.
Details
Keywords
Lei Qi, Zhiyuan Shen, Jianjian Gao, Guoliang Zhao, Xiang Cui and Wei Kang
This paper aims to establish the wideband model of a sub-module in a modular multilevel converter (MMC) and analyze the switch transients of the sub-module.
Abstract
Purpose
This paper aims to establish the wideband model of a sub-module in a modular multilevel converter (MMC) and analyze the switch transients of the sub-module.
Design/methodology/approach
The paper builds an MMC sub-module test circuit and conducts dynamic tests both with and without the bypass thyristor. Then, it builds the wideband model of the MMC sub-module and extracts the model parameters. Finally, based on the wideband model, it simulates the switch transients and analyzes the oscillation mechanism.
Findings
The dynamic testing shows the bypass thyristor will add oscillations during switch transients, especially during the turn-on process. The thyristor acts like a small capacitor and reduces the total capacitor in the turn-on circuit loop, thus causing under-damped oscillations.
Originality/value
This paper found that the bypass thyristor will influence the MMC sub-module switch transients under certain circumstances. This paper proposes a partial inductance extraction procedure for the MMC sub-module and builds a wideband model of the sub-module. The wideband model is used to analyze and explain the switch transients, and can be further used for insulated gate bipolar transistor switch oscillation inhibition and sub-module design optimization.
Details
Keywords
Rahul Vishwanath Dandage, Santosh B. Rane and Shankar S. Mantha
Project risk management (PRM) and human resource management (HRM) are the two critical success factors (CSFs) for international project management. This paper aims to correlate…
Abstract
Purpose
Project risk management (PRM) and human resource management (HRM) are the two critical success factors (CSFs) for international project management. This paper aims to correlate these two CSFs, identify the human resource (HR) barriers, develop a hybrid model for risk management and develop strategies to overcome the HR barriers to effective risk management in international projects.
Design/methodology/approach
In total, 20 key HR barriers have been identified through a literature survey and verified by project professionals. These HR barriers are ranked according to their ability to trigger other barriers by analysing their interactions using the decision-making trial and evaluation laboratory (DEMATEL) method. Based on Ulrich’s revised model for HR functions, a hybrid framework for international PRM has been proposed.
Findings
DEMATEL analysis categorized nine barriers as cause barriers and 11 as affected barriers. The “PROJECTS” model proposed for HR strategy development suggests eight strategies to overcome these nine cause barriers. The hybrid PRM framework developed includes the effect of the HR dimension.
Research limitations/implications
This paper presents the generalized prioritization of HR barriers to international PRM. For a specific international project, the HR barriers and their prioritization may change slightly. The hybrid framework for PRM and the strategy development model suggested are yet to be validated.
Originality/value
Correlating two CSFs in international project management, i.e. HRM and PRM and ranking the HR barriers using the DEMATEL method is the uniqueness of this research paper. The hybrid framework developed for PRM based on HR functions in Ulrich’s revised model and the proposed new HR strategy development model “PROJECTS” are unique contributions of this paper.
Details
Keywords
Himanshu Gupta, Sarangdhar Kumar, Simonov Kusi-Sarpong, Charbel Jose Chiappetta Jabbour and Martin Agyemang
The aim of this study is to identify and prioritize a list of key digitization enablers that can improve supply chain management (SCM). SCM is an important driver for…
Abstract
Purpose
The aim of this study is to identify and prioritize a list of key digitization enablers that can improve supply chain management (SCM). SCM is an important driver for organization's competitive advantage. The fierce competition in the market has forced companies to look the past conventional decision-making process, which is based on intuition and previous experience. The swift evolution of information technologies (ITs) and digitization tools has changed the scenario for many industries, including those involved in SCM.
Design/methodology/approach
The Best Worst Method (BWM) has been applied to evaluate, rank and prioritize the key digitization and IT enablers beneficial for the improvement of SC performance. The study also used additive value function to rank the organizations on their SC performance with respect to digitization enablers.
Findings
The total of 25 key enablers have been identified and ranked. The results revealed that “big data/data science skills”, “tracking and localization of products” and “appropriate and feasibility study for aiding the selection and adoption of big data technologies and techniques ” are the top three digitization and IT enablers that organizations need to focus much in order to improve their SC performance. The study also ranked the SC performance of the organizations based on digitization enablers.
Practical implications
The findings of this study will help the organizations to focus on certain digitization technologies in order to improve their SC performance. This study also provides an original framework for organizations to rank the key digitization enablers according to enablers relevant in their context and also to compare their performance with their counterparts.
Originality/value
This study seems to be the first of its kind in which 25 digitization enablers categorized in four main categories are ranked using a multi-criteria decision-making (MCDM) tool. This study is also first of its kind in ranking the organizations in their SC performance based on weights/ranks of digitization enablers.