Jin Ouk Choi, Binit Kumar Shrestha, Young Hoon Kwak and Jennifer Shane
Facility design standardization strategy has considerable advantages, highlighted by its widespread and consistent use in the shipbuilding and manufacturing industries. However…
Abstract
Purpose
Facility design standardization strategy has considerable advantages, highlighted by its widespread and consistent use in the shipbuilding and manufacturing industries. However, capital projects have failed to realize these benefits. The primary rationale behind this problem is the lack of proper understanding of design standardization, more specifically the benefits and equally importantly, the trade-offs of design standardization in capital projects. Therefore, this study highlights 13 benefits and six trade-offs of standardization in connection to design standardization, along with specific examples.
Design/methodology/approach
To achieve the study objectives, the researchers identified the most impactful benefits and trade-offs in terms of economic impact by surveying prominent players in the industry. Furthermore, the researchers examined 43 actual case projects (a case study) executed with the standardization strategy to evaluate the industry's status in terms of the levels of advantage achievement and disadvantage incurrence.
Findings
The results of this survey show that design once, reuse multiple times and design and procurement in advance are the most impactful benefits. Similarly, susceptible to changes in the market conditions is one of the top trade-offs that can be incurred in capital projects when implementing standardization. The results also highlight that design once, reuse multiple times is one of the most achieved benefits in standardized capital projects today, while cost of establishing the design standard is the most incurred trade-off.
Originality/value
This study provides important insight into how standardization strategy can be advantageous while also enriching the literature about pitfalls expected from standardization. Moreover, this study's results will help the industrial sector achieve higher levels of design standardization by providing a better understanding of the benefits and trade-offs of design standardization.
Details
Keywords
Darren McWhirt, Junyong Ahn, Jennifer S. Shane and Kelly C. Strong
Design‐build project delivery will likely yield benefits when it is a rational choice by a program director or owner's construction manager. It is not well understood whether…
Abstract
Purpose
Design‐build project delivery will likely yield benefits when it is a rational choice by a program director or owner's construction manager. It is not well understood whether those benefits translate to construction programs where design‐build is mandated for the vast majority of project types. Such a determination for military construction (MILCON) is the purpose of this paper.
Design/methodology/approach
The methodology for the research involved a comparison of mean performance metrics for design‐build and design‐bid‐build MILCON projects. Once an appropriate sample of projects was identified, project data were corrected for project location, size and time‐value‐of‐money.
Findings
Military design‐build projects did experience a lower total cost of change orders as well as a reduced change order cost associated with field changes. Also, statistical analysis demonstrated no significant difference in project performance metrics based on facility type. These results indicate that design‐build project delivery method can work equally well on all types of MILCON projects and is an effective system for cost and scope control, but that some of the expected schedule performance gains underlying the decision to use design‐build will be difficult to achieve on all MILCON projects.
Originality/value
The paper presents advantages and disadvantages of utilising design‐build to MILCON projects by facility types.
Details
Keywords
Paulos A. Wondimu, Ole Jonny Klakegg and Ola Lædre
Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must…
Abstract
Purpose
Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must comply with international and national legislation. The purpose of this paper is to develop a framework that illustrates the various approaches that public project owners can take to implement ECI.
Design/methodology/approach
In addition to a literature review, three groups of case studies were carried out. The case studies were based on 54 semi-structured in-depth interviews with key personnel from 21 Norwegian public projects and document study.
Findings
In all, 25 approaches to ECI were identified during the research. Twelve of these were used in the cases studied.
Social implications
There are several approaches to ECI that are suitable for public owners. However, the contractor’s contribution depends on which approach is implemented and how it is implemented.
Originality/value
As original contribution, this study presents a novel framework that defines options for implementing ECI in public projects. Furthermore, this paper provides insights on how ECI can be implemented in public projects based on Norwegian experiences. Although the empirical data of the study is limited to Norwegian public projects, this study contributes to knowledge about how to implement ECI internationally.
Details
Keywords
Mario A. Fernandez, Jennifer L.R. Joynt, Chad Hu and Shane L. Martin
This paper aims to explore the impact of the joint operation of affordability policies and whether their impact is meaningful relative to the size of the affordability crisis. Its…
Abstract
Purpose
This paper aims to explore the impact of the joint operation of affordability policies and whether their impact is meaningful relative to the size of the affordability crisis. Its purpose is to construct the features of a comprehensive policy package linked to a measurable outcome: solving the affordability crisis in Auckland. This study investigates the scale and nature of an affordability package that responds to three research and policy questions: What should the rate of annual growth of affordable housing be to solve the affordability crisis? Consequently, how long would it take to solve it? And how much would that policy package cost?
Design/methodology/approach
In this paper, the authors argue that the disjoint operation of affordability policies is one of the reasons why their impacts relative to the size of the affordability crisis has been small or negligible. Furthermore, this study demonstrates that affordability is as much about raising households’ incomes as it is about lowering housing prices. This study uses a modelling-based framework to simulate some of the levers that local and central governments have to affect housing prices and affordability: direct intervention on the supply-side and subsidies. Specifically, this simulates retention-and-targeting (RT) programs and subsidies to raise deposits via shared ownership (SO) schemes.
Findings
This study finds that solving the affordability crisis would take a decade if the supply of affordable housing increases by at least 45% annually. With the introduction of RT and SO programs, it could still be solved within a decade, where the required growth rate decreases to 35%. However, for growth rates between 5% and 10%, the policy goal is met in approximately 40 years, and the SO program becomes exceedingly expensive.
Originality/value
Housing affordability is one of the hottest policy issues in New Zealand and the developed world. In the past decade, a number of affordability policies have been introduced with limited success due to their lack of interoperability and siloed efforts. Results in this paper should be interpreted as the boundaries of what is feasible and realistic in the realm of affordability policies. Therefore, its contribution relies on investigating the multiple effects if the financial, administrative and political barriers to RT and SO programs could be overcome. Its scope is a blueprint for the design of policies in other cities where unaffordability has become extreme.
Details
Keywords
Christopher C. Brown and Erin Elzi
This paper aims to present updated statistics demonstrating the value of cataloging free Internet resources and the challenges of batch loading, vendor records, electronic…
Abstract
Purpose
This paper aims to present updated statistics demonstrating the value of cataloging free Internet resources and the challenges of batch loading, vendor records, electronic resource modules and discovery tools, as an update to the 2008 paper in this journal
Design/methodology/approach
Updates the statistics from the URL redirection system for tracking user access to freely available Web publications.
Findings
With more projects and bibliographic records included within the scope of the project, users still find and use the links to outbound content. New technologies and management methods support the cataloging of free Web content, even if, at times, cataloging standards are compromised.
Originality/value
Several studies have focused on US federal document clickthroughs from the library catalog, but this is the only study to exclusively track clickthroughs to freely available Web content.