Search results

1 – 10 of over 75000
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 4 September 2024

Yi-Hsin Lin, Zixuan Huang and Yuqing Gao

This study investigates the influence of market and hierarchy organizational cultures on international project performance and examines the mediating role of relational capital.

174

Abstract

Purpose

This study investigates the influence of market and hierarchy organizational cultures on international project performance and examines the mediating role of relational capital.

Design/methodology/approach

In-depth interviews and a cross-sectional questionnaire survey were conducted to collect primary data within international projects. Hierarchical regression analysis was used to test the hypotheses based on data collected from 62 respondents.

Findings

The results reveal that both market and hierarchy cultures affect international project performance positively. Additionally, communication, cooperation and trust help enhance project performance; however, commitment is not. This study also proves the mediating role of relational capital between organizational culture and project performance.

Research limitations/implications

This study selected only two types of organizational culture represented by Chinese construction enterprises. Future studies can explore the mediating role of relational capital between other varieties of organizational culture and project performance.

Originality/value

Given the high complexity and risks faced by projects abroad, both organizational culture, the internal environmental factor and relational capital being the external resource, are crucial for project success. This study clarifies the relationship between organizational culture, relational capital and project performance overseas. Empirical evidence to enhance international project performance for construction enterprises is provided. This study also makes contributions to international contractors who want to implement projects in developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The…

Abstract

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Access Restricted. View access options
Article
Publication date: 28 May 2020

Satish Kumar Viswanathan and Kumar Neeraj Jha

A number of previous studies have investigated international construction project risks and have proposed risk mitigation measures without examining their interdependence. The…

648

Abstract

Purpose

A number of previous studies have investigated international construction project risks and have proposed risk mitigation measures without examining their interdependence. The purpose of the current study is to identify the influence of various risk mitigation measures on macro-level risk factors in the international marketplace.

Design/methodology/approach

The authors initially identified 26 risk variables and nine risk mitigation measures through a literature review, which were then verified for their pertinence to international projects by three experts. Subsequently, 105 questionnaire survey responses were collected and analysed using factor analysis and structural equation modelling to test the interrelations between the risk variables and mitigation measures.

Findings

The findings suggest that joint ventures with local partners is emerged as the most critical risk mitigation measure that influences the international projects, which are exposed to political, project and firm-specific risk factors. Further, it is worth noting that among the recognised risk mitigation measures in international projects, offering more local employment is the least critical mitigation measure in the international projects.

Research limitations/implications

The findings of this study are based on the macro-risk factors encountered by Indian construction firms in international projects, mostly from specific Asian and African regions. Thus, the opinions of construction firms from the developed countries might be different.

Originality/value

The main contribution of this study to existing knowledge is empirical evidence of the interrelationships between risk mitigation measures and risk factors that are portrayed as latent variables of different manifest risk variables. The generated model can assist construction firms in emphasising several risk mitigation methods, in order to reduce risk and enhance performance in international construction projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 11 July 2022

Yi Wang, Xiaopeng Deng and Hongtao Mao

This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies…

737

Abstract

Purpose

This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies represented by the novel coronavirus pneumonia pandemic (hereinafter COVID-19) and how the public emergency affected the Personnel Localization Management from three levels: staff turnover rate, the number of different personnel, the salary and performance of workers. The paper also helps to enhance the construction enterprises' response capacity of major public emergencies and provides a comprehensive framework of optimization strategies for the Personnel Localization Management of international construction projects (hereinafter projects).

Design/methodology/approach

The main research method of this paper is the case study, and ten representative international construction projects are selected for case study in China construction enterprises (hereinafter CCE). And this study used the failure mode and effects analysis (FMEA) and comparative analysis to find out all potential risk factors under the COVID-19 and analyze how the epidemic affects the Personnel Localization Management of projects which based on the primary data from 10 projects obtained through in-depth interviews and the secondary data from China First Metallurgical Group and Central South Construction Group's Overseas Enterprise.

Findings

The findings show that the outbreak of the major public emergencies not only greatly increased eight risk factors but also directly led to an increase in staff turnover rate. Meanwhile, the numbers of Chinese and local managers and workers are all affected, and an increase in the number and the salary performance of local workers can be reduced, to a certain extent, to the cost-to-output ratio of the projects. The findings would help construction enterprises better cope with Personnel Localization Management and enhance the response capacity of major public emergencies.

Research limitations/implications

This study will broaden researchers' horizons regarding “Personnel Localization Management under major public emergencies” and “risk factors of Personnel Localization Management in an international context.” Furthermore, construction enterprises looking for a better mechanism of Personnel Localization Management can benefit from research findings and lessons learned from the authors' case study during or before an outbreak of major public emergency. Lastly, the framework of optimization strategies for Personnel Localization Management can be used both for research purposes and practice issues in international construction projects.

Practical implications

The findings from the authors' case study offer the direction for international construction enterprises in China and other countries to formulate effective measures, strengthen overseas business and establish a crisis management mechanism for Personnel Localization Management under major public emergencies, and the findings provide emergency plans for projects to improve the public crisis handling capacity and respond to major public emergencies such as the COVID-19.

Social implications

This study analyzes the impact of the COVID-19 on the Personnel Localization Management of international construction projects from the perspective of personnel. This study provides a theoretical reference for the international construction industry to actively respond to major public emergencies. Besides, the research is conducive to improving the emergency response mechanism in the construction industry, and further promoting the high-quality and globalized development of international construction.

Originality/value

This study provides other researchers with a comprehensive understanding of the risk factors affecting the Personnel Localization Management of projects under the COVID-19 and insight for further research on localization management, risk management, and project management.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 29 January 2020

Satish Kumar Viswanathan and Kumar Neeraj Jha

International construction projects encompass various risks, and it is essential to evaluate and manage them to achieve project and firms’ success. As approaches to addressing…

1951

Abstract

Purpose

International construction projects encompass various risks, and it is essential to evaluate and manage them to achieve project and firms’ success. As approaches to addressing international market risks vary from one country to another, the purpose of this paper is to identify the critical risk factors of embarking on international construction projects according to Indian experiences.

Design/methodology/approach

After primarily verifying the identified 26 risk variables, a questionnaire survey was conducted to draw upon the views of experts who possess international project experience. The 105 responses were analyzed using univariate and multivariate techniques. An analysis of variance identified the significant variables that influence overall performance on international construction projects, which were then grouped according to underlying relationships using factor analysis to determine the specific risk factors. Furthermore, considering these risk factors as independent variables and overall project performance as a dependent variable, a stepwise regression analysis was carried out to identify relatively critical risk factors.

Findings

The results revealed that of the identified four risk factors, the project-specific risk factor emerged as the foremost critical risk factor, the economic and market-specific risk factor was the second most critical risk factor, the firm-specific risk factor was the third most critical risk factor and the political-specific risk factor was the least critical risk factor. These findings were also validated appropriately.

Research limitations/implications

This study was limited to the data acquired from Indian construction firms, predominantly consultants and contractors. Though the survey respondents possessed adequate familiarity in international construction, commonly perceived limitations in self-reported surveys such as the lack of conscientious responses and reporting bias were not an exception in this research.

Practical implications

The risk factors and their criticality – as identified in this study – can aid the multinational firms and international aspirants to prioritize the critical aspects and develop a suitable risk mitigation strategy to achieve greater project success in international market.

Originality/value

By investigating the various risk factors that influence overall performance of international construction projects, this research considerably contributes to the body of knowledge pertaining to international construction risk management that will enable firms from India and similar developing nations to emphasize on critical risk factors.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 15 July 2024

Li Feng, Junying Liu, Zhixiu Wang and Yanyan Hong

The regulatory landscape surrounding international construction projects presents significant challenges, and contractors are still struggling to pay a painful price for their…

117

Abstract

Purpose

The regulatory landscape surrounding international construction projects presents significant challenges, and contractors are still struggling to pay a painful price for their performance in the project. While existing research has identified various causes of contractor compliance, the intricate interplay of these factors and their impact on compliance remain largely elusive. The motivation-opportunity-ability (MOA) framework may hold the key to determining what factors can foster induced contractor compliance in international projects.

Design/methodology/approach

This study collected 124 valid data samples from practitioners involved in large-scale international contracting projects through expert interviews and questionnaire surveys. Fuzzy-set qualitative comparative analysis (fsQCA) was employed to analyze the diverse combinations of contractor compliance factors.

Findings

The study identifies seven key factors that contribute to compliance behavior among international construction contractors: economic motivation, social motivation, normative motivation, legal completeness, deterrent sanctions, organizational learning and compliance management ability. The interplay of these factors promotes compliance in the following ways: When international construction contractors are influenced by both social and normative motivations, they exhibit a higher level of compliance. In situations where regulatory systems are relatively weak, the ability to manage compliance becomes the primary driver of compliance behavior for businesses. A comprehensive legal framework creates a conducive environment for contractors to improve their compliance through organizational learning.

Research limitations/implications

The findings offer guidance for international construction contractors in enhancing compliance by considering factors such as motivations, legal frameworks, organizational learning and compliance management. This can lead to improved risk management and performance in international projects.

Social implications

This research enhances fair and ethical practices in international construction by identifying compliance drivers, fostering positive social impact, mitigating negative consequences and empowering local communities. It informs legal and regulatory reform, encourages improved business practices and contributes to knowledge advancement in the field. Overall, the findings have the potential to positively impact the social fabric of international construction projects.

Originality/value

This study has made an important contribution to the field of compliance theory by integrating theories from multiple disciplinary domains and constructing a new theoretical framework from the perspectives of motivation, opportunity and capability. By elucidating how these factors interact and influence compliance behavior among international construction contractors, this research aids in understanding the complex dynamics of contractor compliance behavior and provides theoretical reference for compliance governance within the construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 7 October 2013

Gul Polat and Befrin Neval Bingol

The main objective of this paper is to show how fuzzy logic and multiple regression analysis (MRA) techniques can be used by construction companies for determining the size of…

996

Abstract

Purpose

The main objective of this paper is to show how fuzzy logic and multiple regression analysis (MRA) techniques can be used by construction companies for determining the size of contingency that will be included in bid prices for international construction projects in a more systematic way and to compare their modelling performances.

Design/methodology/approach

The steps followed in the execution of this study mainly consists of: conducting a literature review on international construction in order to identify the factors that may affect contingency amounts that will be included in bid prices for international construction projects; developing the general framework of the proposed contingency estimation model; designing a questionnaire based on the information gathered from the literature review, delivering these questionnaires to construction experts, and obtaining the actual data of 36 international construction projects; developing a fuzzy logic model based on expert judgments and three multiple regression analysis models (MRAM) using the collected data; and comparing the performances of these approaches.

Findings

In this study, a fuzzy logic model and three MRAM were developed. Their modelling performances were compared using actual data obtained from 36 international construction projects that had been completed by 20 large-scale Turkish construction companies in 14 different countries. It is found that the developed fuzzy logic model outperforms the MRAM built for the studied projects.

Originality/value

This study shows that fuzzy logic and MRA techniques can be successfully used by construction companies, which predominantly do business in foreign countries, for estimating the size of cost contingency that will be included in bid prices for international construction projects. The modelling performances of fuzzy logic and MRAM are also compared.

Details

Construction Innovation, vol. 13 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Access Restricted. View access options
Article
Publication date: 21 August 2023

Alaeldin Abdalla, Xiaodong Li and Fan Yang

Besides ensuring traditional project objectives, expatriate construction professionals (EXCPs) working on international projects face challenges adapting to unfamiliar…

477

Abstract

Purpose

Besides ensuring traditional project objectives, expatriate construction professionals (EXCPs) working on international projects face challenges adapting to unfamiliar environments with varying construction standards, work practices and cultural values. This puts them at a high risk of job burnout. Thus, this study aims to investigate the antecedents and outcomes of EXCPs' job burnout in the international construction industry.

Design/methodology/approach

Based on the Job demands-resource model (JD-R), a theoretical framework was developed. Industry-specific stressors and expatriate management practices were identified using a literature review and interviews. The authors then used a questionnaire survey to collect data from Chinese EXCPs. Exploratory factor analysis, confirmatory factor analysis and structural equation modeling were then utilized to test hypotheses.

Findings

The findings indicate that early-career EXCPs experience the most severe levels of job burnout. The paths analysis proved the direct and indirect mitigating effects of expatriate management practices on job burnout, and EXCP's job burnout was associated with poor job performance and decreased intention to stay in the international assignment.

Originality/value

While prior research has explored job burnout among construction professionals working on domestic projects, little attention has been given to EXCPs and their unique challenges. This study aims to fill this critical gap in the literature by offering a unique perspective on the antecedents and outcomes of job burnout among EXCPs in international contexts and presents a significant contribution to understanding and addressing occupational health issues faced by EXCPs.

Details

Engineering, Construction and Architectural Management, vol. 32 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 1 December 2010

George Wang, Huanqing Lu and Zhaomin Ren

Current construction management programmes in higher education institutions provide students with sound technical and management knowledge. However, in the twenty‐first century…

1415

Abstract

Current construction management programmes in higher education institutions provide students with sound technical and management knowledge. However, in the twenty‐first century, construction professionals need to be familiar with the cultural, environmental, and political factors that could affect international projects and know how to work effectively in the global arena. How to face the unique challenges due to rapidly increasing globalisation is the question that concerns construction educators around the world. However, current construction management curricula do not usually provide students with even basic training on international project management. To remedy this defect, globalisation components have been incorporated into construction management education at East Carolina University through lecture exchange, study abroad, student exchange, scholar exchange, and research exchange activities. This paper presents the international activities performed, the outcomes, and student growth in international construction management.

Details

Journal of Applied Research in Higher Education, vol. 2 no. 2
Type: Research Article
ISSN: 2050-7003

Keywords

Access Restricted. View access options
Article
Publication date: 1 April 2005

Edwin H.W. Chan and Henry C.H. Suen

Unfamiliar with the Chinese culture and ways of doing business, foreign architects/engineers/contractors (AEC) firms will encounter differences with the local parties. With…

7805

Abstract

Purpose

Unfamiliar with the Chinese culture and ways of doing business, foreign architects/engineers/contractors (AEC) firms will encounter differences with the local parties. With reference to the characteristics of Chinese culture on disputes, this paper studies the problem areas of dispute and of resolving disputes in international construction projects in China. The objectives are to: examine the fundamentals of Chinese culture and ways of doing business; examine the characteristics of international projects and investigate any differences in the dispute problems arising from China International Projects; identify the most popular dispute resolution mechanism(s) for international projects in China; and recommend possible ways to reduce and resolve disputes of these projects.

Design/methodology/approach

After literature review, a questionnaire was designed for face‐to‐face interviews with 40 practitioners to collect their opinions.

Findings

The results show that the problem areas giving rise to disputes are mainly related to contractual matters. To reflect the characteristics of international projects in China, cultural and legal matters are also found to be the sources of problem. Arbitration is the most popular method, after negotiation, for resolving disputes in international construction projects in China.

Research limitations/implications

The number of interviewees in this study could be improved and further study could include experts in Mainland China.

Originality/value

There is not much literature on dispute resolution management for international construction projects in China, with particular reference to cultural differences. This paper offers an invaluable reference for those foreign AEC firms interested in joining international projects in China.

Details

Management Decision, vol. 43 no. 4
Type: Research Article
ISSN: 0025-1747

Keywords

1 – 10 of over 75000
Per page
102050