Search results

1 – 4 of 4
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 1 January 1988

Ibrahim S.J. Alhashemi

Introduction It is not always easy to define or distinguish with precision the difference between Management Education, Management Training and Management Development because each…

72

Abstract

Introduction It is not always easy to define or distinguish with precision the difference between Management Education, Management Training and Management Development because each is but one of several related and overlapping activities aimed at improving the effectiveness of organisations. For management education, together with management development, organisational development and training, aim at influencing the making of future managers or improving the performance of incumbents. One problem is the sheer vastness of the literature on the subject, the terminological confusion, the rapidly changing intellectual terrain and the elasticity of the uses of these terms reflecting multiple purposes and functions that seem to be involved.

Details

International Journal of Manpower, vol. 9 no. 1
Type: Research Article
ISSN: 0143-7720

Access Restricted. View access options
Article
Publication date: 23 March 2021

Sy Tien Do, Viet Thanh Nguyen and Chau Ngoc Dang

This study aims to discover the impact of failure factors on stakeholder coordination performance (SCP) in the finishing phase of high-rise building projects.

783

Abstract

Purpose

This study aims to discover the impact of failure factors on stakeholder coordination performance (SCP) in the finishing phase of high-rise building projects.

Design/methodology/approach

Firstly, this study identifies potential failure factors affecting coordination performance as well as criteria for measuring SCP in the finishing phase of high-rise building projects. Afterwards, a survey questionnaire is designed to collect data from high-rise building projects in Vietnam. Using the factor analysis method, the study discovers the failure constructs. A structural equation model is then built to uncover the relationships between failure constructs and SCP.

Findings

The study identified four failure constructs which could significantly affect SCP, namely traditional adversarial relationship (TAR), incompetent parties (IP), poor project planning and organization (PPO) and delays of parties toward construction works (DP). The developed model indicated that TAR, PPO and IP significantly affected stakeholders' coordination performance in the finishing phase of high-rise building projects.

Originality/value

The results of the study fill the gap in knowledge by discovering the causal relationships between failure constructs and SCP in high-rise building projects. The results might provide an initial guideline for stakeholders during the finishing phase of high-rise building projects to enhance their coordination performance.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 2 April 2021

Abdullah Khalid Abdullah and Adel Alshibani

This paper aims to develop a framework for the selection of private partners in the housing industry of Saudi Arabia under the scheme of the partnership between the public and…

267

Abstract

Purpose

This paper aims to develop a framework for the selection of private partners in the housing industry of Saudi Arabia under the scheme of the partnership between the public and private sectors.

Design/methodology/approach

By investigating criteria from a comprehensive literature review and experts input through surveys, developing further surveys incorporating decision-making methods: analytic hierarchy process (AHP) and multi-attribute utility theory (MAUT) to construct a framework for selection based on weightages and utilities.

Findings

The results identified criteria categorized under four categories: financial (C1), technical (C2), managerial (C3) and safety/environment (C4) and their sub-criteria. The study found that the main criteria were relatively close to each other in importance based on the subjective input of the experts with the technical and safety/environment criteria tying equally with 27% followed by the managerial with 24% and trailed by the financial with 22%.

Research limitations/implications

The study and surveys were conducted for the Saudi market and the experts were within the country.

Originality/value

The study contributes to the Saudi housing initiative which is a part of the 2030 Vision and provides insight to international investors who would be willing to invest in the Saudi market; and to the literature as there is a notable lack of study on public-private partnership in housing in Saudi Arabia.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Article
Publication date: 8 May 2018

Robert Osei-Kyei and Albert P.C. Chan

The public sector plays a critical role in the successful implementation of public–private partnership (PPP) projects. Thus, there is a need to holistically explore the public…

690

Abstract

Purpose

The public sector plays a critical role in the successful implementation of public–private partnership (PPP) projects. Thus, there is a need to holistically explore the public sector’s view on the implementation practices of PPP. This paper aims to explore and compare the public sector’s views on PPP practices in Ghana and Hong Kong.

Design/methodology/approach

Semi-structured interviews were conducted with PPP practitioners of senior authority in public institutions in both Ghana and Hong Kong. The interviews covered critical issues of PPP implementation practices such as motivations for engaging in PPP, success criteria/indicators, critical success factors (CSFs), external stakeholder management and training and education in PPPs.

Findings

The findings show that quick delivery of public projects and private sector efficiency are the reasons considered by both groups of interviewees. On the success criteria, interviewees from both jurisdictions mentioned user satisfaction, budget, time and quality. The CSFs mentioned by both groups include capacity building and training, project viability, proper planning and good feasibility studies. Sensitization programs, including open forums and community meetings, were mentioned by both groups as measures for managing external stakeholders. On the training and education, both groups mentioned international study tours and organizing courses and seminars.

Originality/value

The outputs of this study offer strategies that are very useful to international private developers who are interested in PPP practices in Africa and Asia. Further, the findings contribute to the knowledge on the international best practices for PPP.

Details

Journal of Facilities Management, vol. 16 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

1 – 4 of 4
Per page
102050