AMR A G Hassanein and Halaa M F Afify
This research aimed at identifying the most significant risks relevant to construction contracts of two power station projects in Egypt. These were large scale, fast‐track…
Abstract
This research aimed at identifying the most significant risks relevant to construction contracts of two power station projects in Egypt. These were large scale, fast‐track projects where a multi‐package contracting plan was utilized. Further, the study investigated how risks were perceived and managed by a large sample of Egyptian and international contractors who participated in the execution of these two major projects. A checklist of risk categories was developed to aid contractors in their risk identification effort. The compilation of this checklist identified the following risk categories: 1) owner’s obligations; 2) interface with other contractors; 3) liability risks; 4) financial risks; 5) risks related to changes; 6) technical risks and 7) consortium risks. Research results identified a marked lack of consistency in the contractors’ risk identification effort. Contractors possessing past experience in Egypt were far better able to identify the relevant risks. On the other hand, local Egyptian contractors with vast experience in Egypt but limited project management experience were shown to lack the necessary expertise to properly identify risks and to take the appropriate exceptions. Furthermore, the results revealed that bidders do not include in their proposals their “true” lists of exceptions which represent genuine risks to them.
Details
Keywords
Adwoa Boadua Yirenkyi-Fianko and Nicholas Chileshe
The purpose of this paper is to report the findings of research into the levels of awareness, usage and benefits of risk assessment and management practices (RAMP) within the…
Abstract
Purpose
The purpose of this paper is to report the findings of research into the levels of awareness, usage and benefits of risk assessment and management practices (RAMP) within the construction industry in Ghana.
Design/methodology/approach
The study was conducted through a structured questionnaire administered to 103 construction professionals practising with construction client (private and public), consultant and contractor organisations within the Ghanaian construction industry. The results were analysed to establish the current levels of awareness, usage and perceived benefits of risk management practices. Survey response data were subjected to descriptive statistics; subsequently, ANOVA and other non-parametric tests were used to examine the differences in the levels of agreement of the perceived benefits.
Findings
This study illustrates that although the majority of the respondents are aware of RAMP, some professionals found the process not to be formal. Relative to the benefits, there was a disparity in the ranking of agreement scores on two of the eight benefits among the respondents in relation to “product to the required quality” and “reduction in contract claims”. However, they all agreed on “improved team morale” as the most important benefits.
Research limitations/implications
The research limitation of the study is that the cross-sectional data made it difficult to generalise the findings. Geographically, only respondents from construction organisations in the Greater Accra Region were considered. However, it is recommended that future work on RAMP be extended to cover all the regions of the country.
Practical implications
The findings of the study provide practical for organisations to measure the benefits and capture the awareness of risk management practices through the provision of a framework based on an index and scoring method. This can be used by senior management in assessing the current benefit levels within projects “internal benchmarking” and has potential for external benchmarking purposes. Furthermore, through education and training, both formal and informal process including more information and provision of expertise within RAMP could enhance the levels of awareness.
Originality/value
Little is known about the current levels of awareness, usage and benefits of risk management among Ghanaian construction organisations, and this study provides some insights and deepening our understanding on the uptake and perceived benefits of RAMP among construction professions in Ghana. These findings may help construction practitioners in having an increased awareness of risk management practices, and this can further lead to a higher uptake and usage resulting in reaping the advocated benefits of the implementing risk management practices such as achievement of project objectives of time, cost and quality, as well as enhanced decision-making processes.