Alex Bradley, Haijiang Li, Honglei Qin, Wen Xi, Daniel Peel and Nicholas Nisbet
Defining building information modelling (BIM) standards for the infrastructure domain is a central issue to the successful implementation of BIM in civil engineering domains. To…
Abstract
Purpose
Defining building information modelling (BIM) standards for the infrastructure domain is a central issue to the successful implementation of BIM in civil engineering domains. To this end, this paper aims to present a requirements and process analysis for the ports and waterways domain to address the lack of BIM standards development, using the information delivery manual (IDM) approach and the ethos of openBIM standards.
Design/methodology/approach
This research uses the IDM approach. This involves the definition of use cases, process maps, exchange scenarios and subsequent exchange requirements. All these developments were sourced and validated by a series of international industry consultations.
Findings
The paper identifies 30 domain relevant use cases collated from existing sources and new cases. An overview and detailed ports and waterways process map (defining actors, activities and data exchanges). The process maps highlighted 38 exchange scenarios between various activities. Various exchange requirements were defined and are discussed in the context of the required information exchange model and the extensions required to fulfil the needs of the domain. The analysis provides the core information for the next steps of development for a substantial extension to the Industry Foundation Classes and the supporting data dictionary standards.
Research limitations/implications
Because of the international scope of the research, the outcomes can be applied by any stakeholders in the domain of ports and waterways. Therefore, some variation is expected at a national and organizational level. This research has the potential to accelerate the adoption of openBIM standards within the ports and waterways domain leading to increases in efficiency, collaborative working.
Originality/value
This paper reviews the requirements of an identified gap in the provision of openBIM standards relevant and applicable to the domain of ports and waterways.
Details
Keywords
Lihong Li, Haijiang Wang and Lei An
In order to avoid the waste of water resources and environmental pollution caused by separating coal and gangue in the traditional methods, a novel method based on image…
Abstract
In order to avoid the waste of water resources and environmental pollution caused by separating coal and gangue in the traditional methods, a novel method based on image processing is proposed in this paper. Firstly the image of coal or gangue is preprocessed. Then the mean value of gray histogram is extracted which serves as the statistical feature value to initially recognize coal and gangue. Then the textural feature is extracted from the image which is based on an adaptive window of texture analysis. The adaptive window size is determined by the contrast texture feature parameter. The adaptive window of texture analysis can improve the discriminability of coal and gangue. This method not only considers the image’s gray feature but also utilizes the image’s spatial information, so the recognition precision is improved. This method provides new ideas for dry separation technology.
Details
Keywords
Maria Giuffrida, Hai Jiang and Riccardo Mangiaracina
Due to its fast growth, cross-border e-commerce (CBEC) is becoming a popular internationalization model, especially in those destination markets with impressive e-commerce…
Abstract
Purpose
Due to its fast growth, cross-border e-commerce (CBEC) is becoming a popular internationalization model, especially in those destination markets with impressive e-commerce development like China. However, CBEC also brings new logistics challenges and uncertainty. This paper aims to understand how companies cope with logistics uncertainty in this field and whether the different types of uncertainty influence the risk management strategies adopted to face them.
Design/methodology/approach
A survey targeting online exporters to China and third-party forwarding logistics service providers (3PFLs) is conducted. A structural equation model (SEM) analysis is performed to test the possible relationship between the adopted risk management strategies and the types of uncertainty. The type, industry and size of the company, as well as the distance between the company's home country and China, are used as control variables in the study. Survey results are enriched via interviews with some of the respondents.
Findings
The risk management strategies adopted are dependent on the type of logistics uncertainty that the companies face and, to a minor extent, on the industry the company operates in. Conversely, no significant influence is exerted by other types of control factors, i.e. home country, company size or company type.
Originality/value
The paper investigates logistics uncertainty and risk management approaches in the novel context of CBEC. A systematic review of relevant sources of uncertainty is offered to help both scholars and practitioners understand the current complexities of CBEC. From a theoretical perspective, the paper models the investigated concepts in light of the contingency approach. From a practical perspective, results can be of interest since the list of proposed items can support risk identification and evaluation while the interviews with managers can provide insights on risk management practices.
Details
Keywords
China's defense industry is analyzed by comparing the technical level of the military and civilian products manufactured by China's nuclear, space, aviation, shipbuilding…
Abstract
China's defense industry is analyzed by comparing the technical level of the military and civilian products manufactured by China's nuclear, space, aviation, shipbuilding, ordnance, and electronics industries with their advanced counterparts. Generally, China's defense industry is about 20 years behind the global leaders. Thus, it is inappropriate to declare China's emergence as the world’s second military power. However, if it continues on its current development trajectory, it will attain that status in the near future.
Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…
Abstract
Purpose
Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.
Design/methodology/approach
A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.
Findings
The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.
Practical implications
The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.
Originality/value
This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.
Details
Keywords
Qianmai Luo, Chengshuang Sun, Ying Li, Zhenqiang Qi and Guozong Zhang
With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the…
Abstract
Purpose
With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the application of the modern risk management methods. As an emerging technology, digital twin has already made valuable contributions to safety risk management in many fields. Therefore, exploring the application of digital twin technology in construction safety risk management is of great significance. The purpose of this study is to explore the current research status and application potential of digital twin technology in construction safety risk management.
Design/methodology/approach
This study followed a four-stage literature processing approach as outlined in the systematic literature review procedure guidelines. It then combined the quantitative analysis tools and qualitative analysis methods to organize and summarize the current research status of digital twin technology in the field of construction safety risk management, analyze the application of digital twin technology in construction safety risk management and identify future research trends.
Findings
The research findings indicate that the application of digital twin technology in the field of construction safety risk management is still in its early stages. Based on the results of the literature analysis, this paper summarizes five aspects of digital twin technology's application in construction safety risk management: real-time monitoring and early warning, safety risk prediction and assessment, accident simulation and emergency response, safety risk management decision support and safety training and education. It also proposes future research trends based on the current research challenges.
Originality/value
This study provides valuable references for the extended application of digital twin technology and offers a new perspective and approach for modern construction safety risk management. It contributes to the enhancement of the theoretical framework for construction safety risk management and the improvement of on-site construction safety.
Details
Keywords
Behzad Abbasnejad, Sahar Soltani, Amirhossein Karamoozian and Ning Gu
This systematic literature review aims to investigate the application and integration of Industry 4.0 (I4.0) technologies in transportation infrastructure construction projects…
Abstract
Purpose
This systematic literature review aims to investigate the application and integration of Industry 4.0 (I4.0) technologies in transportation infrastructure construction projects focusing on sustainability pillars.
Design/methodology/approach
The study employs a systematic literature review approach, combining qualitative review and quantitative analysis of 142 academic articles published between 2011 and March 2023.
Findings
The findings reveal the dominance of Building Information Modelling (BIM) as a central tool for sustainability assessment, while other technologies such as blockchain and autonomous robotics have received limited attention. The adoption of I4.0 technologies, including Internet of Things (IoT) sensors, Augmented Reality (AR), and Big Data, has been prevalent for data-driven analyses, while Unmanned Aerial Vehicle (UAVs) and 3D printing are mainly being integrated either with BIM or in synergy with Artificial Intelligence (AI). We pinpoint critical challenges including high adoption costs, technical barriers, lack of interoperability, and the absence of standardized sustainability benchmarks.
Originality/value
This research distinguishes itself by not only mapping the current integration of I4.0 technologies but also by advocating for standardization and a synergistic human-technology collaborative approach. It offers tailored strategic pathways for diverse types of transportation infrastructure and different project phases, aiming to significantly enhance operational efficiency and sustainability. The study sets a new agenda for leveraging cutting-edge technologies to meet ambitious future sustainability and efficiency goals, making a compelling case for rethinking how these technologies are applied in the construction sector.
Details
Keywords
Supalak Phonphithak, Narin Hiransuthikul, Penchan Pradubmook Sherer and Sasithorn Bureechai
This aim of this study was to explore the experiences of stigmatization and coping mechanisms during pregnancy among pregnant women who are living with HIV in Thailand. The…
Abstract
Purpose
This aim of this study was to explore the experiences of stigmatization and coping mechanisms during pregnancy among pregnant women who are living with HIV in Thailand. The secondary objective was to determine factors contributing to stigma during motherhood among HIV-infected women as well as explore how they cope with the discrimination from society.
Design/methodology/approach
Qualitative data were collected using in-depth interviews to obtain different versions of stigmatized experience from 16 pregnant women living with HIV on stigmatization and coping mechanisms. There were 5 pregnant adolescents living with HIV and 11 adult pregnant women living with HIV. The content analysis was used to examine patterns of stigmatizations and attributed factors.
Findings
Personal stigma was found among pregnant women living with HIV regardless of age. HIV status disclosure was the crucial barrier of accessing to care for people experiencing stigmatizations. Personal stigma associated with higher HIV status was not disclosed. Interestingly, all teenage mothers who participated in this study disclosed their HIV-status to their family. People who have social support especially from family and significant others are found to be able to cope and get through the difficulties better than those who lack those social support.
Originality/value
This study yields outcomes similar to several other studies that have been conducted either in Thailand or other countries. This study found that family support was crucial in reducing HIV stigma. Furthermore, HIV-infected pregnant female adults were more afraid to disclose their HIV status to their husbands, other family members and their work colleagues.