Search results

1 – 1 of 1
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 10 October 2016

Franco Jefferds dos Santos Silva, Herbert Ricardo Garcia Viana and André Nasser Aquino Queiroz

The purpose of this paper is to present a methodology for forecasting the availability off-highway trucks used in a fleet for large transport operations of ore and sterile rock…

597

Abstract

Purpose

The purpose of this paper is to present a methodology for forecasting the availability off-highway trucks used in a fleet for large transport operations of ore and sterile rock from an open pit mine.

Design/methodology/approach

This methodology enables the estimation of the number of hours of preventive and corrective maintenance required, which are used to predict truck availability. The authors used historical data for the maintenance strategy based on the hours of operation.

Findings

These data are statistically analyzed to obtain the key quantities and statistical models required to project availability and to develop equipment replacement plans.

Originality/value

A methodology for forecasting availability to assets in open pit mining industry was implemented.

Details

Journal of Quality in Maintenance Engineering, vol. 22 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 1 of 1
Per page
102050