Search results
1 – 5 of 5John Aliu, Ayodeji Emmanuel Oke, Onoriode Austin Odia, Prince O. Akanni, Feyisetan Leo-Olagbaye and Clinton Aigbavboa
Recognizing the importance of sustainable development, environmental economic practices have gained significant attention globally as effective measures to mitigate environmental…
Abstract
Purpose
Recognizing the importance of sustainable development, environmental economic practices have gained significant attention globally as effective measures to mitigate environmental degradation and promote resource conservation. Therefore this study identifies and evaluates the barriers hindering the implementation of environmental economic practices in the Nigerian construction industry.
Design/methodology/approach
A quantitative research approach, utilizing a well-structured questionnaire, was employed to collect data from construction professionals. The Shapiro-Wilk normality test was utilized to assess the normality of the data, while the Kruskal-Wallis H-test was employed to investigate potential significant differences in opinions among various categories of respondents. Subsequently, exploratory factor analysis was conducted to identify underlying patterns and relationships within the collected data.
Findings
The top five barriers were: prioritization of short-term financial gain over long-term benefits, inefficient and unreliable energy supply systems, inadequate disposal and management of waste, insufficient funding and investment and high costs associated with sustainable construction practices. Furthermore, four critical clusters of barriers were revealed, which are regulatory-related, financial and economic-related, technical and logistical-related and knowledge-related.
Practical implications
These clusters can guide policymakers, industry professionals and educators in developing tailored strategies to overcome barriers within each specific category, fostering a more holistic and effective approach toward sustainable practices in the construction sector.
Originality/value
The findings of this study were compared with results from similar cases in Iran, China and New Zealand to provide a cross-cultural perspective on challenges faced by different regions. This comparative analysis aims to identify both commonalities and unique factors, contributing to a much deeper understanding of sustainable construction practices on a global scale.
Details
Keywords
Ayodeji Emmanuel Oke, John Aliu, Doyin Helen Agbaje, Andrew Ebekozien, Douglas Omoregie Aghimien, Feyisetan Leo-Olagbaye and Clinton Aigbavboa
The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality…
Abstract
Purpose
The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality (IEQ) principles into building designs.
Design/methodology/approach
The study used a quantitative approach by administering a well-structured questionnaire to 114 quantity surveyors. The collected data were analyzed using methods such as frequencies, percentages, mean item scores, Kruskal–Wallis test and exploratory factor analysis.
Findings
The top five ranked constraints were limited access to funding or financing options, limited availability of green materials, limited availability of insurance for sustainable buildings, limited availability of sustainable design resources and limited diversity and inclusivity within the design profession. Based on the factor analysis, the study identified six clusters of constraints: structural-related constraints, technical-related constraints, financial-related constraints, capacity-related constraints, legal-related constraints and culture-related constraints.
Practical implications
This study has several practical implications for quantity surveying firms, policymakers and industry stakeholders involved in building design and construction in Nigeria. The findings of this study can also inform future research on the integration of IEQ principles into building designs.
Originality/value
By identifying and structuring the clusters of constraints faced by quantity surveying firms in Nigeria when implementing IEQ principles, this study provides a novel approach to understanding the challenges associated with IEQ implementation in the building sector. This understanding can guide policymakers, industry stakeholders and quantity surveying firms in developing effective strategies to overcome these constraints and promote IEQ principles in building design and construction.
Details
Keywords
Ayodeji Emmanuel Oke, John Aliu, Patricia Fadamiro, Feyisetan Leo-Olagbaye, Paramjit Singh Jamir Singh and Mohamad Shaharudin Samsurijan
Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their…
Abstract
Purpose
Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their application within specific local contexts, especially in developing countries like Nigeria, is sparse. Nigeria presents a unique context marked by challenges such as skilled labor shortage, safety concerns and cost efficiency. Therefore, investigating the implementation of automation techniques in the Nigerian construction industry is crucial to address these challenges, bring transformative advancements and contribute to a more balanced global discourse on automation adoption. This study aims to fill this significant research gap.
Design/methodology/approach
A mixed research method was deployed which combined both qualitative and quantitative data collection and analysis. Two focus group discussions conducted with 23 experts from both industry and academic institutions (qualitative) yielded 17 drivers which were used to formulate a well-structured questionnaire (quantitative), which was disseminated to construction professionals. Collected data underwent analysis through various statistical techniques, including percentages, frequencies, mean item scores and exploratory factor analysis.
Findings
Principal component analysis (PCA) yielded four driver clusters namely: (1) performance-related drivers, (2) visualization and efficiency-related drivers, (3) technological and human-related drivers and (4) economic-related drivers.
Practical implications
The study provides empirical insights that can aid stakeholders, decision-makers, policymakers and the government in formulating strategies to promote automation techniques in the Nigerian construction industry and beyond.
Originality/value
This study's originality lies in its exploration of the untapped potential of automation techniques in the Nigerian construction industry, offering novel perspectives on how these technologies can address specific challenges such as skilled labor shortage, safety concerns and cost efficiency, thereby paving the way for transformative advancements in the sector.
Details
Keywords
Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…
Abstract
Purpose
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.
Design/methodology/approach
The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.
Findings
Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.
Research limitations/implications
This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.
Practical implications
The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.
Originality/value
The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.
Details
Keywords
Feyisetan Leo-Olagbaye and Henry A. Odeyinka
Road projects have been characterized by risk factors impacting project objectives. Thus, this paper focused on evaluating the effect of risk on cost and time performance of some…
Abstract
Purpose
Road projects have been characterized by risk factors impacting project objectives. Thus, this paper focused on evaluating the effect of risk on cost and time performance of some selected road projects.
Design/methodology/approach
Using the theory of two-dimensional nature of risk, a questionnaire was used to collect data from 146 stakeholders involved in road projects in Osun State, Nigeria. Secondary data regarding cost and time performance of 40 selected road projects were also collected. The data collected were used to determine significant risk factors and also to develop multi-linear regression models for evaluating risk impact on cost and time performance of road projects.
Findings
Results showed that scope creep and design issues are major risk factors occurring on road projects and those political and economic factors provide higher order of impact. It further demonstrated the possibility of modelling risk impact on cost and time performance of road projects using significant risk factors.
Practical implications
The knowledge of the identified significant risk factors provides invaluable information to stakeholders regarding what risk variables to focus attention on in road construction. The developed models are also potential practical tools for decision-making.
Originality/value
The study provides a veritable tool for risk assessment that potentially helps with predicting risk impact on cost and time performance of road projects.
Details