Search results

1 – 2 of 2
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 21 November 2016

Faikcan Kog and Hakan Yaman

The selection of the contractor, as a main participant of a construction project, is the most important and challenging decision process for a client. The purpose of this paper is…

914

Abstract

Purpose

The selection of the contractor, as a main participant of a construction project, is the most important and challenging decision process for a client. The purpose of this paper is to propose a multi-agent systems (MAS)-based contractor pre-qualification (CP) model for the construction sector in the frame of the tender management system.

Design/methodology/approach

The meta-classification and analysis study of the existing literature on CP, contractor selection and criteria weighting issues, which examines the current and important CP criteria, other than price, is introduced structurally. A quantitative survey, which is carried out to estimate initial weightings of the identified criteria, is overviewed. MAS are used to model the pre-qualification process and workflows are shown in Petri nets formalism. A user-friendly prototype program is created in order to simulate the tendering process. In addition, a real case regarding the construction work in Turkey is analyzed.

Findings

There is a lack of non-human-driven solutions and automation in CP and in the selection problem. The proposed model simulates the pre-qualification process and provides consistent results.

Research limitations/implications

The meta-classification study consists of only peer-reviewed papers between 1992 and 2013 and the quantitative survey initiates the perspectives of the actors of Turkish construction sector. Only the traditional project delivery method is selected for the proposed model, that is other delivery methods such as design/build, project management, etc., are not considered. Open, selective limited and negotiated tendering processes are examined in the study and the direct supply is not considered in the scope.

Practical implications

The implications will help to provide an objective CP and selection process and to prevent the delays, costs and other troubles, which are caused by the false selection of a contractor.

Originality/value

Automation and simulation in the pre-qualification and the selection of the contractor with a non-human-driven intelligent solution ease the decision processes of clients in terms of cost, time and quality.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Available. Content available
Article
Publication date: 21 November 2016

Timo Hartmann

438

Abstract

Details

Engineering, Construction and Architectural Management, vol. 23 no. 6
Type: Research Article
ISSN: 0969-9988

1 – 2 of 2
Per page
102050