Search results
1 – 10 of 71David John Edwards, De-Graft Owusu-Manu, Bernard Baiden, Edward Badu and Peter Edward Love
In developing countries, delays in highway infrastructure projects caused by financial distress-related factors threaten the construction industry’s capacity to contribute…
Abstract
Purpose
In developing countries, delays in highway infrastructure projects caused by financial distress-related factors threaten the construction industry’s capacity to contribute optimally to economic development. Against this backdrop, this paper aims to determine factors contributing to financial distress and develops a conceptual framework to illustrate the relationship between financial distress and project delay.
Design/methodology/approach
A questionnaire survey collected data on factors that contributed to financial distress and delays in highway infrastructure delivery. In total, 78 responses were obtained, and factor analysis revealed that factors associated with payment, project financing, cash flow, economic issues, project planning and cost control influenced project delays.
Findings
The research identifies the importance of efficient public and private policies to engender financial sustainability among construction firms in developing countries.
Originality/value
This work presents the first research of its kind and strives to engender wider academic debate and renewed economic development in some of the world’s most impoverished nations.
Details
Keywords
Frederick Owusu Danso, Kofi Agyekum, Patrick Manu, Emmanuel Adinyira, Divine K. Ahadzie and Edward Badu
Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences…
Abstract
Purpose
Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences site workers' risk-taking behaviours during construction. This study aims to examine how construction site workers perceive and judge safety risks in risk-taking behaviours of site workers for intervention safety policy framework that may encourage safe work.
Design/methodology/approach
The study employed Pictorial-based Q-Methodology, which documented 63 picture scenarios of risk-taking behaviours from building sites and submitted them for validation from H&S inspectors. In total, 33 pictures emerged as having great potential to cause harm. After using these 33 pictures to elicit data from randomised site workers, the study used Frequency Tabulation, Relative Importance Index (RII) and Kruskal–Wallis Test to analyse the collected data. To fully explain the analysed data for deeper understanding, the study conducted Focus Group Discussions (FGDs) with these site workers to share the thoughts of site workers on these pictures.
Findings
Two distinctive pictures emerged from these analyses: one showing risk-taking behaviour likely to contract internal and skin disease and the other likely to fall from height. One of the implications is that construction site workers are unfamiliar with the dangerous contaminants in the materials the site workers use to work, which can potentially harm the site workers' skin and internal organs. Hence, site workers continue engaging in risk-taking behaviours. The other is that site workers are aware of and can mention catastrophic physical injuries attached to site workers' jobs. However, site workers continue engaging in risk-taking behaviours because of site workers' safety plights and rely on the favour and mercies of a supreme being as coping strategies to escape from these physical injuries.
Originality/value
This study is original in that the study uses picture scenarios of risk-taking behaviours to amass an empirical-based understanding of how site workers perceive and respond to H&S risks during construction. This piece of evidence is missing in the numerous research studies in this area. Again, the findings contribute to the state-of-the-art literature regarding risk-taking behaviours on construction sites.
Details
Keywords
Francis Lanme Guribie, De-Graft Owusu-Manu, Edward Badu and David John Edwards
There is a clear gap in the literature regarding the factors that determine social conductivity (extent of interactions) in project relationships. This study aims to use social…
Abstract
Purpose
There is a clear gap in the literature regarding the factors that determine social conductivity (extent of interactions) in project relationships. This study aims to use social capital theory to answer the research question – What factors determine social conductivity in project relationships?
Design/methodology/approach
In the study, the authors use fuzzy synthetic evaluation based on the findings from a survey of 203 project practitioners to quantify the impacts of three principal components of factors determining social conductivity in project relationships.
Findings
The study findings reveal the structural, relational and cognitive dimensions of project social capital are all significant (impact levels exceeding 3.50) for determining social conductivity in project relationships. However, the study’s main finding reveals – issues relating to the cognitive dimension of project social capital are the most critical factors determining social conductivity in project relationships (a criticality index of 4.326).
Practical implications
This study provides evidence of varieties of ways social capital can boost the conductivity of project relationships.
Originality/value
The key contributions of this study are linked to the manner in which project social capital determines social conductivity in project relationships. The findings add to previous research by extending the dimensions of the factors that increase social conductivity from relational project social capital to include two new dimensions (the cognitive and structural dimensions of project social capital).
Details
Keywords
Ernest Kissi, Theophilus Adjei-Kumi, Edward Badu and Emmanuel Bannor Boateng
Tender price remains an imperative parameter for clients in deciding whether to invest in a construction project, and it serves as a basis for tender price index (TPI…
Abstract
Purpose
Tender price remains an imperative parameter for clients in deciding whether to invest in a construction project, and it serves as a basis for tender price index (TPI) manipulations. This paper aims to examine the factors affecting tender price in the construction industry.
Design/methodology/approach
Based on the literature review, nine independent constructs and one dependent construct relating to tender pricing were identified. A structured questionnaire survey was conducted among quantity surveyors in Ghana. Partial least squares structural equation modelling (PLS-SEM) examined the influences of various constructs on tender price development (TPD) and the relationships among TPD and TPI.
Findings
Results showed that cultural attributes, client attributes, contractor attributes; contract procedures and procurement methods; consultant and design team; external factors and market conditions; project attributes; sustainable and technological attributes; and TPI have a positive influence on tender price, whereas fraudulent attributes exert a negative influence.
Practical implications
The findings offer construction professionals broader understanding of factors that affect tender pricing. The results may be used in professional decision-making in the pricing of construction projects, as they offer clearer causal relations between how each construct will influence pricing.
Originality/value
This study adds to the body of construction pricing knowledge by establishing the relationships and degree of influences of various factors on tender price. These findings provide a valuable reference for practitioners.
Details
Keywords
Joseph Asante, Ernest Kissi and Edward Badu
The needs assessment is the heart of any capacity-building strategy since it determines the design of any intervention, and also helps to prioritise the allocation of resources…
Abstract
Purpose
The needs assessment is the heart of any capacity-building strategy since it determines the design of any intervention, and also helps to prioritise the allocation of resources. Whereas there is a considerable amount of literature on the challenges faced by small- and medium-scale building contractors (SMBCs), very little is known about the needs (support) required by SMBCs. But given the critical role played by SMBCs in the construction industry demands, an understanding of how this sector can be assisted is required. The purpose of this paper is to contribute to the literature relative to capacity building of SMBCs by exploring and examining the needs with the objective to extend the understanding on how to promote and sustain SMBCs to continue their infrastructural delivery at the local and rural areas in Ghana.
Design/methodology/approach
A questionnaire with five-point Likert scale is administered to 416 respondents, including local government authorities, consultants, first-class contractors and SMBCs using simple random and purposive sampling techniques. Data generated from the survey are analysed using mean score ranking and principal component analysis, thus enabling the findings of the study to be examined under six thematic areas.
Findings
The SMCs needs identified include anti-corruption measures, job accessibility, technical and technological assistance, favourable fiscal policy, business development support and financial assistance. The findings of the study bring to the attention of policy makers the critical areas that required support by the assistance of SMBCs. In the interim, the study recommends the extension of business advisory services to the SMBCs by National Board of Small-Scale Industries, whilst in the long term, the government must create the necessary business operating environment to promote SMBCs pertaining to the industrial sector of the economy. The SMBCs must also factor the needs into their business operations that can be addressed from within.
Originality/value
The study suggests the need of SMBCs in building a robust construction industry in developing countries.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and Eric Asamoah
The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private…
Abstract
Purpose
The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private partnership (PPP) projects, are more complex and essential in developing countries. Appreciating the inter relationship among these risk factors is crucial. However, there exist no studies developing quantitative models to explain how various PPP power risk factors influence each other, especially in developing countries like Ghana. This study aims to investigate and model the relationship, the probability of occurrence and severity of impact of PPP power risk factors in Ghana.
Design/methodology/approach
Data were collected through ranking type questionnaire in a two-round Delphi survey with 48 respondents using purposive and snowball sampling techniques. partial least squares structural equation modelling (PLS-SEM) was used for analysis of data.
Findings
A model was developed to investigate the influence the risk factors inherent in PPP power projects have on each other. Validity of the model was tested based on the data collected. PLS-SEM results indicated the various relationships and interdependencies the risk factors had on each other considering their probability and severity. Both significant and insignificant levels of relationships were found among the various risk factors.
Practical implications
The SEM that was developed to assess the relationships among the risk factors has great value for policy makers in the energy sector, industry practitioners, researchers and industry practitioners. Strategies can be mapped out to mitigate and effectively allocate the risks with the high interdependencies.
Originality/value
Regarding the quantitative impact of the interrelationship among risk factors in PPP power projects, the findings of this research are arguably the first to be presented for the construction sector and contribute to knowledge on PPP practice and further has implications toward achieving power sector risk mitigation.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards
This paper aims to evaluate the risk factors and determines the overall risk level (ORL) of public-private-partnership (PPP) power projects in Ghana using fuzzy synthetic…
Abstract
Purpose
This paper aims to evaluate the risk factors and determines the overall risk level (ORL) of public-private-partnership (PPP) power projects in Ghana using fuzzy synthetic evaluation methodology (FSEM).
Design/methodology/approach
In this paper review of literature led to the development of a 67-factor risk list which was ranked by experts and industry practitioners through a questionnaire survey.
Findings
These factors were grouped into principal risk factors (PRFs) using component analysis and they served as the input variables for fuzzy analysis. The seven components were: Contract and Payment risks, Environmental risks, Financial and Cost risks, Legal and Guarantee risks, Operation risks, Socio-Political and Performance risks (SPR) and Tender and Negotiation risks. Study showed that the ORL of Ghanaian PPP power projects is high implying they are risky to both the public and private sectors. Fuzzy analysis also confirmed SPR as the most critical principal factor.
Originality/value
This study is significant and demonstrates that fuzzy methodology can be used as a useful risk evaluation tool and risk assessment framework for private investors, policy makers and public sector.
Details
Keywords
Lee Felix Anzagira, Daniel Duah, Edward Badu, Eric Kwame Simpeh, Samuel Amos-Abanyie and Alexander Marful
Green building (GB) is globally acclaimed as the most formidable solution to the adverse effects that buildings and construction activities have on the climate and environment…
Abstract
Purpose
Green building (GB) is globally acclaimed as the most formidable solution to the adverse effects that buildings and construction activities have on the climate and environment. Nonetheless, current evidence suggests that the adoption of GB in developing countries of Sub-Saharan Africa (SSA) is at a snail’s pace and characterized by the absence of GB codes and frameworks. This paper aims to determine the current level of adoption and implementation of GB concepts and technologies in the Ghanaian construction industry (GCI).
Design/methodology/approach
An exploratory method of investigation involving a quantitative approach was used to achieve the objectives of this study. A literature review was conducted, and a questionnaire survey was conducted among 292 stakeholders in the GCI. The survey data was analyzed using descriptive and inferential statistics as well as other quantitative analysis techniques.
Findings
The analysis revealed that the five most applied green building technologies (GBTs) are technologies for optimizing site planning, building orientation and configuration, use of natural ventilation, integrative use of natural lighting with electric lighting systems, application of energy-efficient lighting systems and use of permeable paving: low-traffic areas. Notably, the majority of the GBTs belong to the energy-efficiency technologies category.
Research limitations/implications
The findings indicate that GBTs are gaining momentum in Ghana and that there is a need for ongoing research to develop new and more environmentally friendly building technologies to aid in the preservation of our society and natural resources to achieve United Nations Sustainable Development Goals (UN SDGs) 12 and 13.
Originality/value
In effect, this study will enhance the awareness of GB development and contribute to the GB body of knowledge, particularly in the context of developing countries. It would also be useful to the GCI’s contribution to achieving the UN SDGs.
Details
Keywords
Francis Lanme Guribie, Dr. De-Graft Owusu-Manu, Edward Badu and David John Edwards
The purpose of the study is to demonstrate the influences of three dimensions of social capital (the structural, relational and cognitive dimensions) on five situated learning…
Abstract
Purpose
The purpose of the study is to demonstrate the influences of three dimensions of social capital (the structural, relational and cognitive dimensions) on five situated learning processes (institutionalization, socialization, knowledge articulation, experience accumulation and knowledge reuse) in projects.
Design/methodology/approach
Drawing on a cross sectional survey, data were drawn from 203 construction professionals in Ghana who have hands-on experience in managing projects. Partial least square structural equation modeling was used to conduct both confirmatory factor analysis and path analysis of the structural model of the relationship between these two constructs.
Findings
In relation to the research questions, all three dimensions of social capital have effects of the situating learning processes. However, the research’s key finding is that the relational dimension of social capital exerts much influence on the situated learning processes in projects, with the structural and cognitive dimensions of social capital exerting medium and small effects, respectively.
Practical implications
The study’s key finding implies that – addressing the “relational” conditioners that moderate project participants’ behaviour in social relationships is critical for increasing situated learning activity in projects. These must, however, be complemented by both structural and cognitive factors.
Originality/value
The research findings expand existing frontiers of knowledge by addressing the gap in the literature on the lack of practical demonstration of the influences exerted by the various dimensions of social capital on a situated learning activity in projects.
Details
Keywords
Lee Felix Anzagira, Daniel Yaw Addai Duah, Edward Badu, Eric Kwame Simpeh, Alexander B. Marful and Samuel Amos-Abanyie
In Ghana, the adoption and application of green building concepts and technologies have not been fully explored. The study aimed to look into the key barriers and how they affect…
Abstract
Purpose
In Ghana, the adoption and application of green building concepts and technologies have not been fully explored. The study aimed to look into the key barriers and how they affect this.
Design/methodology/approach
Purposive and snowball sampling techniques were used to select a total of 292 construction industry stakeholders in Ghana who provided information via a questionnaire survey used for the data collection. Exploratory factor analysis and Partial least squares structural equation modelling (PLS-SEM) were used for computing the data analyses.
Findings
According to the study findings, the top five most critical barriers to the uptake of green building concepts and technologies (GBCs and Ts) in Ghana are: lack of government incentives/supports for implementing green building technologies (GBTs), lack of knowledge and awareness of GBTs and their benefits, lack of GBTs databases and information, Lack of green building (GB) expertise/skilled labour and Higher costs of GBTs. Principal Component Factor Analysis was used to further analyse the data, which allowed for the reduction of the 27 (27) factors to just four (4) underlying critical barriers: (1) government and knowledge-associated barriers, (2) technical barriers, (3) cost and finance barriers and (4) stakeholders’ attitude barriers. PLS-SEM techniques were used to analyse this collection of barriers, and the results showed that stakeholders’ attitude-associated barriers and cost and finance-related barriers have a significant negative influence on the uptake of GBCs and Ts in Ghana. This study’s findings have provided empirical evidence of the critical barriers to the uptake of GBCs and Ts from all stakeholders. Stakeholders desirous of implementing GBCs and Ts would work against the negative influences on the uptake of GBCs and TS.
Originality/value
Although there has been an abundance of research to examine the critical barriers to GB, however, the uniqueness of this study is nested in modelling the influence of the barriers on the adoption of GBCs and Ts using the PLS-SEM path modelling.
Details