Search results

1 – 10 of over 6000
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 4 July 2017

Rita Henriikka Lavikka, Teemu Lehtinen and Daniel Hall

This study aims to increase understanding about the co-creation of digital facilities management (FM) services with and for FM during a construction project.

1039

Abstract

Purpose

This study aims to increase understanding about the co-creation of digital facilities management (FM) services with and for FM during a construction project.

Design/methodology/approach

The paper reports a case study on the co-creation of a digital facilities management service during the Mission Bay medical center construction project for the University of California, San Francisco. The sub-contractors and the FM team co-created a quick-response (QR) code system for valves on the project. This digital service is now used by the FM team for training purposes and in emergency situations when information on valves and their service areas is quickly needed. Researchers made on-site observations, conducted 84 interviews and reviewed archival data in 2012, 2014 and 2016.

Findings

The findings show that a successful co-creation process consists of three elements: a dialogue between the project parties, the creation of shared context between the project parties and the creation of shared understanding about the FM’s needs and the service providers’ ways of satisfying those needs. The study describes ways to promote these elements.

Originality/value

Previous studies emphasize the need for digital FM but few explain how FM teams can be involved in creating digital services for them. This paper describes how to co-create digital FM services with and for FM in the context of a construction project.

Details

Facilities, vol. 35 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Access Restricted. View access options
Article
Publication date: 1 June 2023

Firehiwot Kedir, Daniel M. Hall, Sara Brantvall, Jerker Lessing, Alexander Hollberg and Ranjith K. Soman

This paper aims to conduct a qualitative assessment of synergies between information flows of a multifamily product platform used for industrialized housing and materials…

562

Abstract

Purpose

This paper aims to conduct a qualitative assessment of synergies between information flows of a multifamily product platform used for industrialized housing and materials passports that can promote a circular economy in the construction industry.

Design/methodology/approach

Using a single case study method, the research assesses the availability and accessibility of materials passport-relevant information generated by a leading Swedish industrialized housing construction firm. Data is collected using semistructured interviews, document analysis and an extended research visit.

Findings

The research findings identify the functional layers of the product platform, map the information flow using a process diagram, assess the availability and accessibility of material passport relevant information by lifecycle stage and actor, and summarize the key points using a SWOT (strengths, weaknesses, opportunities and threats) analysis.

Research limitations/implications

The three main implications are: the technical and process platforms used in industrialized construction allow for generating standardized, digital and reusable information; the vertical integration of trades and long-term relationships with suppliers improve transparency and reduce fragmentation in information flows; and the design-build-operate business model strategy incentivizes actors to manage information flows in the use phase.

Practical implications

Industrialized construction firms can use this paper as an approach to understand and map their information flows to identify suitable approaches to generate and manage materials passports.

Originality/value

The specific characteristics of product platforms and industrialized construction provide a unique opportunity for circular information flow across the building lifecycle, which can support material passport adoption to a degree not often found in the traditional construction industry.

Details

Construction Innovation , vol. 24 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Access Restricted. View access options
Article
Publication date: 29 July 2020

Qian Chen, Daniel Mark Hall, Bryan Tyrone Adey and Carl Thomas Haas

Managing stakeholders' reciprocal interdependencies is always a challenging issue. Stakeholders need to find out different ways to communicate information and coordinate material…

2458

Abstract

Purpose

Managing stakeholders' reciprocal interdependencies is always a challenging issue. Stakeholders need to find out different ways to communicate information and coordinate material flows during the supply chain processes. Many recent studies have advanced construction supply chain coordination from multiple perspectives. However, the field still lacks a comprehensive analysis to summarize existing research, to explicitly identify all the possible enablers for coordination and to investigate how the enablers can be carried out at the supply chain interfaces. To fill the gap, this study aims to conduct a systematic review in order to examine the relevant literature.

Design/methodology/approach

A systematic literature review process was conducted to identify and synthesize relevant publications (published in the past 20 years) concerning the coordination of construction supply chain functions. These publications were coded to link main research findings with specific enabler categories. In addition, how these enablers can be used at the interfaces across supply chain processes was reviewed with an in-depth analysis of reciprocal communications between stakeholders at design-to-production, production-to-logistics and production-to-site-assembly phases.

Findings

The coordination enablers were classified into three categories: (1) contractual enablers (including subtopics on relational contracts and incentive models), (2) procedural enablers (including subtopics on multiagent knowledge sharing systems and the last planner system) and (3) technological enablers (including subtopics on linked databases for design coordination, design for manufacturing software platforms and automated monitoring technologies). It was found that interfacing different functions requires a certain level of integration of stakeholders for quick response and feedback processes. The integration of novel contractual forms with digital technologies, such as smart contracts, however, was not adequately addressed in the state of the art.

Research limitations/implications

The scope of the systematic review is limited to the static analysis of selected publications. Longitudinal studies should be further included to sharpen the inductions of enablers considering organizational changes and process dynamics in construction projects.

Practical implications

Different enablers for coordination were summarized in a concise manner, which provides researchers and project stakeholders with a reinforced understanding of various ways to manage reciprocal interdependencies at different supply chain interfaces.

Originality/value

This study constitutes an important input for research on the construction supply chain by illuminating the thematic topic of coordination from inductively developed review processes, which included a holistic framing of the emerging coordination enablers and their use across supply chain functions. Consequently, it closes some identified knowledge gaps and offers additional insights to improve the supply chain performance of construction projects.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 5 April 2021

Qian Chen, Bryan T. Adey, Carl T. Haas and Daniel M. Hall

The dynamic nature and complexity of construction projects make it challenging to ensure that the engineer-to-order (ETO) materials supplied onsite match changing needs. The quick…

1005

Abstract

Purpose

The dynamic nature and complexity of construction projects make it challenging to ensure that the engineer-to-order (ETO) materials supplied onsite match changing needs. The quick and efficient communication of required changes in material fabrication, delivery and use, due to changes in the design and construction schedules, is needed to address the challenges. This study aims to provide a novel integrated management framework with its embedded informatics to help major stakeholders efficiently absorb agility during communication to deal with required changes and improve workflows.

Design/methodology/approach

An integrated management framework is developed that integrates the milestones in look-ahead plans and structured iterative processes for major supply chain stakeholders to quickly disseminate information emanating from changes in design, schedules, production and transportation. A prototype system is devised including the informatics to support the framework, which consists of BIM-RFID functional modules and a central database and uses a client-server architecture. The usefulness of the prototype is illustrated using a construction of part of a fictive but realistic high-rise building.

Findings

The integrated management framework with the informatics provides major stakeholders with the ability to coordinate their activities efficiently and stimulate their agility (measured by process time) in planning and controlling material information. Although only a fictive example was used, it is shown that the use of the system is likely to result in a substantial reduction in the time required to deal with required changes when delivering ETO materials onsite (by 18% in the example).

Research limitations/implications

The functionalities of the prototype system can be easily scaled up to coordinate changes in the design and scheduling of other types of materials. More functional developments are needed to show the extent of the possible improvement for entire construction projects. Future work should focus on investigating the possible improvements for other types and sizes of construction projects, and eventually in real-world construction projects.

Practical implications

By fitting the look-ahead plans into structured iterative processes through digital data sharing, stakeholders increased their capability to quickly capture required change information and resolve associated problems. This is particularly useful for the management of ETO supply chain processes, where prefabricated elements such as ductwork, plumbing, and mechanical systems typically have to be modified because of last-minute design and schedule changes.

Originality/value

Unlike traditional information technology (IT) based supply chain management practices, this research is characterized by a process-centered management framework that provides explicit decision points over iterative planning processes for major stakeholders to manage material information. The iterations through digital data sharing allow stakeholders to quickly respond to last-minute changes on site, which fundamentally achieves workflow agility in the construction supply chain context.

Details

Construction Innovation , vol. 22 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Access Restricted. View access options
Article
Publication date: 9 June 2020

Qian Chen, Bryan T. Adey, Carl Haas and Daniel M. Hall

Building information modelling (BIM) and radio frequency identification (RFID) technologies have been extensively explored to improve supply chain visibility and coordination of…

1834

Abstract

Purpose

Building information modelling (BIM) and radio frequency identification (RFID) technologies have been extensively explored to improve supply chain visibility and coordination of material flow processes, particularly in the pursuit of Industry 4.0. It remains challenging, however, to effectively use these technologies to enable the precise and reliable coordination of material flow processes. This paper aims to propose a new workflow designed to include the use of detailed look-ahead plans when using BIM and RFID technologies, which can accurately track and match both the dynamic site needs and supply status of materials.

Design/methodology/approach

The new workflow is designed according to lean theory and is modeled using business process modeling notation. To digitally support the workflow, an integrated BIM-RFID database system is constructed that links information on material demands with look-ahead plans. The new workflow is then used to manage material flows in the erection of an office building with prefabricated columns. The performance of the new workflow is compared with that of a traditional workflow, using discrete event simulations. The input for the simulations was derived from expert opinion in semi-structured interviews.

Findings

The new workflow enables contractors to better observe on-site status and differences between the actual and planned material requirements, as well as to alert suppliers if necessary. The simulation results indicate that the new workflow has the potential to reduce the duration of the material flow processes by 16.1% compared with the traditional workflow.

Research limitations/implications

The new workflow is illustrated using a real-world-like situation with input data based on expert opinion. Although the workflow shows potential, it should be tested on a real-world site.

Practical implications

The new workflow allows project participants to combine detailed near-term look-ahead plans with BIM and RFID technologies to better manage material flow processes. It is particularly useful for the management of engineer-to-order components considering the dynamic site progress.

Originality/value

The research improves on existing research focused on using BIM and RFID technologies to improve material flow processes by showing how the workflow can be adapted to use detailed look-ahead plans. It reinforces data-driven construction material management practices through improved visibility and reliability in planning and control of material flow processes.

Access Restricted. View access options
Article
Publication date: 11 November 2019

Marcella M. Bonanomi, Daniel M. Hall, Sheryl Staub-French, Aubrey Tucker and Cinzia Maria Luisa Talamo

The purpose of this paper is to understand the impact of digital technologies adoption on the forms of organization of large architecture and engineering (A/E) firms. Network…

3895

Abstract

Purpose

The purpose of this paper is to understand the impact of digital technologies adoption on the forms of organization of large architecture and engineering (A/E) firms. Network theory has attracted scholarly and managerial attention, particularly from the perspective of the changes of project organization. However, little research focuses on network theory as a lens for understanding and managing the new forms of firms’ organization. Additionally, conventional organizational analyses are hampered by the lack of methods for understanding the changes in roles and relationships due to the adoption of digital technologies and examining their impact on organizational structures.

Design/methodology/approach

To address this gap, this research adopted a mixed-method case-study approach. This approach combined interviews, regular check-ins, and document analysis with data mining and social network analysis (SNA) to capture the changes of intra-organizational roles and relationships and for understanding their impact on the firm’s organizational structure. Using the data gathered, the authors created a dendrogram that shows the formal organizational structure, a sociogram that displays the informal organizational structure and a network map that visualizes the interplay between the two structures.

Findings

From this analysis, the authors identified four main findings: informal roles – as go-to people for advice and information about digital technologies – play within A/E firms facing digital transformation; such go-to people operate through informal networked relationships and beyond their formal roles; most of these relationships do not overlap with the formal reporting relationships; the combination of both these roles and relationships create an informal social network. The authors also show how managers can use SNA to understand the changes in roles and relationships due to the adoption of digital technologies and to diagnose their impact on organizational structures.

Originality/value

This research contributes to the literature of organizational design and change management from a network perspective in the context of the digital transformation of large A/E firms. It provides a systematic data-driven approach to understanding the changes of intra-organizational roles and relationships within A/E firms facing digital transformation and to diagnosing the impact of these changes on firms’ organizational structures.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 20 June 2016

Daniel Hall

The purpose of this paper is to investigate the relationship between consumer wine knowledge and the aesthetics and ephemerality of wine consumption.

970

Abstract

Purpose

The purpose of this paper is to investigate the relationship between consumer wine knowledge and the aesthetics and ephemerality of wine consumption.

Design/methodology/approach

A survey of 254 respondents for questions relating to objective wine knowledge and frequency of wine consumption, as well as the aesthetics and ephemerality of wine consumption was conducted. Clustering analysis was used to produce four discrete consumer clusters that provide insight into Berthon et al.’s (2009) aesthetic and ontology (AO) framework for the consumption of luxury wine brands.

Findings

The paper finds that four clusters of wine consumers can be identified that exhibit common characteristics outlined in the AO framework.

Practical implications

By clustering consumers and mapping these clusters, the AO framework provides wine marketers with a useful tool to segment the luxury wine market and to develop and deploy tailored wine marketing strategies to target each segment effectively.

Originality/value

This study is one of the first to investigate the relationship between consumer wine knowledge, aesthetics and ephemerality. It offers luxury wine marketers useful insights into targeting wine consumers according to their common characteristics.

Details

International Journal of Wine Business Research, vol. 28 no. 2
Type: Research Article
ISSN: 1751-1062

Keywords

Access Restricted. View access options
Article
Publication date: 11 March 2024

Hisham Said, Aswathy Rajagopalan and Daniel M. Hall

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT…

105

Abstract

Purpose

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT development and innovation diffusion require close collaborations between its supply chain architectural, engineering, construction and manufacturing (AECM) stakeholders. As such, the purpose of this study is to provide a preliminary understanding of the knowledge diffusion and innovation process of CLT construction.

Design/methodology/approach

The study implemented a longitudinal social network analysis of the AECM companies involved in 100 CLT projects in the UK. The project data were acquired from an industry publication and decoded in the form of a multimode project-company network, which was projected into a single-mode company collaborative network. This complete network was filtered into a four-phase network to allow the longitudinal analysis of the CLT collaborations over time. A set of network and node social network analysis metrics was used to characterize the topology patters of the network and the centrality of the companies.

Findings

The study highlighted the scale-free structure of the CLT collaborative network that depends on the influential hubs of timber manufacturers, engineers and contractors to accelerate the innovation diffusion. However, such CLT supply collaborative network structure is more vulnerable to disruptions due to its dependence on these few prominent hubs. Also, the industry collaborative network’s decreased modularity confirms the maturity of the CLT technology and the formation of cohesive clusters of innovation partners. The macro analysis approach of the study highlighted the critical role of supply chain upstream stakeholders due to their higher centralities in the collaborative network. Stronger collaborations were found between the supply chain upstream stakeholders (timber manufacturers) and downstream stakeholders (architects and main contractors).

Originality/value

The study contributes to the field of industrialized and CLT construction by characterizing the collaborative networks between CLT supply chain stakeholders that are critical to propose governmental policies and industry initiatives to advance this sustainable construction material.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Available. Open Access. Open Access
Article
Publication date: 18 January 2022

Srinimalan Balakrishnan Selvakumaran and Daniel Mark Hall

The purpose of this paper is to investigate the feasibility of an end-to-end simplified and automated reconstruction pipeline for digital building assets using the design science…

1764

Abstract

Purpose

The purpose of this paper is to investigate the feasibility of an end-to-end simplified and automated reconstruction pipeline for digital building assets using the design science research approach. Current methods to create digital assets by capturing the state of existing buildings can provide high accuracy but are time-consuming, expensive and difficult.

Design/methodology/approach

Using design science research, this research identifies the need for a crowdsourced and cloud-based approach to reconstruct digital building assets. The research then develops and tests a fully functional smartphone application prototype. The proposed end-to-end smartphone workflow begins with data capture and ends with user applications.

Findings

The resulting implementation can achieve a realistic three-dimensional (3D) model characterized by different typologies, minimal trade-off in accuracy and low processing costs. By crowdsourcing the images, the proposed approach can reduce costs for asset reconstruction by an estimated 93% compared to manual modeling and 80% compared to locally processed reconstruction algorithms.

Practical implications

The resulting implementation achieves “good enough” reconstruction of as-is 3D models with minimal tradeoffs in accuracy compared to automated approaches and 15× cost savings compared to a manual approach. Potential facility management use cases include the issue and information tracking, 3D mark-up and multi-model configurators.

Originality/value

Through user engagement, development, testing and validation, this work demonstrates the feasibility and impact of a novel crowdsourced and cloud-based approach for the reconstruction of digital building assets.

Details

Journal of Facilities Management , vol. 20 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Access Restricted. View access options
Book part
Publication date: 14 November 2014

Raymond P. Perry, Judith G. Chipperfield, Steve Hladkyj, Reinhard Pekrun and Jeremy M. Hamm

This chapter presents empirical evidence on the effects of attributional retraining (AR), a motivation-enhancing treatment that can offset maladaptive explanatory mind-sets…

Abstract

Purpose

This chapter presents empirical evidence on the effects of attributional retraining (AR), a motivation-enhancing treatment that can offset maladaptive explanatory mind-sets arising from adverse learning experiences. The evidence shows that AR is effective for assisting college students to adapt to competitive and challenging achievement settings.

Design/methodology/approach

This chapter describes the characteristics of AR protocols and details three primary advances in studying AR efficacy in terms of achievement performance, psychosocial outcomes, and processes that mediate AR-performance linkages. The psychological mechanisms that underpin AR effects on motivation and performance are outlined from the perspective of Weiner’s (1974, 1986, 2012) attribution theory.

Findings

Laboratory and field studies show that AR treatments are potent interventions that have short-term and long-lasting psychosocial, motivation, and performance benefits in achievement settings. Students who participate in AR programs are better off than their no-AR counterparts not just in their cognitive and affective prospects, but they also outperform their no-AR peers in class tests, course grades, and grade-point-averages, and are more persistent in terms of course credits and graduation rates.

Originality/value

This paper contributes to the emerging literature on treatment interventions in achievement settings by documenting key advances in the development of AR protocols and by identifying the next steps critical to moving the literature forward. Further progress in understanding AR efficacy will rest on examining the analysis of complex attributional thinking, the mediation of AR treatment effects, and the boundary conditions that moderate AR treatment efficacy.

1 – 10 of over 6000
Per page