Article
Publication date: 1 August 2006

Andrea P. Kern and Carlos T. Formoso

Traditional cost management systems adopted by construction firms have many problems, which are widely discussed in the literature: the information provided by them is usually…

4127

Abstract

Traditional cost management systems adopted by construction firms have many problems, which are widely discussed in the literature: the information provided by them is usually too late, and tends to be too aggregated and too distorted to be relevant for production management. The main objective of this research work is to propose a project cost planning and control model for construction firms. This model aims to support the development of production management systems, in which cost management and production planning and control can be gradually integrated, in order to overcome the existing limitations of cost accounting systems. The scope of the model was limited to building projects carried out by small and medium sized companies, involved in both product development and production. The development of the model was based on the literature review and also on the results of nine empirical studies conducted in four different Brazilian construction firms. The model suggests the integrated application of three fairly well known cost management techniques: operational cost estimating, S‐curves and target costing. By using this set of tools, it is expected that cost management will become more proactive, and able to deal with the dynamic, uncertain and complex construction environment that exists in most projects. The model was partially tested in two case studies, in which it provided key information for supporting decision making related to design, production planning and contracts with suppliers.

Details

Journal of Financial Management of Property and Construction, vol. 11 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Content available
Article
Publication date: 26 October 2021

Carlos T. Formoso and Rafael Sacks

378

Abstract

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Article
Publication date: 1 May 2002

CARLOS T. FORMOSO, PATRICIA TZORTZOPOULOS and RENATA LIEDTKE

The performance of the product development process has a critical influence on the efficiency and duration of building projects, as well as on the quality of the final product…

Abstract

The performance of the product development process has a critical influence on the efficiency and duration of building projects, as well as on the quality of the final product. Despite its importance, relatively little attention has been given to the management of this process, if compared with production. The main objective of this paper is to present some results of a research project which aimed to devise a general model for managing the product development process in small sized companies involved in the development and construction of residential and commercial buildings. This model consists of a template for the product development process, which can be used by different companies as a basis to devise their own models for managing individual projects. The development of the model was based on case studies carried out in two companies from the south of Brazil and also on a benchmarking study.

Details

Engineering, Construction and Architectural Management, vol. 9 no. 5/6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 September 2013

Cecília Gravina da Rocha and Carlos Torres Formoso

Mass customisation involves the provision of product variants that fulfil clients' specific requirements seeking to increase product values. The configuration process involves a…

Abstract

Mass customisation involves the provision of product variants that fulfil clients' specific requirements seeking to increase product values. The configuration process involves a chain of decisions, which needs to be undertaken to create product variants that meet each client specific requirements. In this paper, this chain of decisions is conceptualized in terms of customisation units. Each customisation unit encompasses a customisable attribute (e.g. size, colour) and the range of items offered for this attribute. A design science approach was adopted in this investigation. In this approach, knowledge is produced by creating and testing a solution, which provides practical and theoretical contributions. A method is proposed to analyse and improve the configuration process by conceptualizing this process as a tree diagram. The proposed method is used to analyse the configuration process developed by organisations of the house-building sector based in the U.K. and Brazil: a manufacturer of floor tiles, contractors, and registered providers. These analyses enabled a comparison of the distinct configuration processes adopted. In addition, problems associated to the configuration process (such as burden of choice) and opportunities for improvements were also identified. Finally, alternative chains of decision were also devised based on these analyses to address the problems identified.

Details

Open House International, vol. 38 no. 3
Type: Research Article
ISSN: 0168-2601

Keywords

Open Access
Article
Publication date: 19 March 2018

Josana Gabriele Bolzan Wesz, Carlos Torres Formoso and Patricia Tzortzopoulos

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order…

4042

Abstract

Purpose

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments.

Design/methodology/approach

Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams.

Findings

The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices.

Research limitations/implications

Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested.

Originality/value

The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 10 August 2018

Denise Ann Brady, Patricia Tzortzopoulos, John Rooke, Carlos Torres Formoso and Algan Tezel

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a…

8707

Abstract

Purpose

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a systematic way to the planning and control process. The application of the visual tools in this way facilitates the flow of information, thus improving transparency between the interfaces of planning, execution and control.

Design/methodology/approach

Design Science research is adopted for this investigation, which analyses the original development of the model and reports on its testing and refinement over different types of projects. The research is divided into three parts, each part focussing on a different stage of development and construction project type.

Findings

The main findings are related to the benefits of visual management in the construction planning and control process, such as maintaining consistency between different planning levels, so that feasible execution plans are created; control becomes more focussed on prevention rather than correction, and creates opportunities for collaborative problem solving. Moreover, the physical display of the visual tools in a discrete planning area on-site encourages a regular exchange between participants on actual work progress as it unfolds, leading to more timely reaction to the problems at hand.

Originality/value

The problem of a lack of transparency in construction planning and control leads to communication issues on-site, poor process orientation and high levels of waste. LCM improves process transparency by making information related to system-wide processes more readily available to project participants. This enables them to foresee problems in a timely manner and to take necessary measures to resolve them or to adapt the process to current circumstances. The LCM model proposes a new way of applying visual tools and controls systematically to improve transparency in construction planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 March 2024

Natália Ransolin, Tarcisio Abreu Saurin, Robyn Clay-Williams, Carlos Torres Formoso, Frances Rapport and John Cartmill

Surgical services are settings where resilient performance (RP) is necessary to cope with a wide range of variabilities. Although RP can benefit from a supportive built…

Abstract

Purpose

Surgical services are settings where resilient performance (RP) is necessary to cope with a wide range of variabilities. Although RP can benefit from a supportive built environment (BE), prior studies have focused on the operating room, giving scant attention to support areas. This study takes a broader perspective, aiming at developing BE design knowledge supportive of RP at the surgical service as a whole.

Design/methodology/approach

Seven BE design prescriptions developed in a previous work in the context of internal logistics of hospitals, and thus addressing interactions between workspaces, were used as a point of departure. The prescriptions were used as a data analysis framework in a case study of the surgical service of a medium-sized private hospital. The scope of the study included surgical and support areas, in addition to workflows involving patients and family members, staff, equipment, sterile instruments and materials, supplies, and waste. Data collection included document analysis, observations, interviews, and meetings with hospital staff.

Findings

Results identified 60 examples of using the prescriptions, 77% of which were related to areas other than the operating rooms. The developed design knowledge is framed as a set of prescriptions, examples, and their association to workflows and areas, indicating where it should be applied.

Originality/value

The design knowledge is new in surgical services and offers guidance to both BE and logistics designers.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 June 2023

Mirela Schramm Tonetto, Carlos Torres Formoso, Tarcisio Abreu Saurin, Fabiana Bonesi De Luca, Fernanda Pavan Lora and Elvira Lantelme

The COVID-19 pandemic offered a unique glimpse into the resilience of construction projects, shedding light on several learning opportunities. The purpose of this paper is to…

Abstract

Purpose

The COVID-19 pandemic offered a unique glimpse into the resilience of construction projects, shedding light on several learning opportunities. The purpose of this paper is to develop propositions for the improvement of resilient performance in construction in the post-pandemic era.

Design/methodology/approach

The propositions were developed based on an empirical study in Brazil. Data collection involved the analysis of regulations, interviews with health experts, managers, and workers, in addition to non-participant observations of the use of 37 control practices in 39 construction sites comparing the work-as-imagined and the work-as-done. The practices were classified in a hierarchy of controls.

Findings

Seven propositions for the improvement of resilient performance were developed, addressing collaboration between construction companies, slack resources, new health and safety practices, production planning and control, digital technologies, visual management, and organizational culture. These propositions emphasize organizational support for resilience. This is in contrast to the nature of most observed practices (57%) that relied on administrative controls and personal protective equipment, which are measures dependent on behaviors that resemble resilience at the individual level.

Originality/value

Although much has been studied on COVID-19 implications for construction projects, previous empirical studies have not adopted the organizational resilience perspective as the main theoretical background.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 12
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 13 August 2021

Juliana Parise Baldauf, Carlos Torres Formoso and Patricia Tzortzopoulos

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount…

2812

Abstract

Purpose

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount of requirements information, in order to deal with a diversity of clients and frequents changes in healthcare services. The proposed method supports healthcare design by adopting a process-based approach for client requirements management, with the aim of improving value generation.

Design/methodology/approach

Design Science Research was the methodological approach adopted in this investigation. The main outcome of this study emerged from an empirical study carried out in a healthcare project in Brazil.

Findings

The proposed method involves three stages: (1) capturing and processing requirements; (2) product and requirements modelling, which involves the connection between requirements and the BIM 3-D model and (3) supporting design solution refinement, through the communication of requirements and the assessment of design in relation to updated client requirements information.

Originality/value

This study explores client requirements management from a process perspective, proposing activities and their interdependences and possible sources of data, including healthcare services information. The main theoretical contributions are related to the understanding of the nature and complexity of the information involved in client requirements management, and how this can be modelled.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2002

Aguinaldo Santos, Carlos Torres Formoso and J.E. Tookey

Discusses the effectiveness of construction practices on standardisation based on six case studies developed both in Brazil and in the UK, focusing on the “bricklaying” process…

2418

Abstract

Discusses the effectiveness of construction practices on standardisation based on six case studies developed both in Brazil and in the UK, focusing on the “bricklaying” process. The case studies showed a paradox: construction companies developing written standards but failing to implement and maintaining standard practices. Written standards were extremely ineffective in the case studies due to the lack of teamwork and problem solving activities. It became clear that the abstract meaning of standardisation has far larger possibilities than simply developing descriptions of practice in written documents. Information on standards could be displayed in the packing system or equipment, for instance. Most importantly, information on standard procedures should be available when and where the construction worker needs it, despite the great need for workstation mobility. Hence, concludes that there is an urgent need for promoting a more widespread use of “visual management” approaches in order to enable effective dissemination and use of standard practices within the construction environment.

Details

The TQM Magazine, vol. 14 no. 1
Type: Research Article
ISSN: 0954-478X

Keywords