Nathaniel Ayinde Olatunde, Imoleayo Abraham Awodele, Bosede Olajumoke Adebayo and Sola Samuel Makanjuola
The study examined the factors inhibiting the engagement of Quantity Surveyors (QS) on private residential building projects in Ado-Ekiti, Nigeria with a view to enhance the…
Abstract
Purpose
The study examined the factors inhibiting the engagement of Quantity Surveyors (QS) on private residential building projects in Ado-Ekiti, Nigeria with a view to enhance the performance of such projects.
Design/methodology/approach
The study used a qualitative research approach with the use of interview protocol for data collection. A Convenient sampling method was used to select 20 on-going residential building construction projects for the study in the Government Reserved Area, Ado Ekiti, Ekiti State, Nigeria. The client and the architect of the selected projects were the population of research for interview. For data analysis, 28 successful interviews were used, while frequency, percentile and content analysis were the method of data analysis used.
Findings
The result indicated that the most important factor inhibiting the engagement of QSs on private residential building projects is lack of awareness of the benefit inherent in engagement of QS on residential projects. Other important factors are; the perception that engagement of QS will increase the construction cost, absence of legislation that mandate engagement of QS, usurpation of Quantity Surveyor’s roles by other professionals and the perception that engagement of QS is essential only in big projects.
Practical implications
It was recommended that every state chapter of the Nigerian Institute of Quantity Surveyors (NIQS) should start a series of awareness campaign program within their State to enlighten the populace on the services that a professional QS can offer them with emphasis on the benefits of engaging QS on the small scale projects such as residential building projects. More recommendation has it that as a matter of policy and requirement for building approval criteria, deliverables from QS should be made compulsory. This measure will help every potential residential building client to see QS as an important professional that must be engaged before their project can be successfully delivered.
Originality/value
The study attempted to investigate the factors inhibiting the engagement of QS on private residential building construction projects. This was motivated by the perceived prevalent of non-engagement of QS in the study area with the attendant poor project performance.
Details
Keywords
Nathaniel Ayinde Olatunde, Imoleayo Abraham Awodele and Bosede Olajumoke Adebayo
The purpose of this study is to examine the impact of coronavirus disease 2019 (COVID-19) on indigenous contractors in a developing economy with a view to enhancing their…
Abstract
Purpose
The purpose of this study is to examine the impact of coronavirus disease 2019 (COVID-19) on indigenous contractors in a developing economy with a view to enhancing their performance.
Design/methodology/approach
The study used a purposive sampling technique to select 37 indigenous contractors with ongoing construction contracts in Osun State, Nigeria who provided data for the study. A structured interview protocol was used to elicit the required information from the interviewees and frequency, percentage and content analysis were used for data analysis.
Findings
The results showed that the critical impact of COVID-19 on indigenous contractors in a developing economy is: time overrun, loss of profit and creation of dispute. Further results showed that other impacts are a disruption in supply of labour, locally sourced materials are with additional cost, the additional cost of implementing COVID-19 protocols, difficulty in sourcing imported materials and absence of new jobs with the corresponding retrenchment of workers.
Practical implications
The study recommended special palliatives for the indigenous contractors from the government so as to cushion the impact of the pandemic on them, thereby enhance their survival and performance. A special arbitration panel is set up in each state of the federation to look at disputes arising from the aftermath of the pandemic, this is with a view to adequately compensate indigenous contractors with genuine and properly compiled claims. inferring from the findings of the study, it suffices to say that the severity of the impact of the pandemic is very high on indigenous contractors in developing economies, as such a better preparedness strategy could lessen the impact of such pandemic in the future.
Originality/value
The study is an attempt to unearth the impact of COVID-19 on indigenous contractors with ongoing construction contracts in a developing economy. The study will be of value to construction stakeholders in providing the information needed to devise strategies to minimise the impact of a pandemic on indigenous contractors in future projects thereby enhance their performance.
Details
Keywords
Nathaniel Ayinde Olatunde, Idienumah Monday Fidelis, Imoleayo Abraham Awodele and Bosede Olajumoke Adebayo
The study assessed the stakeholders prioritization of key performance indicators (KPIs) on public and private tertiary educational projects in Osun State, Nigeria intending to…
Abstract
Purpose
The study assessed the stakeholders prioritization of key performance indicators (KPIs) on public and private tertiary educational projects in Osun State, Nigeria intending to enhance their performance.
Design/methodology/approach
The study used a total enumeration survey to purposively select built environment professionals working in the Physical Planning and Development Unit (PPDU) and procurement units of 17 tertiary educational institutions (7public and 10 private) in Osun State Nigeria for data collection. A quantitative research approach was adopted for the study using a questionnaire. A total of 102 questionnaires were retrieved from the respondents and used for analysis. Analysis of data was done using frequency, percentile, mean score (MS), Cronbach's Alpha coefficient, t-test, and Analysis of variance (ANOVA).
Findings
The study found that in the overall opinion of the respondents the most prioritized KPIs for tertiary educational projects are for the project to meet specifications (MS = 4.17), the project must be on time (MS = 4.01), and efficient use of resources (MS = 3.96). The important KPIs for the public tertiary educational projects is that the project should meet specifications (MS = 4.08), deliver the projects on time (MS = 3.96), and be under cost (MS = 3.84). While, the most prioritized KPIs for private tertiary educational projects are for the project to meet specifications (MS = 4.25), efficient use of resources (MS = 4.14), on time, and doing the right thing (effectiveness) (MS = 4.06) each. More findings indicated that there is no significant difference in the manner built environment professionals prioritized KPIs. However, there is only a 7% significant difference in the manner professionals working in the public and private tertiary educational institutions in Nigeria ranked KPIs.
Practical implications
There is a significant difference in the ways and manner built environment professionals working with the public and private tertiary educational institutions in Nigeria view resource utilization on their projects. As such, working environment either as public or private has a significant impact on resource utilization for tertiary educational construction projects.
Originality/value
The study compared opinions of professionals working with public and private tertiary educational institutions on KPIs to enhance project performance.
Details
Keywords
Evans Osabuohien, Gbadebo Odularu, Daniel Ufua and Romanus Osabohien