Article
Publication date: 3 July 2024

Collins Ameyaw, Sarfo Mensah, Blondel Akun Abaitey and Anita Asamoah-Duodu

The practice of the defects liability period (DLP) is a risk management strategy meant to secure durable and high-quality works. However, construction products continue to…

Abstract

Purpose

The practice of the defects liability period (DLP) is a risk management strategy meant to secure durable and high-quality works. However, construction products continue to malfunction even after the expiration of DLPs. This study seeks to determine the adequacy of DLPs existing in the construction industry and propose appropriate DLPs for construction projects in the Ghanaian construction industry.

Design/methodology/approach

Applying quantitative research strategy, 124 questionnaires were retrieved from construction professionals surveyed. The data obtained were analysed using descriptive statistics, Cramer’s V and the significance test with the aid of Stata software.

Findings

It was found that defects start showing in both buildings and roads within 12 months after being handed over for the client’s use. The significance test and Cramer’s V analysis indicate low concordance amongst respondents that the 6–12 month DLPs existing in Ghana are adequate. It is found that the existing DLP practice does not provide sufficient security to clients.

Practical implications

Construction project clients will need to include the tenderer’s proposed DLP as part of the tender evaluation criteria with the objective of picking up a signal of the quality of work to be delivered.

Originality/value

This paper is one of the pioneering studies addressing the issue of the adequacy of DLPs in the construction industry in the Sub-Saharan Africa region. The findings trigger policy and regulatory changes in conditions guiding construction contracts procured in most developing countries that have adopted and adapted to the World Bank Public Procurement Guidelines.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 22 July 2021

Sarfo Mensah, Collins Ameyaw, Blondel Akun Abaitey and Hayford Obeng Yeboah

Over dependence on river/sea sand as building material has impacted the environment negatively. However, laterite, which is an environment-friendly indigenous building material in…

Abstract

Purpose

Over dependence on river/sea sand as building material has impacted the environment negatively. However, laterite, which is an environment-friendly indigenous building material in sub-Saharan Africa, has been less exploited as a suitable alternative. This paper aims to ascertain the optimum cement–laterite mix proportion at which laterite can be stabilized for production of walling units.

Design/methodology/approach

Using an experimental method, laterite was collected from three borrow pit sites. Sieve analysis was performed to determine the particle size distribution. Also, the degree of workability of the cement–laterite mix was ascertained using slump test. Compressive strengths were determined at cement stabilization percentages of 3%, 7% and 10% on 12 cubes of100 mm cast and cured for 14 and 28 days, respectively.

Findings

The results showed that the lateritic soil investigated, achieves its optimum strength in 28 days of curing, at a stabilization level of 10%. An average compressive strength of 2.41 N/mm2, which is 20.5% greater than the target strength, was achieved.

Practical implications

To meet the desired compressive strength of alternative walling units while achieving environmental sustainability and efficiency in production, cement stabilization of lateritic soils should become a recommended practice by built environment professionals in sub-Saharan Africa.

Originality/value

This paper is one of the first research works that attempts to determine the optimum level at which the abundant sub-Saharan laterite can be chemically stabilized for the production of non-load bearing walling units. This research promotes an environment-friendly alternative building material to sea sand, river sand and off-shore sand.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 31 March 2021

Collins Ameyaw, Blondel Akun Abaitey, Sarfo Mensah and Emmanuel Manu

The purpose of this study was to determine the transaction cost (TC) contractors incur when tendering for a project as well as establish a correlation between the TC of tender and…

Abstract

Purpose

The purpose of this study was to determine the transaction cost (TC) contractors incur when tendering for a project as well as establish a correlation between the TC of tender and tender amount of projects procured through the national competitive bidding procurement method.

Design/methodology/approach

The research draws extensively documentary analysis, observation and interviews to collect cost data on 14 different tenders submitted by a D1/K1 contractor. Using TC theory, the data are analyzed and the actual cost is determined. Further, Spearman rank correlation is employed to establish a relationship between tender price (TP) and the cost of tender by the aid of Statistical Package for Social Sciences.

Findings

The research developed a tender preparation conceptual framework highlighting the components of TC in competitive tendering in Ghana and also revealed that, apart from the emotional and psychological costs, contractors in Ghana incur approximately Gh₵ 4,625 (US$ 925)–Gh₵ 2,520 (US$ 504) to prepare and submit a competitive tender. In relation to the tender figure, the TC of tender in Ghana ranges from 0.05% to 0.65% and an average of 0.33%. Also, there is an inverse correlation between TP and the percentage cost of tender.

Research limitations/implications

The research relied on 14 competitive tenders and also limited to public sector works. Findings from the study should therefore be applied with caution.

Originality/value

This study is the only known research that has focused on assessing the TC of public sector competitive tendering from a contractor's perspective and within a developing sub-Saharan African context.

Details

Built Environment Project and Asset Management, vol. 11 no. 5
Type: Research Article
ISSN: 2044-124X