Article
Publication date: 24 August 2021

Kofi Agyekum, Elorm Emil Koku Akli-Nartey, Augustine Senanu Kukah and Amma Kyewaa Agyekum

The excellence in design and greater efficiencies (EDGE) certification system has seen a gradual adoption worldwide, with Ghana having six out of its eight certified green…

804

Abstract

Purpose

The excellence in design and greater efficiencies (EDGE) certification system has seen a gradual adoption worldwide, with Ghana having six out of its eight certified green buildings bearing an EDGE certification. However, little is known about occupants’ satisfaction with the indoor environmental quality (IEQ) of EDGE-certified buildings. Therefore, the purpose of this study is to examine the satisfaction of occupants with the IEQ of an EDGE-certified building in Ghana by identifying their perceived performance of the indoor environment relative to their perceived importance.

Design/methodology/approach

A survey was conducted to evaluate the performance of 12 IEQ parameters with the occupants of an EDGE-certified office building. The survey results were evaluated using a gap analysis and both traditional and alternative Importance-Performance Analysis (IPA) matrices.

Findings

The findings revealed that noise level, temperature, cleanliness, sound privacy, air quality and humidity were IEQs that required the highest priority for improvement. Daylight and artificial lighting showed no appreciable performance gap. Space layout was adequately satisfied, whereas space size was overly satisfied. Visual privacy and outdoor view were found to require low priority of improvement.

Originality/value

This study contributes to the state-of-the-art of the IEQ of green buildings. It pioneers the research that seeks to examine the IEQ of EDGE-certified buildings. The gap analysis and the IPA were effective in prioritizing the IEQs for improvement action and provided a practical research framework that helped researchers examine the performance of green buildings, thereby giving valuable feedback to policymakers and building owners.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Access Restricted. View access options
Article
Publication date: 26 April 2022

Amma Kyewaa Agyekum, Frank Desmond Kofi Fugar, Kofi Agyekum, Isaac Akomea-Frimpong and Hayford Pittri

The absence of effective stakeholder engagement at the early planning and implementation stages impact projects negatively. However, the role of stakeholders in Sustainable…

1620

Abstract

Purpose

The absence of effective stakeholder engagement at the early planning and implementation stages impact projects negatively. However, the role of stakeholders in Sustainable Procurement (SP) is not well recognized and as such there is limited involvement of stakeholders in sustainable procurement of public (SPP) works. This research aims to examine the barriers to stakeholder engagement in SPP works.

Design/methodology/approach

A survey of 104 respondents from eight procurement entities of tertiary institutions in Ghana was undertaken and validated with seven procurement experts. After satisfying all the necessary tests of reliability of the survey instrument and sample size, the data was subjected to the Principal Component Analysis (PCA) to determine the critical barriers.

Findings

The study's results indicate that there are three cluster of barriers to stakeholder engagement in SPP works. They are organisational structures and knowledge driven factors, attitudinal and stakeholder fatigue and relational and information sharing processes.

Practical implications

This study offers relevant data for policy makers, organisations and local communities in establishing controls against barriers to stakeholder engagement. Furthermore, this research presents policy makers with recommendations to improve communication and organisational policies in enhancing stakeholder participation in SPP works in Ghana and other developing countries.

Originality/value

Although studies on SP has increased with time, issues such as obstacles to stakeholder engagement in SP remain unexplored. Empirical data presented in this study bridges the gap that exists on the barriers of stakeholder engagement in SPP works in the Ghana Construction Industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988