Search results
1 – 10 of 26James A. Pinder, Rob Schmidt, Simon A. Austin, Alistair Gibb and Jim Saker
Despite being a common term in the literature, there is little agreement about what the word “adaptability” means in the context of the built environment and very little evidence…
Abstract
Purpose
Despite being a common term in the literature, there is little agreement about what the word “adaptability” means in the context of the built environment and very little evidence regarding practitioners’ understanding of adaptability. This paper aims to examine what practitioners in the building industry mean when they talk about “adaptability”.
Design/methodology/approach
This study adopted a qualitative approach, involving 82 unstructured face-to-face interviews with practitioners from a range of professional disciplines in the construction industry, including architects, engineers, facilities managers, property agents and planners. The interview transcripts were coded inductively to identify themes in the qualitative data.
Findings
The interview data revealed a wide range of perspectives on adaptability, particularly regarding terminology, the meanings practitioners associate with adaptability and the way in which these meanings are communicated to others in the industry. The applied meaning of adaptability varied depending on context.
Practical implications
Conflicting language, and different interpretations of adaptability, is a potential barrier to the development of adaptable buildings. A clearer articulation of the meaning of adaptability (particularly by clients) during briefing and design could give rise to a more appropriate level of adaptability in the built environment.
Originality/value
This study has addressed a gap in the existing literature by foregrounding the voices of industry practitioners and exploring their (sometimes very different) interpretations of adaptability in buildings.
Details
Keywords
Toru Eguchi, Robert Schmidt, Andrew Dainty, Simon Austin and Alistair Gibb
This paper explores the adaptability of buildings in Japan from the perspective of three distinct practice typologies: large general contractors, large architectural design firms…
Abstract
This paper explores the adaptability of buildings in Japan from the perspective of three distinct practice typologies: large general contractors, large architectural design firms, and small design ateliers. The paper illustrates the cultivation of adaptability in Japan revealing a maturing of concepts into current innovations, trends, priorities, and obstacles in relation to adaptability in design. The paper contextualizes the situation by reviewing the evolution of residential development in support of building adaptability, and the ways in which these policies and concepts have shaped practice and transcended residential design. This evolution is then explored through non-residential case studies undertaken by the three practice types, and supported through a review of critical themes emerging from the interviews. The importance of particular physical characteristics are examined including storey height, location of services, planning modules and structural spacing/spans. The interviews expose the critical relationship between adaptability and different social variables - the state of the market, the role of planning regulations and other legal frameworks; as well as, the misconceptions and variations in the perceptions on the role and meaning adaptability has in practice. The paper is concluded by revealing the lessons learnt, including the unfolding of dependencies outside the ‘black box’ of adaptability (e.g. practice culture, material and, stakeholder mindsets) and the requirement of effective communication of concepts to allow an informed conversation between professionals and with clients and users. Like many other philosophical design concepts in complex processes, adaptability benefits from a mutual understanding, good relationships, communication, integration, and shared goals amongst team members.
Details
Keywords
Michael McCarney, Chris Ian Goodier and Alistair Gibb
This paper aims to identify and discuss how process and people factors influence the successful implementation of organisational interface management in offsite bathroom…
Abstract
Purpose
This paper aims to identify and discuss how process and people factors influence the successful implementation of organisational interface management in offsite bathroom construction.
Design/methodology/approach
A literature review identified 16 process and people factors. A mixed method approach was used to analyse data from eight offsite bathroom case study projects. A ranking approach determined the main process and people factors, consequently analysed using (Minitab) Frequency analysis, the Wilcoxon Signed Rank test and thematic analysis to establish the contributing sub-factors and their inter-relationships, to each other and to the literature. These factors and sub-factors formed the final conceptual model, bringing together interface management and offsite bathroom construction.
Findings
The nine factors instrumental to the conceptual model include six process factors: procurement, design management, supply chain management, health and safety, tolerance and quality and three people factors: communication, client/design team and project manager, reflecting the construction industry focus on hard processes over soft. The role of the project manager and communication, however, are the main factors which contribute to overall project success. Direct management of the offsite works by the contractor’s project manager is also highly significant.
Research limitations/implications
Limitations include the (UK) geographical focus of the research and the focus on bathroom pods in buildings.
Social implications
The research recognises three people (social) factors: communication, client/design team and project manager, with the first and third being the main factors which contribute to overall project success.
Originality/value
Originality stems from the focus on organisational interface management and how this relates to offsite bathroom construction (a practice gaining considerable momentum in industry) and the resultant model. Being grounded on more than one body of academic literature as well as 8 case studies and 82 industry interviews, there is value to both researchers and construction industry practitioners alike.
Details
Keywords
Wendy Jones, Alistair G.F. Gibb and Vivien Chow
Substantial changes were made on many UK construction projects in response to the COVID-19 pandemic. The purpose of this paper is to explore the unanticipated positive…
Abstract
Purpose
Substantial changes were made on many UK construction projects in response to the COVID-19 pandemic. The purpose of this paper is to explore the unanticipated positive consequences of these and the scope for longer-term learning and developments within the sector.
Design/methodology/approach
A qualitative approach was used, semi-structured interviews were conducted across six major project sites. Interviewees (n = 33) included site and senior managers, supply chain representatives and occupational safety and health (OSH) professionals. The interviews explored their experiences of working on site during the pandemic, the changes made to work practices and their perceived impacts of these changes.
Findings
Improved planning and work sequencing were part of the revised process to make sites COVID-secure. This increased worker effectiveness and housekeeping/tidiness. The view on some sites was that this would improve OSH performance. The changes were perceived to be beneficial but may not be accepted by clients in the long term, as they could result in projects taking longer to complete. The ways in which COVID-19 risk has been communicated and perceived also provides longer-term lessons for the sector’s OSH management and training.
Originality/value
Construction has adapted rapidly and effectively to new ways of working during the pandemic. This research captured in real time some of the changes made and presents an argument for embedding and adopting the changes to improve working arrangements and OSH within the construction sector.
Details
Keywords
Patrick Manu, Anush Poghosyan, Abdul-Majeed Mahamadu, Lamine Mahdjoubi, Alistair Gibb, Michael Behm and Olugbenga O. Akinade
Against the backdrop of the contribution of design to the occurrence of occupational injuries and illnesses in construction, design for occupational safety and health (DfOSH) is…
Abstract
Purpose
Against the backdrop of the contribution of design to the occurrence of occupational injuries and illnesses in construction, design for occupational safety and health (DfOSH) is increasingly becoming prominent in the construction sector. To ensure that design interventions are safe for construction workers to build and maintain, design firms need to have the appropriate organisational capability in respect of DfOSH. However, empirical insight regarding the attributes that constitute DfOSH organisational capability is lacking. The purpose of this paper, which trailblases the subject of DfOSH organisational capability in construction, is to address two key questions: what organisational attributes determine DfOSH capability? What is the relative priority of the capability attributes?
Design/methodology/approach
The study employed three iterations of expert focus group discussion and a subsequent three-round Delphi technique accompanied by the application of voting analytic hierarchy process.
Findings
The study revealed 18 capability attributes nested within six categories, namely: competence (the competence of organisation’s design staff); strategy (the consideration of DfOSH in organisation’s vision as well as the top management commitment); corporate experience (organisation’s experience in implementing DfOSH on projects); systems (systems, processes and procedures required for implementing DfOSH); infrastructure (physical, and information and communication technology resources); and collaboration (inter- and intra-organisational collaboration to implement DfOSH on projects). Whilst these categories and their nested attributes carry varying weights of importance, collectively, the competence-related attributes are the most important, followed by strategy.
Originality/value
The findings should enable design firms and other key industry stakeholders (such as the clients who appoint them) to understand designers’ DfOSH capability better. Additionally, design firms should be able to prioritise efforts/investment to enhance their DfOSH capability.
Details
Keywords
Anush Poghosyan, Patrick Manu, Lamine Mahdjoubi, Alistair G. F. Gibb, Michael Behm and Abdul-Majeed Mahamadu
Decisions made during the design stage of construction works can significantly reduce the risk of occurrence of occupational accidents, injuries and illnesses. Moreover, it has…
Abstract
Purpose
Decisions made during the design stage of construction works can significantly reduce the risk of occurrence of occupational accidents, injuries and illnesses. Moreover, it has been established that design is one of the major contributors of accidents and injuries. Design for safety (DfS) studies within construction have highlighted factors affecting the implementation of DfS, among which are designer attitude; DfS knowledge/awareness and education; availability of DfS tools, including guidance; client’s influence and motivation; and legislation. The purpose of this study is to carry out an in-depth literature review of DfS studies within construction to explore the extent to which existing DfS research has looked at the above-listed DfS implementation factors.
Design/methodology/approach
A review of 164 journal articles related to DfS in construction (published from 1990 to 2017) within built environment, engineering and multidisciplinary safety journals was undertaken.
Findings
The findings indicate that around 60 per cent of the journal articles reviewed address designer knowledge/awareness and education issues, about 27 per cent looked at DfS implementation tools to assist designers to undertake DfS, about 23 per cent studied client influence/motivation, about 16 per cent studied designers’ attitudes towards DfS implementation and approximately 16 per cent looked at the role of legislation in DfS implementation. The literature points that client influence/motivation and legislation are very influential DfS implementation factors despite a limited number of studies in these areas.
Originality/value
Overall, the findings provide an indication of areas of DfS implementation, particularly client influence/motivation and legislation, where more research would be needed to promote DfS in construction to help mitigate the occurrence of accidents and injuries.
Details
Keywords
Alistair Gibb, Sophie Hide, Roger Haslam, Diane Gyi, Trevor Pavitt, Sarah Atkinson and Roy Duff
This paper presents tools and equipment aspects of the results from a three‐year United Kingdom Government funded research project investigating accident causality (ConCA). The…
Abstract
This paper presents tools and equipment aspects of the results from a three‐year United Kingdom Government funded research project investigating accident causality (ConCA). The project has used focus groups and studied in detail 100 construction accidents site audits, interviews with involved persons and follow‐up along the causal chain. This paper concentrates on the influence of construction tools and equipment which were found to be important contributory factors identified by the research. They have largely been overlooked by previous studies and are not typically acknowledged as accident contributors. This paper argues for further work to confirm these links and for the inclusion of tools and equipment in the list of categories in statutory reporting procedures. This would also require an increased acknowledgement by construction managers of their influence, leading to better design and management of their supply and care on site.
Details
Keywords
ALISTAIR G.F. GIBB and FRANK ISACK
This paper presents the results from interviews of 59 senior personnel from major construction clients. There are two main themes: client drivers for construction projects and…
Abstract
This paper presents the results from interviews of 59 senior personnel from major construction clients. There are two main themes: client drivers for construction projects and their implications for standardization of processes and components. The client sample is described and reasons for procuring construction projects are established along with the extent of their involvement in the construction process and hence their ability to influence the outcomes. Their views on value for money, preconceptions of standardization and their opinion on its future potential are explored. Many clients recognize the need to involve constructors and manufacturers early, although fewer actually achieve this. Misconceptions about standardization exist, but many clients are recognizing the benefits possible from standardization. However, very few actually measure benefits and so are unable to truly evaluate success. There is a future for increased standardization, but only if the industry recognizes the unique aspects of each client and responds positively to meet those needs.
Details
Keywords
Wei Pan and Alistair G.F. Gibb
Offsite is one of the main innovative techniques employed in the contemporary UK construction sector. Building maintenance accounts for over 5 percent of the UK's gross domestic…
Abstract
Purpose
Offsite is one of the main innovative techniques employed in the contemporary UK construction sector. Building maintenance accounts for over 5 percent of the UK's gross domestic product of which bathrooms are regarded as a critical area, with potential high risks and defects. However, the importance of its maintenance has been largely underestimated and research into this area appears to be limited. This paper aims to address this knowledge gap by investigating the maintenance performance of offsite and in situ bathrooms for student accommodation.
Design/methodology/approach
The paper examines 732 maintenance records over three years of 216 precast concrete modules, 84 Glass Reinforced Polyester (GRP) modules and 96 traditionally‐built in situ bathrooms.
Findings
The research found that offsite modules outperformed in situ bathrooms in terms of maintenance. GRP modules created the least maintenance problems, compared to precast modules and in situ bathrooms. The maintenance of in situ bathrooms was more complex than offsite modules, and involved more diverse problematic areas. The main causes of the problems included inappropriate design; poor build workmanship, lack of quality of component materials and improper usage by occupants. This supports a parallel study that found that the costs associated with maintenance were significantly higher for in situ bathrooms than for the equivalent offsite solutions.
Research limitations/implications
The paper contributes to understanding the problems of offsite bathroom modules requiring maintenance in comparison with in situ bathrooms and their possible causes. Key aspects of offsite bathrooms including drainage, toilets, vents and sinks should be improved. Quality of component materials used for in situ bathrooms should be ensured. These improvements can only be achieved through better design for maintenance with clients' aspiration embodied. The findings should assist in design decision making of selecting bathrooms for residential buildings. However, a balanced approach, taking into account other factors for such selection, is open for future investigation.
Originality/value
The framework of strategies developed should improve the innovative design of bathrooms manufactured offsite and help maintain them for better lifecycle performance.
Details
Keywords
Abdulla Kalian, Alastair Watson, Emeka Agbasi, Chimay Anumba and Alistair Gibb
The cladding of a modern building is a critical, and expensive, specialist sub‐system of the total building. This paper is concerned with modelling the supply chain processes…
Abstract
The cladding of a modern building is a critical, and expensive, specialist sub‐system of the total building. This paper is concerned with modelling the supply chain processes within the building cladding sector of the UK construction industry. The modelling was conducted within the context of CIMclad, a research project involving a consortia of universities and industry that is seeking to move the cladding sector towards computer integrated design and manufacture. The goal was to better understand the existing supply chain processes. These processes are complex and span a diverse range of players, each of whom may play one or more roles. The methodology employed was a combination of informal mapping of the procurement chain and the application of formal process modelling techniques.
Details