Publication date: 1 August 2018

Mohammad Rohani, Gholamali Shafabakhsh, Abdolhosein Haddad and Ehsan Asnaashari

The spatial conflicts and congestion of construction resources are challenges that lead to the reduction in efficiency. The purpose of this paper is to enable users to detect and…

898

Abstract

Purpose

The spatial conflicts and congestion of construction resources are challenges that lead to the reduction in efficiency. The purpose of this paper is to enable users to detect and resolve workspace conflicts by implementing four resolution strategies in a five-dimensional (5D) CAD model. In addition to resolving conflicts, the model should be able to optimize time and cost of the projects. In other words, three variables of spatial conflicts, time and cost of project are considered simultaneously in the proposed model to find the optimum solution.

Design/methodology/approach

In the first step, a 5D simulation model is developed that includes time, cost and geometrical information of a project. Then, time-cost trade-off analysis was carried out to distinguish optimum schedule. The schedule was imported to the 5D CAD model to detect spatial conflicts. Finally, a novel algorithm was implemented to solve identified conflicts while imposing minimum project’s time and cost. Several iterations are performed to resolve all clashes using conflict resolution algorithm and visual simulation model.

Findings

The proposed methodology in this research was applied to a real case. Results showed that in comparison to the normal and initial schedule with 19 conflicts, the finalized schedule has no conflict, while time and cost of the project are both reduced.

Research limitations/implications

Implementing the proposed methodology in construction projects requires proper technical basis in this field. In this regard, the executive user should have a proper understanding of the principles, concepts and tools of building information modeling and have project management knowledge. Also, the implementation conditions of the basic model requires the determination of the construction methods, estimated volumes of working items, scheduling and technical specification. The designed methodology also has two limitations regarding to its implementation. The first is the fact that strategies should be applied manually to the schedule. The other one pertains to the number of strategies used in the research. Four strategies have been used in the conflict resolution algorithm directly and the two others (spatial divisibility and activities breakdown strategies) have been used as default strategies in the visual simulation model. Since the unused strategies including the changing of construction method and the activity resources are subjective and depend upon the planner and project manager’s personal opinion, the authors have avoided using them in this research.

Practical implications

The method proposed in this research contributes the coordination of the working teams at the planning and execution phases of the project. In fact, the best location and work direction for each working team is presented as a schedule, so that the space conflict may not come about and the cost can be minimized. This visual simulation not only deepens the planners’ views about the executive barriers and the spatial conditions of the worksite, it also makes the construction engineers familiar on a daily basis with their executive scope. Therefore, it considerably improves the interactions and communication of the planning and construction teams. Another advantage and application of this methodology is the use of initial and available projects’ documents including the schedule and two-dimensional drawings. The integration of these basic documents in this methodology helps identify the spatial conflicts efficiently. To achieve this, the use of the existing and widely-used construction tools has facilitated the implementation of the methodology. Using this system, planners have applied the strategies in an order of priority and can observe the results of each strategy visually and numerically in terms of time, cost and conflicts. This methodology by providing the effective resolution strategies guides the practitioner to remove conflicts while optimum time and cost are imposed to project.

Originality/value

Contrary to the previous models that ignore cost, the proposed model is a 5D visual simulation model, which considers the variable of cost as a main factor for conflict identification and resolution. Moreover, a forward-pass approach is introduced to implement resolution strategies that are novel compared to other investigations.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 2 October 2017

Abdolhosein Haddad, Danial Rezazadeh Eidgahee and Hosein Naderpour

The purpose of this study is to introduce a relatively simple method of probabilistic analysis on the dimensions of gravity retaining walls which might lead to a more accurate…

319

Abstract

Purpose

The purpose of this study is to introduce a relatively simple method of probabilistic analysis on the dimensions of gravity retaining walls which might lead to a more accurate understanding of failure. Considering the wall geometries in the case of allowable stress design, the probability of wall failure is not clearly defined. The available factor of safety may or may not be sufficient for the designed structure because of the inherent uncertainties in the geotechnical parameters. Moreover, two cases of correlated and uncorrelated geotechnical variables are considered to show how they affect the results.

Design/methodology/approach

This study is based on the failure and stability of gravity retaining walls which can be stated in three different modes of sliding, overturning and the foundation-bearing capacity failure. Each of these modes of failure might occur separately or simultaneously with a corresponding probability. Monte Carlo simulation and Taylor series method as two conventional methods of probability analysis are implemented, and the results of an assumed example are calculated and compared together.

Findings

The probability analysis of the failure in each mode is calculated separately and a global failure mode is introduced as the occurrence of three modes of sliding, overturning and foundation-bearing capacity failure. Results revealed that the global mode of failure can be used along with the allowable stress design to show the probability of the worst failure condition. Considering the performance and serviceability level of the retaining structure, the global failure mode can be used. Furthermore, the correlation of geotechnical variables seems to be relatively more dominant on the probability of global failure comparing to each mode of failure.

Originality/value

The introduced terminology of global mode of failure can be used to provide more information and confidence about the design of retaining structures. The resulted graphs maintain a thorough insight to choose the right dimensions based on the required level of safety.

Details

World Journal of Engineering, vol. 14 no. 5
Type: Research Article
ISSN: 1708-5284

Keywords

Access Restricted. View access options
Article
Publication date: 14 December 2018

This paper aims to review the latest management developments across the globe and pinpoint practical implications from cutting-edge research and case studies.

202

Abstract

Purpose

This paper aims to review the latest management developments across the globe and pinpoint practical implications from cutting-edge research and case studies.

Design/methodology/approach

This briefing is prepared by an independent writer who adds their own impartial comments and places the articles in context.

Findings

For worksites to attain the highest possible efficiencies, spatial conflicts need to be addressed and minimized. To do this, a combination of 5D CAD models and time-cost trade-off and building information modeling knowledge need to be adopted.

Originality/value

The briefing saves busy executives, strategists and researchers hours of reading time by selecting only the very best, most pertinent information and presenting it in a condensed and easy-to-digest format.

Details

Strategic Direction, vol. 35 no. 2
Type: Research Article
ISSN: 0258-0543