Article
Publication date: 2 December 2019

Kudirat Olabisi Ayinla, Franco Cheung and Abdel-Rahman Tawil

This study aims to develop a more inclusive working definition and a formalised classification system for offsite construction to enable common basis of evaluation and…

1048

Abstract

Purpose

This study aims to develop a more inclusive working definition and a formalised classification system for offsite construction to enable common basis of evaluation and communication. Offsite manufacturing (OSM) is continuously getting recognised as a way to increase efficiency and boost productivity of the construction industry in many countries. However, the knowledge of OSM varies across different countries, construction practices and individual experts thus resulting into major misconceptions. The lack of consensus of what OSM is and what constitutes its methods creates a lot of misunderstanding across Architecture Engineering and Construction (AEC) industry professionals, therefore, inhibiting a global view and understanding for multicultural collaboration. Therefore, there is a need to revisit these issues with the aim to develop a deep understanding of the concepts and ascertain what is deemed inclusive or exclusive.

Design/methodology/approach

A state-of-the-art review and analysis of literature on OSM was conducted to observe trends in OSM definitions and classifications. The paper identifies gaps in existing methods and proposes a future direction.

Findings

Findings suggest that classifications are mostly aimed towards a particular purpose and existing classification system are not robust enough to cover all aspects. Therefore, there is need to extend these classification systems to be fit for various purposes.

Originality/value

This paper contributes to the body of literature on offsite concepts, definition and classification, and provides knowledge on the broader context on the fundamentals of OSM.

Access Restricted. View access options
Article
Publication date: 7 September 2015

Usman Naeem, Rabih Bashroush, Richard Anthony, Muhammad Awais Azam, Abdel Rahman Tawil, Sin Wee Lee and M.L. Dennis Wong

This paper aims to focus on applying a range of traditional classification- and semantic reasoning-based techniques to recognise activities of daily life (ADLs). ADL recognition…

262

Abstract

Purpose

This paper aims to focus on applying a range of traditional classification- and semantic reasoning-based techniques to recognise activities of daily life (ADLs). ADL recognition plays an important role in tracking functional decline among elderly people who suffer from Alzheimer’s disease. Accurate recognition enables smart environments to support and assist the elderly to lead an independent life for as long as possible. However, the ability to represent the complex structure of an ADL in a flexible manner remains a challenge.

Design/methodology/approach

This paper presents an ADL recognition approach, which uses a hierarchical structure for the representation and modelling of the activities, its associated tasks and their relationships. This study describes an approach in constructing ADLs based on a task-specific and intention-oriented plan representation language called Asbru. The proposed method is particularly flexible and adaptable for caregivers to be able to model daily schedules for Alzheimer’s patients.

Findings

A proof of concept prototype evaluation has been conducted for the validation of the proposed ADL recognition engine, which has comparable recognition results with existing ADL recognition approaches.

Originality/value

The work presented in this paper is novel, as the developed ADL recognition approach takes into account all relationships and dependencies within the modelled ADLs. This is very useful when conducting activity recognition with very limited features.

Details

International Journal of Pervasive Computing and Communications, vol. 11 no. 3
Type: Research Article
ISSN: 1742-7371

Keywords

Access Restricted. View access options
Article
Publication date: 28 May 2021

Murat Gunduz and Nasser H. Al-Naimi

Delays occur mostly in the construction process of many projects, which can have a consequent effect on the overall performance of the project in areas such as profitability…

994

Abstract

Purpose

Delays occur mostly in the construction process of many projects, which can have a consequent effect on the overall performance of the project in areas such as profitability, efficiency and safety. This study aims to suggest a structure that can be applied to manage construction projects effectively and, thus, to reduce delays. The integrated balanced scorecard (BSC) and quality function deployment (QFD) framework proposed in the present study enabled the identification and ranking of the objectives of the financial perspective and the enablers of construction delay mitigation. This will help construction industry professionals prioritize the enabling factors that influence the financial perspective, thereby helping them focus on the achievement of the most important ones which subsequently results in efficiency. Consequently, more tasks are accomplished with the use of less time and resources as the actions tend to be more narrowly focused on the achievement of the most important factors such as client and contractor-related factors, as opposed to the low-value adding factors.

Design/methodology/approach

A literature review was conducted to determine the essential factors that would help resolve or reduce delays. A total of 41 mitigation factors (seven financial objectives and 36 enabler objectives) were identified and categorized into four BSC perspectives: financial, client, contractor and project management team, and innovation and learning. Two management tools, the BSC and QFD, were used to develop the system based on the mitigation factors defined.

Findings

The results of this study show that the most significant factors affecting the achievement of the financial objectives of the project are mainly customer-related factors, accompanied by factors related to contractors and project management teams. With the fishbone diagram and cause and effect analysis, the proposed BSC and QFD system provides a long-term approach for all stakeholders to help professionals in the construction industry prioritize and reduce delays more effectively. Moreover, the findings of the present study highlight the utility of the integrated BSC and QFD framework in quantifying the strengths of association of different objectives of the financial perspective and the enablers of construction delay mitigation.

Originality/value

The contribution of this paper to the body of knowledge is the proposed integrated structure for BSC and QFD that can serve as a comprehensive and structural approach to rating the essential enabling delay mitigation factors based on the magnitude of their effects on the financial performance of the project. The proposed framework can be considered a novel tool since this is the first integrated BSC and QFD framework for construction delay mitigation. Finally, the proposed BSC and QFD framework, along with the fishbone diagram and cause and effect analysis, provides a long-term strategy for all stakeholders to mitigate delays. Thus, the proposed integrated BSC and QFD framework can serve as a systematic and structural approach for measuring the strength of influence of the enablers of delay mitigation against the financial perspective.

Access Restricted. View access options
Article
Publication date: 23 April 2018

Youcef J.-T. Zidane and Bjorn Andersen

Projects often face delays and unnecessary use of time due to various factors and reasons, and hence suffer from unfavourable consequences. The purpose of this paper is to…

5529

Abstract

Purpose

Projects often face delays and unnecessary use of time due to various factors and reasons, and hence suffer from unfavourable consequences. The purpose of this paper is to identify the universal delay factors from an intensive literature review, complemented by delay factors in major Norwegian construction projects based on empirical data.

Design/methodology/approach

The study in which this paper is based includes an intensive literature review, and semi-quantitative open survey questionnaires. This paper addresses frequency and type of delay factors in construction projects, in Norway based on the survey, and worldwide based on the previous studies.

Findings

From the study, the causes of delays facing the Norwegian construction industry are: poor planning and scheduling; slow/poor decision-making process; internal administrative procedures and bureaucracy within project organisations; resources shortage (human resources, machinery, equipment); poor communication and coordination between parties; slow quality inspection process of the completed work; design changes during construction/change orders; sponsor/owner/client lack of commitment and/or clear demands (goals and objectives); late/slow/incomplete/improper design; office issues; and users’ issues. And the top 10 universal delay factors are: design changes during construction/change orders; delays in payment of contractor(s); poor planning and scheduling; poor site management and supervision; incomplete or improper design; inadequate contractor experience/building methods and approaches; contractor’s financial difficulties; sponsor/owner/client’s financial difficulties; resources shortage (human resources, machinery, equipment); and poor labour productivity and shortage of skills.

Research limitations/implications

When it comes to the identification of delay factors in major Norwegian projects, the research is based on a sample of 202 respondents from an open survey questionnaire. It should be noted that analysing a large population of respondents that have been asked open questions can be challenging due to the vague findings it might lead to. Also, when it comes to the identification of the universal delay factors, there were different methods used by different authors, within different context. Similar future studies in Norway based on qualitative and quantitative methods will give better verification for the findings.

Practical implications

This paper has documented the critical delay factors/causes in Norway. The results of this study will help project managers, in Norway and elsewhere, to be aware and know about the potential causes of delay in their construction projects, which will help to identify the possible risks in the early phases of the project. Another practical implication is to make project managers and policy makers conscious that delays are quite universal, making it necessary to identify them as a first step.

Social implications

The identification of delays factors and causes can permit projects to implement mitigation actions to avoid delays, thus allowing delivering schools, hospitals and other necessary infrastructure on schedule or ahead of schedule to society.

Originality/value

This paper highlights most (almost all) of the studies in the literature, including to the study done in Norway, concerning the delay factors in construction projects and large construction projects in general. This wide review of relevant literature will save time other academicians from having to conduct similar studies. This study will assist both academic and professional experts providing more insight about the delay causes in large-scale construction projects.

Details

International Journal of Managing Projects in Business, vol. 11 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Available. Content available
2357

Abstract

Details

Kybernetes, vol. 41 no. 7/8
Type: Research Article
ISSN: 0368-492X

Access Restricted. View access options
Article
Publication date: 2 March 2015

Abdulaziz M. Jarkas and Theodore C. Haupt

The purpose of this paper is to identify, explore, rank the relative importance and determine the prevalent allocation response trends of the major construction risk factors…

3409

Abstract

Purpose

The purpose of this paper is to identify, explore, rank the relative importance and determine the prevalent allocation response trends of the major construction risk factors considered by general contractors operating in the State of Qatar.

Design/methodology/approach

A structured questionnaire survey comprising 37 potential risk factors was distributed to a statistically representative sample of contractors. The influence ranks of the factors explored were determined using the “Relative Importance Index (RII)” technique, whereas the prevalent trend of contractors’ attitudes toward risk allocation of each factor investigated was quantified and expressed as a percentage, based on the number of respondents who selected a specific option, in relation to the total number of respondents.

Findings

The results obtained indicate that risks related to the “client” group are perceived as most critical, followed by the “consultant”, “contractor” and “exogenous” group-related factors, respectively. The outcomes further show that the “transfer” option is the contractors’ prevalent response to “client” and “consultant”-related risks, while the “retention” decision is the principal pattern linked to “contractor” and “exogenous” group-related risk factors.

Research limitations/implications

The dominant respondents’ perception that the crucial construction risks are related to clients and consultants suggests that these two parties have an essential role in controlling the negative ramifications of the associated factors.

Practical implications

The findings suggest that increasing designers’ awareness of the significant effect of applying the constructability concept can considerably help reducing the risks concomitant of the construction operation. Policy makers may contribute, moreover, in alleviating the risk of incompetent technical staff and operatives’ employment by controlling the migration of inexperienced and unskilled construction workforce into the State.

Originality/value

Given the knowledge gap for the major construction risk factors considered by general contractors in Qatar, the results reported in this study can provide clients, industry practitioners and policy makers with guidance to effectively manage the significant risks determined, which can further assist in achieving a reasonable level of competitiveness and cost-effective operation.

Details

Journal of Engineering, Design and Technology, vol. 13 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 7 December 2020

Aliyeh Kazemi, Eun-Seok Kim and Mohammad-Hossein Kazemi

Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is…

473

Abstract

Purpose

Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects.

Design/methodology/approach

In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized.

Findings

The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects.

Research limitations/implications

These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts.

Originality/value

The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized.

Details

International Journal of Energy Sector Management, vol. 15 no. 3
Type: Research Article
ISSN: 1750-6220

Keywords

Access Restricted. View access options
Article
Publication date: 30 July 2020

Mukhtar A Kassem, Muhamad Azry Khoiry and Noraini Hamzah

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are…

1246

Abstract

Purpose

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are opting to optimize the project mainly to mitigate the source of risks in construction to achieve the project expectation. Risk factors cause a threat to the project objectives regarding time, cost and quality. It is additionally a vital component in deviating from the client's expectation of productivity, safety and standards. This research aims to investigate the causes of risk in the oil and gas construction projects in Yemen.

Design/methodology/approach

A comprehensive literature review from various sources including books, conference proceedings, the Internet project management journals and oil and gas industry journals was conducted to achieve the objectives of this study. This initial work was predicated strictly on a literature review and the judgments of experts to develop the risk factor framework for the oil and gas construction projects in Yemen.

Findings

The authors found a few studies related to risk factors in oil and gas construction projects and shared a similar view about general construction projects. However, only a fraction of the factors accepted have included the variances of other studies on a regional basis or specific countries, such as the Yemen situation, due to the differences between the general construction industry and oil and gas industry. Moreover, the factors of these attributes were still accepted due to their applicability to the oil and gas industry, and no significant variances existed between countries. Research has indicated that 51 critical factors cause risks in the oil and gas construction projects in Yemen. Such risk factors can be divided into two major groups: (1) internal risk factors, including seven critical sources of risks, namely client, contractor, consultant, feasibility study and design, tendering and contract, resources and material supply and project management; and (2) external risk factors, including six sources of critical risk factors, namely national economic, political risk, local people, environment and safety, security risk and force-majeure-related risk factors. A risk factor framework was developed to identify the critical risk factors in the oil and gas construction projects in Yemen.

Research limitations/implications

This research was limited to the oil and gas construction projects.

Practical implications

Practically, this study highlights the risk factors that cause a negative effect on the success of oil and gas construction projects in Yemen. The identification of these factors is the first step in the risk management process to develop strategic responses for risks and enhance the chances of project success.

Social implications

The identification of risks factors that cause the failure of construction projects helps develop response strategies for these risks, thereby increasing the chances of project success reflected in the oil and gas sector, which is a main tributary of the national economy in developing countries.

Originality/value

This research is the pioneer for future investigations into this vital economic sector. Given the lack of resources and studies in the field of construction projects for the Yemeni oil and gas sector, the Yemeni government, oil companies and researchers in this field are expected to benefit from the results of this study. The critical risk factors specific to the oil and gas construction projects in Yemen should be further investigated with focus only on Yemen and its oil and gas industry players.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 21 January 2022

Wisdom Apedo Deku, Jiuhe Wang and Narain Das

Small and medium enterprises (SMEs) do not need only traditional marketing strategies in the dynamic business environment of the manufacturing sector. Entrepreneurial marketing…

2066

Abstract

Purpose

Small and medium enterprises (SMEs) do not need only traditional marketing strategies in the dynamic business environment of the manufacturing sector. Entrepreneurial marketing dimension (EMD) is an alternative marketing approach for SMEs. Therefore, this paper aims to investigate whether EMD innovation has a positive and significant effect on SMEs performance on Ghanaian Halal food and beverages.

Design/methodology/approach

Correlative descriptive research method was used and 432 questionnaires with five-point Likert scale were distributed among owners-managers of manufacturing sectors of Ghanaian Halal food and beverages SMEs producers were chosen by a simple random sampling method. Structural equations modelling structural equations modelling techniques was used to analyse data.

Findings

The result of data analysis indicates a positive and significant effect of EMD on manufacturing SMEs performances of Halal food. Nevertheless, the effect of EMD on the production performance of the aforementioned companies is confirmed positive. The findings also show that production performances of Halal food SMEs result in their financial performance.

Research limitations/implications

The study’s sample is limited to Halal food SMEs manufacturing in Ghana. More research can be done investigating this relationship from different sectors and in Islamic and non-Islamic countries.

Practical implications

This research implies that Halal food SMEs manufacturing producers in a country is imperative in Muslim-minority countries. This study gives a benchmark for the non-Muslim-majority countries which endeavour to embark on the Halal SMEs manufacturing food. Muslim-minority countries that envision to succeed in the global Halal market could emulate Ghana’s approach in branding itself as a recognised non-Muslim-majority country in producing Halal foods. This can be done by implementing innovative, proactive, opportunist, risk-taking and customer-oriented initiatives to achieve better market and innovative performances and higher profits.

Originality/value

This paper fills a knowledge gap by presenting the first comprehensive overview of Halal food SMEs manufacturing performance research that enhances the ongoing discussion in hospitality, entrepreneurship and marketing fields in Islamic and non-Islamic contexts.

Access Restricted. View access options
Article
Publication date: 6 November 2017

Adekunle Sabitu Oyegoke and Naseer Al Kiyumi

Project delay is becoming a problem in the Sultanate of Oman as evidenced by many delayed projects across the country. The purpose of this study is to examine causes and effects…

1339

Abstract

Purpose

Project delay is becoming a problem in the Sultanate of Oman as evidenced by many delayed projects across the country. The purpose of this study is to examine causes and effects of delays in megaprojects in the Sultanate of Oman with recommendations to mitigate same.

Design/methodology/approach

A systematic review of literature identifies through main stakeholders the numerous causes, impacts and methods of mitigating delay from previous studies. A questionnaire survey on Oman was carried out to sample opinions from the practitioners; 53 questionnaires were received and analysed using the relative importance index (RII) method.

Findings

The five most frequent causes of delay in the Sultanate of Oman, in rank order, are: selection of the lowest bid, instead of best bid for the client (RII: 0.698); the financial condition of the main contractor (RII: 0.664); delay in decision-making by the client (RII: 0.656); and poor construction planning by the main contractor (RII: 0.649). Also, the findings indicate that extra cost (RII: 0.754) and project time overrun (RII: 0.724) are the most significant effects of the delay in the Oman megaprojects. The use of experienced contractors and consultant (RII 0.675), efficient construction planning by the main contractor and effective site management and supervision (RII: 0.667) are essential mitigation methods of construction delay in Oman megaprojects.

Originality/value

The study recommends three-part novel solutions to mitigate delay in the Oman construction industry.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 3
Type: Research Article
ISSN: 1366-4387