Search results

1 – 10 of over 1000
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The…

Abstract

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Access Restricted. View access options
Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that…

Abstract

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that support the practice of the CSC were examined in both countries. It was discovered from the review of literature that the UK has a more detailed report targeted at improving the CSC than Australia. However, both countries have a common factor affecting their CSC which originates from fragmentation experienced within their supply chain. Construction stakeholders in the UK and Australia believe that collaboration and integration are vital components for improving performance. The majority of the contractors in both countries embrace collaborative working for the sole purpose of risk sharing, access to innovation and response to market efficiency. However, most of the models developed for managing the CSC in the UK are built around building information modelling (BIM). Also, the reviewed studies show that supply chain management practice will be effective following the following principle: shared objectives, trust, reduction in a blame culture, joint working, enhanced communication and information-sharing. Finally, the UK has a more established framework and more CSC models compared to Australia.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Access Restricted. View access options
Book part
Publication date: 12 February 2024

Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien

In the quest for better construction workforce management, this chapter explored the background of workforce management and related theories, models, and practices. Through a

Abstract

In the quest for better construction workforce management, this chapter explored the background of workforce management and related theories, models, and practices. Through a review, the chapter provided meaning to the concept of construction and workforce management. The chapter concluded that while the construction industry worldwide is important to the economic growth of the countries where it operates, the industry’s management of its workforce is challenged by several problems. These problems include the nature of the industry, skill shortage, unhealthy working environment, and poor image of the industry, among others. Also, while the construction industry is rich in diversity, this has been a major source of problems for workforce management. The chapter further revealed that to improve workforce management and attain better-performing construction organisations, careful recruitment, effective training, providing a safe working environment, putting policies to promote diversity, and ensuring innovativeness, among others, are essential.

Details

Construction Workforce Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-83797-019-3

Keywords

Access Restricted. View access options
Book part
Publication date: 1 July 2024

Bernard Arthur-Aidoo, Princess Naa Kwarkai Quartey, Perry Ransgreg Nunoo and Alex Kwaku Adzinku

Creating our built environment is largely the responsibility of the dynamic and complex construction industry. This business is made up of a wide range of people who work together…

Abstract

Creating our built environment is largely the responsibility of the dynamic and complex construction industry. This business is made up of a wide range of people who work together to construct buildings and infrastructure projects, from contractors and labourers to architects and engineers. Aside from its observable results, the construction sector has a particular culture and atmosphere that are formed by a special fusion of history, creativity and teamwork. The culture and environment in which the construction industry functions are the main topics of this section of the book.

Details

Breaking Ground
Type: Book
ISBN: 978-1-83549-638-1

Keywords

Access Restricted. View access options
Article
Publication date: 1 March 2010

Ahmed Doko Ibrahim, Andrew Price, Malik M. A. Khalfan and Andrew Dainty

In the UK healthcare sector, funding and provision of public care facilities has been primarily the responsibility of government through the National Health Service (NHS). After…

503

Abstract

In the UK healthcare sector, funding and provision of public care facilities has been primarily the responsibility of government through the National Health Service (NHS). After decades of under-investment and consequent effects on the quality of care, new procurement routes are currently being used to improve the standards of facilities to meet the requirements of modern care services. This paper critically reviews these new procurement routes in terms of concepts and suitable areas of application, and examines how the principal procurement methods have evolved into the forms used for UK healthcare facilities. The paper outlines recommendations for further research in assessing the suitability or otherwise of these new procurement methods, both for construction projects generally and specifically for healthcare facilities.

Details

Journal of Public Procurement, vol. 10 no. 1
Type: Research Article
ISSN: 1535-0118

Access Restricted. View access options
Book part
Publication date: 5 October 2018

Long Chen and Wei Pan

With numerous and ambiguous sets of information and often conflicting requirements, construction management is a complex process involving much uncertainty. Decision makers may be…

Abstract

With numerous and ambiguous sets of information and often conflicting requirements, construction management is a complex process involving much uncertainty. Decision makers may be challenged with satisfying multiple criteria using vague information. Fuzzy multi-criteria decision-making (FMCDM) provides an innovative approach for addressing complex problems featuring diverse decision makers’ interests, conflicting objectives and numerous but uncertain bits of information. FMCDM has therefore been widely applied in construction management. With the increase in information complexity, extensions of fuzzy set (FS) theory have been generated and adopted to improve its capacity to address this complexity. Examples include hesitant FSs (HFSs), intuitionistic FSs (IFSs) and type-2 FSs (T2FSs). This chapter introduces commonly used FMCDM methods, examines their applications in construction management and discusses trends in future research and application. The chapter first introduces the MCDM process as well as FS theory and its three main extensions, namely, HFSs, IFSs and T2FSs. The chapter then explores the linkage between FS theory and its extensions and MCDM approaches. In total, 17 FMCDM methods are reviewed and two FMCDM methods (i.e. T2FS-TOPSIS and T2FS-PROMETHEE) are further improved based on the literature. These 19 FMCDM methods with their corresponding applications in construction management are discussed in a systematic manner. This review and development of FS theory and its extensions should help both researchers and practitioners better understand and handle information uncertainty in complex decision problems.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Access Restricted. View access options
Article
Publication date: 1 December 2006

A D Ibrahim, A D F Price and A R J Dainty

Governments throughout the world are being forced to review how to fund the increasing demand and rising expectations of their citizens. This is especially relevant for developing…

1915

Abstract

Governments throughout the world are being forced to review how to fund the increasing demand and rising expectations of their citizens. This is especially relevant for developing countries, which often have limited capital resources to meet the soaring needs for essential infrastructure. This has consequently led to increased involvement of the private sector in the provision of public services, using various forms of Public‐Private Partnerships (PPPs). It is, however, important for both the public and private sectors to understand the various risks associated with PPPs throughout the whole life cycle of the projects in order to guarantee long‐term success. This is especially true in Nigeria and other countries where the use of PPPs are still in the early stages of development. Sixty‐one PPP risk factors were identified from literature and classified into exogenous and endogenous risks. This paper presents the results of the questionnaire survey that investigated the perception of Nigerian construction professionals on the relative importance of the identified risks and their preferences of allocation between the public and private sectors. The results show that the three most important PPP risk factors in Nigeria are “unstable government”, “inadequate experience in PPP” and “availability of finnance”. The respondents’ risk allocation preferences show that while most of the endogenous risk factors could be assigned to the private sector partner, the public sector should retain political and site acquisition risks, while relation‐ship‐based risks should be shared between the private and public sector partners

Details

Journal of Financial Management of Property and Construction, vol. 11 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Article
Publication date: 1 February 2000

ANDREW R.J. DAINTY, BARBARA M. BAGILHOLE and RICHARD H. NEALE

In order to retain and motivate employees, organizations must respond to their expectations, both in terms of meeting formal aspects of their employment contracts and in…

748

Abstract

In order to retain and motivate employees, organizations must respond to their expectations, both in terms of meeting formal aspects of their employment contracts and in addressing their less formal expectations of the employment relationship. Within the current human resources management (HRM) literature, these informal expectations are known as psychological contracts. This paper reports on research that explored psychological contracts within the construction industry. In‐depth interviews were held with more than 80 construction managers and professional staff who worked for five large UK contracting organizations. The interviewees were asked to describe their career histories, and to discuss any tensions between the personnel policies of their organizations and their personal career aspirations and expectations. It emerged that responsibility for human resource development (HRD) had been largely devolved to divisional and operational management. This led to HRD becoming fragmented and unresponsive, and to employees becoming disillusioned by their employers' failure to meet their expectations. It is argued that construction companies require a more sophisticated understanding of their employees' expectations of the employment relationship if they are to be retained in the long term.

Details

Engineering, Construction and Architectural Management, vol. 7 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Book part
Publication date: 12 February 2024

Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien

This first chapter provides a general overview of the book. The chapter describes workforce management and the lack of adequate attention to this concept within construction…

Abstract

This first chapter provides a general overview of the book. The chapter describes workforce management and the lack of adequate attention to this concept within construction organisations. In the fourth industrial revolution era, where emerging technologies have continued to change how business functions, the need for an effective approach towards managing the construction workforce becomes crucial. Having a construction workforce management practice model was deemed vital at this point, where technological advancement is rapidly changing the construction environment, and skill shortage is evident in the construction industry of most countries around the world. As such, this chapter establishes that the development of a construction workforce management model that will help improve the management of construction workers serves a critical value of the book.

Details

Construction Workforce Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-83797-019-3

Keywords

Access Restricted. View access options
Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

This chapter presented the model for the effective practice of construction supply chain management (CSCM) in the fourth industrial revolution (4IR) era. The model was developed…

Abstract

This chapter presented the model for the effective practice of construction supply chain management (CSCM) in the fourth industrial revolution (4IR) era. The model was developed after discovering that the failure of adopting the 4IR component has hindered the synchronisation of construction supply chain (CSC) activities. While some stakeholders are willing to manage their CSC under the 4IR era, most have no clue how to go about it. Most stakeholders are familiar with an existing practice built around collaboration, integration, supply chain structure and trust. This chapter bridges the gap by introducing organisational culture and 4IR components for modelling the CSCM in the 4IR era. The model was backed and grounded with a robust theoretical framework. The theories include social identity theory, change theory and resource-based view theory. It was discovered that the organisational culture adopted by construction stakeholders determines their willingness to embrace the 4IR component for the management of CSC. The 4IR components were divided into smart management, virtualisation and cyber-physical systems. The chapter recommended that the practice of SCM in the Nigerian construction industry should be modelled around the six constructs that were used in developing the model for this study.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

1 – 10 of over 1000
Per page
102050