Open Access
Article
Publication date: 27 September 2021

Monique Rieger Rodrigues and Søren Munch Lindhard

The traditional construction delivery method is challenged by low trust and collaboration issues, resulting in increased project costs. The integrated project delivery (IPD…

7421

Abstract

Purpose

The traditional construction delivery method is challenged by low trust and collaboration issues, resulting in increased project costs. The integrated project delivery (IPD) method is developed, through a contractual agreement, to overcome these challenges by creating a common set of terms, expectations and project goals.

Design/methodology/approach

A singular construction case was followed during a four-month period. Data collection consisted of contract documents and a series of semi-structured interviews with representatives from the owner, design-group and contractors.

Findings

The IPD contract was found to have a number of positive effects; it improved project behavior (e.g. trust, collaboration and communication), increased ownership among project participants and improved buildability of the design, leading to fewer surprises and interruptions in the construction phase. The study also revealed a number of challenges including contractual and legal challenges and involving too many participants in the early phases. Moreover, co-location was identified as a particular important supporting element, to build relations and improve collaboration.

Originality/value

This research identified lessons learned from the application, as well as initial barriers and persistent barriers for implementing IPD. To improve IPD application the top three lessons were as follows: 1) the contractual documents should be adapted and signed at an early stage as this increases financial transparency, 2) cost estimates should be carried as an iterative process and project main concept be freezed at an early stage to increase understanding and minimize risks, 3) only the most important project developers should be involved in the early phases, to avoid going into detailed design issues before the main concept is completed.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 December 2023

Søren Munch Lindhard, Astrid Heidemann Lassen, Yang Cheng, Matteo Musso, Geng Wang and Shaoping Bai

Exoskeletons are moving into industries with the potential to reduce muscle strains and prevent occupational injuries. Although exoskeletons have been designed and tested in…

Abstract

Purpose

Exoskeletons are moving into industries with the potential to reduce muscle strains and prevent occupational injuries. Although exoskeletons have been designed and tested in laboratory settings, rare empirical studies of their application in construction have been reported. Therefore, the purpose of this study is on in a real-life setting testing the applicability of adopting exoskeletons in the construction industry.

Design/methodology/approach

A feasibility study of exoskeletons in construction is conducted by testing a passive exoskeleton, designed for shoulder support. Five bricklayers tested in a two-month period the exoskeleton, each wearing it for a three-day period while carrying out normal work activities. Test data in terms of interviews were collected and analyzed using qualitative content analysis.

Findings

The application of exoskeletons in construction revealed several limitations, where the two primary ones are the exoskeleton is not designed while considering the tasks of a bricklayer causing several challenges and the exoskeleton only supports a single upward motion while limiting other movements and even counteracted when a downward movement was necessary.

Originality/value

The identified challenges could easily have been revealed by coupling the design and testing of exoskeletons to actual application. Thus, the design approach needs to be reversed. Instead of designing an exoskeleton to support a specific body part or motion and then identifying where it is applicable, it should target specific industries and focus on the actual work and movements and the necessary support. As part of the change, the design metrics should be reevaluated to reflect the work to support.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 June 2023

Diana Salhab, Søren Munch Lindhard and Farook Hamzeh

Compressing the schedule by using overlapping activities is a commonly adopted approach for accelerating projects. However, this approach might channel a variety of risks into the…

Abstract

Purpose

Compressing the schedule by using overlapping activities is a commonly adopted approach for accelerating projects. However, this approach might channel a variety of risks into the construction processes. Risks imply waste; still, evaluating the effects of using overlapping activities on schedule quality has been a looming gap in construction research. Therefore, this paper aims to study the quality of overlapping in terms of emerging waste and to demarcate the boundaries of the overlapping envelope.

Design/methodology/approach

This study presents a method for assessing the consequences of implementing overlapping activities in a schedule on two types of waste namely waiting time and variation gap. A critical path method (CPM) network including eleven activities is modeled stochastically where the durations of individual activities are sampled as beta-distributions. Using program evaluation and review technique (PERT) assumptions to calculate the schedule dates, the network is simulated for various amounts of overlapping and the corresponding waste is quantified each time.

Findings

Results show that not only the returns on overlapping are diminishing after a certain overlap percentage, but also waste in the production system increases. Particularly, results reveal that compressing the schedule leads to a decrease in variation gaps, but at the same time, it leads to a larger increase in waiting times, which creates more waste.

Originality/value

The presented study shows through simulation how overlapping activities affects productivity by identifying wastes. It shows that despite the apparent gains, overlaps should be used with caution, and while considering the side-effects of increased waste which introduces a need for increased managerial awareness.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 12
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 January 2023

Simon Wyke, Søren Munch Lindhard and Jesper Kranker Larsen

Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as…

Abstract

Purpose

Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as identified in previous research. This has led to a need for better understanding how factors affecting cost and time overruns on public construction projects can be managed more efficiently. The purpose of this paper is to address these issues.

Design/methodology/approach

In this study 26 factors affecting cost and time overruns on construction projects were identified, through qualitative interviews with project managers from Danish governmental agencies and through a literature review. Through principal component analyses the 26 factors were subsequently narrowed down to four primary latent factors.

Findings

The identified four latent factors affecting cost and time overruns on public construction projects were lack of quality management, lack of project pre-planning, lack of user management and lack of project management.

Originality/value

Previous research has focussed on increasing knowledge by identifying and ranking factors affecting time and cost performance. This has led to the identification of an overwhelming number of factors to use for managing construction projects. The present research reduced the number of factors by clustering them into key latent factors responsible for most of the deviation in performance, narrowing the scope of construction cost and time management into a few tangible key focus areas. This supports and improves fast decision-making that is necessary in a changeable environment such as construction.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords