Search results

1 – 10 of 39
Content available
Book part
Publication date: 8 January 2021

Abstract

Details

Generation Impact
Type: Book
ISBN: 978-1-78973-929-9

Content available
Book part
Publication date: 8 January 2021

Abstract

Details

Generation Impact
Type: Book
ISBN: 978-1-78973-929-9

Content available
Article
Publication date: 5 May 2015

Bob Doherty

758

Abstract

Details

Social Enterprise Journal, vol. 11 no. 1
Type: Research Article
ISSN: 1750-8614

Content available
Article
Publication date: 23 November 2018

Alex Opoku, Peter Guthrie and Vian Ahmed

359

Abstract

Details

Journal of Facilities Management, vol. 16 no. 3
Type: Research Article
ISSN: 1472-5967

Open Access
Book part
Publication date: 1 May 2019

Abderisak Adam and Göran Lindahl

The purpose of this paper is to examine the Company Dynamic Response Map (CDRM) risk management model that uses the dynamic capabilities concept. The study examines risks…

Abstract

Purpose

The purpose of this paper is to examine the Company Dynamic Response Map (CDRM) risk management model that uses the dynamic capabilities concept. The study examines risks associated with strategic decision-making in construction projects and evaluates proposed methods that connect the dynamic capabilities of project-based organisations with risk management.

Design/Methodology/Approach

This preliminary study examines risks associated with strategic decision-making in construction projects and evaluates a proposed model that connects the dynamic capabilities of project-based organisations with risk management. Specifically, the CDRM model is evaluated, a risk management model developed by Arena et al. (2013) to better respond to risks and opportunities based on the concept of dynamic capabilities.

Findings

We argue that although the CDRM presents a promising development in that it uses dynamic capabilities prospectively in a risk management model to produce tangible results, there are, nonetheless, impediments to the CDRM being used by construction clients. The primary impediment relates to the issue of categorisation, the difficulty in assigning a specific identified risk to a particular category of dynamic capabilities.

Research Limitations/Implications

A conceptual argument is made and not an empirical one.

Practical Implications

The CDRM model was developed to be used in practice and this paper evaluates that model.

Originality/Value

Contributes to both the dynamic capabilities literature as well as risk management literature. The paper ends with a discussion on the possible merits of the CDRM, and an evaluation on potential impediments to its use by construction clients.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Content available
Book part
Publication date: 12 April 2024

Glenys Caswell

Abstract

Details

Time of Death
Type: Book
ISBN: 978-1-80455-006-9

Content available
Book part
Publication date: 24 June 2024

Noel Scott, Brent Moyle, Ana Cláudia Campos, Liubov Skavronskaya and Biqiang Liu

Abstract

Details

Cognitive Psychology and Tourism
Type: Book
ISBN: 978-1-80262-579-0

Content available
Article
Publication date: 1 September 2002

40

Abstract

Details

Library Hi Tech News, vol. 19 no. 9
Type: Research Article
ISSN: 0741-9058

Content available
Book part
Publication date: 20 September 2021

Abstract

Details

The Professionalisation of Women’s Sport
Type: Book
ISBN: 978-1-80043-196-6

Content available
Book part
Publication date: 11 July 2024

Graham Crow

Abstract

Details

The Emerald Guide to Ann Oakley
Type: Book
ISBN: 978-1-80071-561-5

1 – 10 of 39