Search results
1 – 1 of 1Fatma Betül Yeni, Beren Gürsoy Yılmaz, Behice Meltem Kayhan, Gökhan Özçelik and Ömer Faruk Yılmaz
This study aims to address challenges related to long lead time within a hazelnut company, primarily attributed to product quality issues. The purpose is to propose an integrated…
Abstract
Purpose
This study aims to address challenges related to long lead time within a hazelnut company, primarily attributed to product quality issues. The purpose is to propose an integrated lean-based methodology incorporating a continuous improvement cycle, drawing on Lean Six Sigma (LSS) and Industry 4.0 applications.
Design/methodology/approach
The research adopts a systematic approach, commencing with a current state analysis using VSM and fishbone analysis to identify underlying problems causing long lead time. A Pareto analysis categorizes these problems, distinguishing between supplier-related issues and deficiencies in lean applications. Lean tools are initially implemented, followed by a future state VSM. Supplier-related issues are then addressed, employing root cause analyses and Industry 4.0-based countermeasures, including a proposed supplier selection model.
Findings
The study reveals that, despite initial lean implementations, lead times remain high. Addressing supplier-related issues, particularly through the proposed supplier selection model, significantly reduces the number of suppliers and contributes to lead time reduction. Industry 4.0-based countermeasures ensure traceability and strengthen supplier relationships.
Originality/value
This research introduces a comprehensive LSS methodology, practically demonstrating the application of various tools and providing managerial insights for practitioners and policymakers. The study contributes theoretically by addressing challenges comprehensively, practically by showcasing tool applications and managerially by offering guidance for system performance enhancement.
Details