Matthew Ikuabe, Clinton Ohis Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS)…
Abstract
Purpose
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS). The system’s high computational capabilities can aid in the abatement of some of the challenges plaguing FM functions. However, the requisite ingredients for the uptake of the system for FM have still not gained scholarly attention. Because performance measurement is a vital index in determining the outcome of FM methods, this study aims to investigate the influence of performance measurement indicators that are influential to the uptake of CPS for delivering FM functions.
Design/methodology/approach
A qualitative technique was adopted using the Delphi technique. The panel of experts for the study was selected through a well-defined process based on stipulated criteria. The experts gave their opinions in two rounds before consensus was attained on the identified performance measurement indicators, whereas methods of data analysis were measures of central tendency, inter-quartile deviation and Mann–Whitney U test.
Findings
Results from this study showed that 11 of the performance indicators were of very high significance in the determination of the uptake of CPS for FM functions, whereas 5 of the indicators were proven to be of high significance. Furthermore, there was no statistical difference in the opinions of the experts based on their affiliation with academic institutions and professional practice.
Practical implications
The findings of this study contribute practically by aiding policymakers, facility managers and relevant stakeholders with the vital knowledge of delivery mandates for efficient FM services that can spur the uptake of digital technologies such as CPS.
Originality/value
This study contributes to the body of knowledge as it unveils a roadmap of the expected performance output and its accompanying evaluation that would drive the adoption of a promising technology such as CPS in the delivery of FM tasks.
Details
Keywords
James Olaonipekun Toyin and Modupe Cecilia Mewomo
The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies…
Abstract
Purpose
The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies revealed a low level of BIM implementation in the context of the Nigerian construction sector. Moreover, previous studies have established that BIM application comes with its share of various barriers. Therefore, this study aims to carry out an on-site survey on barriers to the application of BIM on construction sites in the Nigerian construction industry.
Design/methodology/approach
An extensive review of literature on BIM barriers was conducted, from where 33 factors were identified as significant BIM barriers peculiar to the developing countries. A questionnaire was developed and distributed to the targeted respondents, who are practicing professionals in the Nigerian construction industry, based on the identified barriers. The data collected were analysed by using both descriptive and inferential statistics.
Findings
The principal component analysis revealed that 27 barriers were peculiar to the Nigerian construction industry. The “lack of familiarity with BIM capacity, habitual resistance to change from the traditional style of design and build, and poor awareness of BIM benefit” were identified as the three most critical barriers hindering BIM application on construction sites in the Nigerian construction industry.
Practical implications
This study reveals key information on the peculiar barriers to BIM application in the Nigerian construction industry. The avoidance of these barriers will not only assist various construction stakeholders in the successful implementation of BIM application on a construction project but also promote information management systems and productivity within the construction industry to a great extent. These will further improve post-construction activities.
Originality/value
This study provides a substantial understanding of BIM state of the art in the context of barriers hindering BIM application on construction sites in the Nigerian construction industry.