Kai Zhang, Lingfei Chen and Xinmiao Zhou
Under the trend of global economic integration and the new context of stagflation, frequent fluctuations in international interest rates are exerting far-reaching impacts on the…
Abstract
Purpose
Under the trend of global economic integration and the new context of stagflation, frequent fluctuations in international interest rates are exerting far-reaching impacts on the world economy. In this paper, the transmission mechanism of the impact of fluctuations in international interest rates (specifically, the American interest rate) on the bankruptcy risk in China's pillar industry, the construction industry (which is also sensitive to interest rates), is examined.
Design/methodology/approach
Using an improved contingent claims analysis, the bankruptcy risk of enterprises is calculated in this paper. Additionally, an individual fixed-effects model is developed to investigate the mediating effects of international interest rates on the bankruptcy risk in the Chinese construction industry. The heterogeneity of subindustries in the industrial chain and the impact of China's energy consumption structure are also analysed in this paper.
Findings
The findings show that fluctuations in international interest rates, which affect the bankruptcy risk of China's construction industry, are mainly transmitted through two major pathways, namely, commodity price effects and exchange rate effects. In addition, the authors examine the important impact of China's energy consumption structure on risk transmission and assess the transmission and sharing of risks within the industrial chain.
Originality/value
First, in the research field, the study of international interest rate risk is extended to domestic-oriented industries. Second, in terms of the research content, this paper is focused on China-specific issues, including the significant influence of China's energy consumption structure characteristics and the risk contagion (and risk sharing) as determined by the current development of the Chinese construction industry. Third, in terms of research methods a modified contingent claim analysis approach to bankruptcy risk indicators is adopted for this study, thus overcoming the problems of data frequency, market sentiment and financial data fraud, which are issues that are ignored by most relevant studies.
Details
Keywords
Ornella Tanga Tambwe, Clinton Ohis Aigbavboa and Opeoluwa Akinradewo
Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of…
Abstract
Purpose
Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of construction data risks management (DRM) in the construction industry (CI).
Design/methodology/approach
This study adopted a quantitative method and collected data from various South African construction professionals with the aid of an e-questionnaire. These professionals involve electrical engineers, quantity surveyors, architects and mechanical, as well as civil engineers involved under a firm, or organisation within the province of Gauteng, South Africa. Standard deviation, mean item score, non-parametric Kruskal–Wallis H test and exploratory factor analysis were used to analyse the retrieved data.
Findings
The findings revealed that DRM enhances project and company data availability, promotes confidentiality and enhances integrity, which are the primary benefits of DRM that enable the success of project delivery.
Research limitations/implications
The research was carried out only in the province of Gauteng due to COVID-19 travel limitations.
Practical implications
The construction companies will have their data permanently in their possession and no interruption will be seen due to data unavailability, which, in turn, will allow long-term and overall pleasant project outcomes.
Originality/value
This study seeks to address the benefits of DRM in the CI to give additional knowledge on risk management within the built environment to promote success in every project.
Details
Keywords
Mohamed Saad Bajjou and Anas Chafi
Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do…
Abstract
Purpose
Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do exist in the construction industry, the research topic related to LC implementation is still unexplored due to the scarcity of validated assessment frameworks. This study aims to provide the first attempt in developing a structural model for successful LC implementation.
Design/methodology/approach
This study developed a Lean construction model (LCM) by critically reviewing seven previous LC frameworks from different countries, defining 18 subprinciples grouped into 6 major principles and formulating testable hypotheses. The questionnaire was pre-tested with 12 construction management experts and revised by 4 specialized academics. A pilot study with 20 construction units enhanced content reliability. Data from 307 Moroccan construction companies were collected to develop a measurement model. SPSS V. 26 was used for Exploratory Factor Analysis, followed by confirmatory factor analysis using AMOS version 23. Finally, a structural equation model statistically assessed each construct's contribution to the success of LC implementation.
Findings
This work led to the development of an original LCM based on valid and reliable LC constructs, consisting of 18 measurement items grouped into 6 LC principles: Process Transparency, People involvement, Waste elimination, Planning and Continuous improvement, Client Focus and Material/information flow and pull. According to the structural model, LC implementation success is positively influenced by Planning and Scheduling/continuous improvement (β = 0.930), followed by Elimination of waste (β = 0.896). Process transparency ranks third (β = 0.858). The study demonstrates that all these factors are mutually complementary, highlighting a positive relationship between LC implementation success and the holistic application of all LC principles.
Originality/value
To the best of the authors’ knowledge, this study is the first attempt to develop a statistically proven model of LC based on structural equation modelling analysis, which is promising for stimulating construction practitioners and researchers for more empirical studies in different countries to obtain a more accurate reflection of LC implementation. Moreover, the paper proposes recommendations to help policymakers, academics and practitioners anticipate the key success drivers for more successful LC implementation.
Details
Keywords
Oluseyi Julius Adebowale and Justus Ngala Agumba
Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business…
Abstract
Purpose
Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business failure because of a plethora of factors, including poor productivity. The purpose of this study is to investigate salient issues undermining the productivity of small and medium-sized contractors in South Africa. This study proposes alternative possibilities to engender productivity improvement.
Design/methodology/approach
Qualitative data were collected using semi-structured interviews with 15 contractors in Gauteng Province, South Africa. The research data were analysed using content and causal layered analyses.
Findings
Challenges to contractors’ productivity were associated with inadequately skilled workers, management competence and political factors. Skills development, construction business and political factors were dominant stakeholders’ perceptions. Metaphors for construction labour productivity are presented and reconstructed as alternative directions for productivity improvement.
Practical implications
Contractors lose a substantial amount of South African Rand to poor productivity. Alternative directions provided in this study can be leveraged to increase profitability in construction organizations, enhance the social well-being of South Africans and ultimately improve the contribution of contractors to the South African economy.
Originality/value
The causal layered analysis (CLA) applied in this study is novel to construction labour productivity research. The four connected layers of CLA, which make a greater depth of inquiry possible, were explored to investigate labour productivity in construction organizations.
Details
Keywords
Tushar Jadhav, Rahul Deshpande and Sarel Lavy
In the past few years, India has seen an exponential growth in the built environment sector, which highlights the importance of facility or facilities management (FM). Therefore…
Abstract
Purpose
In the past few years, India has seen an exponential growth in the built environment sector, which highlights the importance of facility or facilities management (FM). Therefore, the purpose of this study is to investigate the expectations, roles and skills required for successful FM operations within the built environment in India. The study also investigates the various educational programmes offered in FM in India.
Design/methodology/approach
This study uses semi-structured interviews with FM practitioners from India. A total of 20 respondents have participated in the semi-structured interviews. The interview questions covered few important areas such as daily roles and responsibilities, skills required, challenges faced and areas for further development, among others. In addition to the semi-structured interviews, a roundtable discussion was also conducted with three FM experts from India.
Findings
The study provides insights in the roles delivered by FM professionals, their challenges and areas of improvement. The study further reveals the lack of formal FM education in India. The findings of this study will also help in the development of academic programmes that will foster research culture and assist in overcoming challenges faced by the FM sector.
Originality/value
There is limited research available that addresses the FM requirements for India. In addition, there is no research available that addresses the FM education in Indian context. This paper throws light on the FM requirements in India and provides the necessary inputs for enhancing FM education in India.