Search results

1 – 10 of 28
Article
Publication date: 21 August 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of…

Abstract

Purpose

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of diverse stakeholders. Conducting a bibliometric analysis, this paper aims to unravel the major research themes and methodologies utilised by researchers in studying the critical success criteria for construction projects, as well as extracting these success criteria.

Design/methodology/approach

The researchers systematically searched and screened 95 papers from Scopus and Web of Science (WoS) databases. This study conducted research focus parallelship network (RFPN) analysis and keywords co-occurrence network (KCON) analysis using BibExcel and Gephi to cluster the papers, illuminate the relationships among keywords within each cluster, and identify the primary research directions.

Findings

Using the RFPN analysis, this study classified the papers into three distinct clusters: infrastructure and public projects success, risk and knowledge management, and contractors and procurement management. Statistical techniques such as structural equation modelling (SEM) and multi-criteria decision-making methods such as analytic hierarchy process (AHP) have been used to analyse project success in the construction industry.

Research limitations/implications

Considering the intensified demand for streamlined digital interactions and the increasing emphasis on sustainability and safety performance, construction companies are recommended to allocate greater investments toward the automation and digitisation of their products and processes. Prioritising modular construction and embracing transformative technologies alongside data science is crucial for enabling well-informed decision-making, and enhancing project success.

Originality/value

This study contributes to the existing body of knowledge by conducting a quantitative and systematic evaluation of the literature on project success criteria in the construction industry and uncovering key research areas. It addresses the pressing need to understand the complexities of construction projects amidst evolving industry dynamics and emerging disruptions. Moreover, by highlighting the implications of digital innovations and modular construction, this study urges deeper exploration into their impact on project performance and stakeholder satisfaction. This research sets a comprehensive framework for investigating the interplay between project complexity, technological advancements, and sustainable practices in the construction sector, paving the way for strategic advancements in the field.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 March 2023

Frederick Owusu Danso, Kofi Agyekum, Patrick Manu, Emmanuel Adinyira, Divine K. Ahadzie and Edward Badu

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences…

Abstract

Purpose

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences site workers' risk-taking behaviours during construction. This study aims to examine how construction site workers perceive and judge safety risks in risk-taking behaviours of site workers for intervention safety policy framework that may encourage safe work.

Design/methodology/approach

The study employed Pictorial-based Q-Methodology, which documented 63 picture scenarios of risk-taking behaviours from building sites and submitted them for validation from H&S inspectors. In total, 33 pictures emerged as having great potential to cause harm. After using these 33 pictures to elicit data from randomised site workers, the study used Frequency Tabulation, Relative Importance Index (RII) and Kruskal–Wallis Test to analyse the collected data. To fully explain the analysed data for deeper understanding, the study conducted Focus Group Discussions (FGDs) with these site workers to share the thoughts of site workers on these pictures.

Findings

Two distinctive pictures emerged from these analyses: one showing risk-taking behaviour likely to contract internal and skin disease and the other likely to fall from height. One of the implications is that construction site workers are unfamiliar with the dangerous contaminants in the materials the site workers use to work, which can potentially harm the site workers' skin and internal organs. Hence, site workers continue engaging in risk-taking behaviours. The other is that site workers are aware of and can mention catastrophic physical injuries attached to site workers' jobs. However, site workers continue engaging in risk-taking behaviours because of site workers' safety plights and rely on the favour and mercies of a supreme being as coping strategies to escape from these physical injuries.

Originality/value

This study is original in that the study uses picture scenarios of risk-taking behaviours to amass an empirical-based understanding of how site workers perceive and respond to H&S risks during construction. This piece of evidence is missing in the numerous research studies in this area. Again, the findings contribute to the state-of-the-art literature regarding risk-taking behaviours on construction sites.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 October 2024

Ernest Kissi, Kenneth Eluerkeh, Clinton Aigbavboa, Michael Addy and Prosper Babon-Ayeng

With emerging technologies rapidly changing work processes, it is important to understand the skills and characteristics project managers (PMs) need to effectively manage projects…

Abstract

Purpose

With emerging technologies rapidly changing work processes, it is important to understand the skills and characteristics project managers (PMs) need to effectively manage projects in the digital era. This study determines the underlying competencies needed for digitalization among PMs in the construction industry. The study also identified the most significant competencies needed by PMs in the era of digitalization.

Design/methodology/approach

The methodology adopted for the research study was quantitative. It was founded on a thorough review of pertinent literature, which went through a pilot survey study from six project management experts in the construction industry. Based on the comment and feedback, a questionnaire survey was developed and distributed to participants through a convenience sampling technique. The data retrieved were from 100 professional PMs out of 130 questionnaires distributed in the Ghanaian construction industry. Data collected were analyzed using fuzzy synthetic evaluation (FSE).

Findings

Based on FSE, the three competency parameters (knowledge, skills, personal characteristics) generated significant indices indicating that all three competencies are significant among construction PMs in the digitalization era. Under the knowledge competency parameter, six sub-competencies comprising a total of 12 variables were identified. For skills, seven sub-competencies consisting of 23 variables were identified. Regarding personal attributes, six sub-competencies with 17 variables were highlighted. Under knowledge, technical knowledge was found to be the most important with an index of 4.212. For skills, leadership skills were rated highest with an index of 4.240. Regarding personal attributes, social or interpersonal skills were deemed most critical with an index of 4.199.

Practical implications

The results provide guidance to both industry and academic stakeholders. For PMs and their employers, the study highlights priority areas for competency development and training related to the era of digitalization. It also informs educational institutions on how to structure project management curricula to best prepare students for jobs of the future. This study gives more insight into the competencies that need more attention for PMs in the digitalization era. As a result, firms that adopt the identified competency will benefit from implementing digitalization in project delivery.

Originality/value

This study makes an original contribution as one of the first to empirically investigate the competencies required of construction PMs in the construction industry in the digitalization era. By focusing on the developing country context of Ghana, the study extends knowledge to an under-researched region and market. It provides a foundation for future comparative research across diverse global contexts.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 29 April 2024

Eric Kwame Simpeh, Matilda Akoto, Henry Mensah, Divine Kwaku Ahadzie, Daniel Yaw Addai Duah and Nonic Akwasi Reney

In the Global North, affordable housing has evolved and thrived, and it is now gaining traction in the Global South, where governments have been vocal supporters of the concept…

Abstract

Purpose

In the Global North, affordable housing has evolved and thrived, and it is now gaining traction in the Global South, where governments have been vocal supporters of the concept. Therefore, this paper aims to investigate the important criteria for selecting affordable housing units in Ghana.

Design/methodology/approach

A quantitative research approach was used, and a survey was administered to the residents. The data was analysed using both descriptive and inferential statistics. The relative importance index technique was used to rank the important criteria, and the EFA technique was used to create a taxonomy system for the criteria.

Findings

The hierarchical ranking of the most significant criteria for selecting affordable housing includes community safety, waste management and access to good-quality education. Furthermore, the important criteria for selecting affordable housing are classified into two groups, namely, “sustainability criteria” and “housing demand and supply and social service provision”.

Research limitations/implications

This study has implications for the real estate industry and construction stakeholders, as this will inform decision-making in terms of the design of affordable housing and the suitability of the location for the development.

Originality/value

These findings provide a baseline to support potential homeowners and tenants in their quest to select affordable housing. Furthermore, these findings will aid future longitudinal research into the indicators or criteria for selecting suitable locations for the development of low- and middle-income housing.

Details

Urbanization, Sustainability and Society, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8993

Keywords

Article
Publication date: 8 October 2024

Emmanuel Doe Dzramado, Richard Ohene Asiedu, De-Graft Owusu-Manu, David J. Edwards, Michael Adesi and Alex Acheampong

This paper explored the socioeconomic factors affecting green cities development. Extant literature have highlighted green cities as a major path towards sustainability in the…

Abstract

Purpose

This paper explored the socioeconomic factors affecting green cities development. Extant literature have highlighted green cities as a major path towards sustainability in the construction industry but very little is known on the socioeconomic aspect of green cities and its bid in promoting sustainability in the construction industry; hence, the premise of this study which highlights the socioeconomic factors affecting green cities development in Ghana.

Design/methodology/approach

A comprehensive literature review was conducted to identify the socioeconomic factors affecting green cities. A quantitative research strategy was adopted to collect primary data from respondents who have the requisite understanding and knowledge in green cities using questionnaires. The data gathered was then analysed using descriptive statistics and exploratory factor analysis viz principal component analysis.

Findings

The socioeconomic factors affecting green city development comprised: Green support mechanisms (i.e. innovation and technology, green city planning (urban planning), stakeholder engagement, awareness, city planning (transportation) and environmental regulations); green inhibitors (i.e. population, culture, housing and policy implementation); green market and finance (i.e. digital finance, green market mechanism, green investment finance, risks and uncertainties, income levels of clients). It was evident that socioeconomic factors are significant to the development of green cities in Ghana and hence policy makers and various stakeholders should prioritize socioeconomic factors in the bid to achieve sustainability through green cities in the construction industry.

Originality/value

This paper presents a foremost and comprehensive study on the socioeconomic factors affecting green cities in Ghana. The study results showed that even though the path to sustainability in green cities has pivoted mainly on environmental factors, socioeconomic factors are also significant to green city development, hence, policy makers and the construction industry should keenly consider the socioeconomic factors affecting green city development in the bid towards sustainability for cities.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 27 April 2022

Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…

Abstract

Purpose

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.

Design/methodology/approach

The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.

Findings

From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.

Practical implications

The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.

Originality/value

The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 August 2024

Dickson Osei-Asibey, Joshua Ayarkwa, Benjamin Baah, Aba Essanowa Afful, Gloria Anokye and Prince Asher Nkrumah

Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery…

Abstract

Purpose

Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery. Moreover, PPP project stakeholders have inadequate information about the probable impacts of time-based delay imposed on PPP projects under the PPP arrangement. This study aims to identify and categorize construction stakeholders’ perceptions of the impact of time-based delays on PPP construction projects.

Design/methodology/approach

A purposive sampling technique was adopted where questionnaires were used as the primary instrument for gathering data from PPP experts. Cronbach’s alpha coefficient and Kendall’s concordance were used to measure the reliability of the scale and the respondent’s level of agreement, respectively. One sample t-test, mean score ranking and principal component analysis were used to analyse the identified time-based delay impacts.

Findings

The study revealed seven significant impacts of time-based delay on PPP construction project delivery as: “project schedule overrun”, “idling of project resources”, “project cost overrun”, “poor quality of completed works”, “delayed realization of project benefits”, “frequent arbitration/litigation in PPP projects” and “total abandonment of PPP projects”. The study further identified the top five significant impacts of time-based delay on PPP project stakeholders as: “reduction in motivation to attract investment”, “high interest on finance (loans)”, “contractor in financial crisis”, “loss of public confidence in government” and “reduction in parties’ reputation”.

Practical implications

The identified significant impacts of time-based delays will increase stakeholders’ awareness of the repercussions and effects that time-based delays may impose on PPP construction projects if not appropriately managed throughout the project implementation. This awareness will further guide stakeholders to implement targeted risk management strategies to minimize the negative consequences of delays on PPP project performance.

Originality/value

As a pioneering study that provides a better understanding of the impacts of time-based delays on PPP construction projects, this study enhances knowledge of PPP construction project implementation.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 27 September 2023

Vincent Kwame Osei-Appiah, Ernest Kissi, Victor Acheamfour Karikari, Prosper Ayeng, Eugene Danquah-Smith and Michael Adesi

Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement…

Abstract

Purpose

Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement performance positively. Works procurement has been attracting significant attention from major players due to poor performance characterized by poor performance, budget overruns and incompetence. Hence, the purpose of this study was to assess the impact of ESI on public works procurement performance.

Design/methodology/approach

Based on a thorough review of the literature for a pilot survey, the main questionnaires were administered to 103 public procurement officers. To assess the impact of ESI on public works procurement performance, three constructs that served as factors for implementing ESI and five that measure works procurement performance were validated using partial least square structural equation modelling (PLS-SEM).

Findings

The outcome of this study shows a significant positive impact of ESI on works procurement performance. This included communication, trust and supplier capabilities. The study further showed that even though cost, schedule, quality, health and safety are essential, sustainability measures are also crucial for work procurement.

Research limitations/implications

The results of this study could help firms make better decisions regarding public works procurement by encouraging ESI. This will likely significantly impact the successful project delivery and preservation of sustainability and efficiency objectives.

Originality/value

The application of PLS-SEM analysis in this study provides insights into how ESI can impact the procurement of public works in Ghana.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 18 June 2024

Carolina Busco, Jeffrey Walters and Exequiel Provoste

Public-private partnerships (PPPs) have become integral in delivering public services and infrastructure, particularly in the context of megaprojects. This paper focuses on the…

Abstract

Purpose

Public-private partnerships (PPPs) have become integral in delivering public services and infrastructure, particularly in the context of megaprojects. This paper focuses on the interplay between stakeholder management, challenges, critical success factors (CSFs), and the overall success of PPP-arranged civil infrastructure megaprojects.

Design/methodology/approach

Using the PRISMA methodology, we comprehensively analyze challenges and critical success factors (CSFs) influencing stakeholder engagement within PPP megaprojects. A focused search equation identified 595 papers, which were distilled down to 34 relevant papers and case studies. Qualitative analysis of these papers revealed 48 CSFs categorized into 11 challenges from a stakeholder management perspective, which were further delineated across public, private, and combined sectors, and then mapped along the PPP megaproject lifecycle.

Findings

Informed by a diverse amalgam of civil and project management literature, this research reveals the intricate dynamics of PPP megaprojects across the globe that emphasize the critical nature of stakeholder engagement, analysis, and management practices. Key findings highlighted conflicting interests between public and private stakeholders, manifesting in challenges like project performance versus profitability. The literature emphasized instances where neglect of local community culture led to adverse social outcomes. A universal conclusion underscored the context-specific nature of challenges and CSFs, stressing the need for a holistic understanding of stakeholders and project dynamics.

Research limitations/implications

The paper acknowledges that it focused on 34 selected papers out of 595 identified. This sample focuses on civil engineering megaprojects which may not fully represent the breadth of research in the field, potentially missing out on valuable insights from excluded studies.

Practical implications

We believe that the compiled list of CSFs, organized according to stakeholder relationships and the project lifecycle, serves as a potent tool for managers and planners. By enabling the identification of complexity from diverse perspectives, this research allows elucidating the challenges faced by the management team in PPP megaproject.

Social implications

This research identifies several social outcomes related to PPP megaprojects. Critical Success Factors identified as such should allow the project managers to maximize benefits for society and minimize risk and negative externalities.

Originality/value

This study contributes valuable insights for policies and practices by systematically describing challenges and related CSFs throughout the PPP megaproject lifecycle. Additionally, it addresses the nuanced aspects of internal and external stakeholder management, thereby contributing to the overall understanding and best practices required to confront complex megaprojects involving a wide range of stakeholder groups.

Details

International Journal of Public Sector Management, vol. 37 no. 5
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 25 May 2022

Lee Felix Anzagira, Daniel Duah, Edward Badu, Eric Kwame Simpeh and Alexander B. Marful

The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the…

Abstract

Purpose

The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the barriers to the uptake and implementation of the green building concept (GBC) in developing countries using Ghana as a case.

Design/methodology/approach

The quantitative research approach was used to attain the study’s goal. Purposive and snowball sampling techniques were found to be suitable for collecting data from 292 relevant stakeholders in Ghana’s construction industry. The mean score ranking technique, in conjunction with the relative importance index, was used to establish the relative ranking of, among other things, the stimulus measures for increasing green building uptake in Ghana. An exploratory factor analysis was also used to classify the most significant stimulation strategies for improving green building uptake.

Findings

“Educational programmes relevant to GBTs for developers, contractors, and policymakers,” “sufficient information on the cost and benefits of GBTs” and “mandated green building codes and regulations” were the top three listed stimulating measures to promote increasing use of green building technologies (GBTs). The enablers were classified as follows: government regulations and policies; commitment and GB research; education and publicity; and incentives and support.

Research limitations/implications

The study was conducted in Ghana, a developing nation, and thus the findings and implications are peculiar to Ghana. However, the study’s findings have important practical implications for the adoption and marketing of GBCs and GBTs in other developing nations.

Originality/value

Prioritizing major stimulation initiatives may be beneficial in terms of overcoming the constraints to the adoption of GBCs and GBTs in developing countries.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of 28